Forwards Environ Dose Pathway Study,Spring 1977-Fall 1978
ML19290B933
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/27/1978
From: Gilliom J
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17174B224 List:
References
FOIA-79-488 NUDOCS 7912140508
Download: ML19290B933 (1)


Text

- -

+ -.

b ir M C (eg Commonwealtn Edison

,y 72 West Adams Street. Chicago filenois m

Address Reply to. Post Ottice Box 767 Chicago, lilinois 60690 December 27, 1978 s

Mr. James G. Keppler, Regional Director Office of Inspection and Enforcement Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Environmental Dose Pathway Studies at Zion Station (NRC Dockets 50-295,50-304)

Dear Mr. Keppler:

Enclosed is the Environmental Dose Pathway Study for Zion Station Summer,1977,throughSpring,1978,asrequiredbySection6.6.3.b(2) of the Technical Specifications.

Included in the report are dis-cussions of measurements of gamma radiation dose from airborne effluents, I-131 in the air to milk pathway and tritium in the aquatic pathway.

Also included are progress reports on the current Environmental Dose Pathway Study at Dresden Station (Spring, 1978, through Spring, 1979) and the upccming study at Quad Cities Station (1979-80).

One ccpy of this report is provided for your use and 39 copies are being submitted directly to Mr. Edson G. Case, Deputy Director of the Office of nuclear Reacter Regulation.

Sincerely,

[

Y.R. Gillies General Superintendent Production Systems Anal sis

/sm for W. Eaughton h,

C Nu;1 ear Licensing Administrator 19 0 'O $D L5%

A d,

d

~

G,

/

91'ANoios 1578 329