MONTHYEARML19289F7591979-05-0808 May 1979 Notification of 790508 Meeting W/Util in Bethesda,Md to Present Design for Control Grade hard-wired Reactor Trips Based on Loss of Feedwater & Turbine Trip Conditions Project stage: Meeting ML19263E9421979-05-15015 May 1979 Summary of 790508 Meeting W/Util & Bechtel in Bethesda,Md Re Licensee Design of Hard Wire control-grade Reactor Trip Caused by Loss of Feedwater &/Or Turbine Trip & Other Matters Related to NRC Shutdown Order Project stage: Meeting ML19208A9221979-05-18018 May 1979 FOIA Request for Documents Re Sept 1977,Apr 1978,Jan 1979 & Mar 1979 Incidences at Facility,Transcripts from NRC 790405 Executive Session,Mcmillan 790416 Testimony to ACRS, Toledo Edison 790423 Conference & 790425 Meeting Project stage: Request ML19246B0761979-05-18018 May 1979 Requests Addl Info in Order to Evaluate Adequacy & Acceptability of Response to Order Issued 790516 Project stage: Other ML19289E9071979-05-19019 May 1979 Evaluation of Transient Behavior & Small Reactor Coolant Sys Breaks in 177 Fuel Assembly Plant,790516. Vol 3, Revision 1 Project stage: Other ML19289E9051979-05-22022 May 1979 Forwards Evaluation of Transient Behavior & Small Reactor Coolant Sys Breaks in 177 Fuel Assembly Plant,790516, Vol 3,Revision 1 Project stage: Other ML19289F3811979-05-23023 May 1979 Forwards Modified Operating Procedures Complying W/Nrc 790509 Order.W/Oversized Encl in Central Files Only Project stage: Other ML19259C7751979-06-27027 June 1979 Draft Fr Notice Re Authorization to Resume Operation Project stage: Draft Other ML19259C7831979-06-27027 June 1979 Draft Safety Evaluation Re Licensee Compliance W/Nrc 790516 Order.Licensee May Restart Facility Project stage: Draft Approval ML19259C7691979-06-27027 June 1979 Draft Ltr Forwarding Safety Evaluation & Fr Notice Re Authorization to Resume Operation Project stage: Draft Approval ML19259C7661979-06-27027 June 1979 Discusses Review of Util Actions Re NRC 790516 Order. Shutdown No Longer Required.Safety Evaluation & Draft Ltr to Licensee Encl Project stage: Draft Approval ML19224D3441979-06-29029 June 1979 Provides Info Re Util Handling of RO 79-062,in Response to NRC 790629 Request.Established Procedures Were Followed & Proper Evaluation & Dispositions Were Made in Reporting Failure of Auxiliary Feedwater Suction Switches Project stage: Other ML19225C7021979-06-29029 June 1979 Expresses Concern Over Util Failure to Inform NRC of 790521 RO 79-062 Involving Inoperable Auxiliary Feedwater Suction Pressure Switches & out-of-tolerance Pressure Setpoints. Submits Questions Re Mgt Awareness & Lack of Communication Project stage: Other ML19289G2651979-07-0202 July 1979 Safety Evaluation Re Licensees Compliance W/Nrc 790516 Order Project stage: Approval ML19289G2631979-07-0202 July 1979 Forwards Revised Safety Evaluation for Facility Re 790516 Shutdown Order Project stage: Approval ML19207B7291979-07-0505 July 1979 Transcript of NRC 790705 Meeting in Washington,Dc Re Review of Facility Operation.Pp 1-84 Project stage: Meeting ML19207B7161979-07-0505 July 1979 Transcript of 790705 Public Meeting in Washington,Dc Re Order Per Request for Hearing on Facility Operation. Pp 1-15 Project stage: Meeting ML19207A7381979-07-0606 July 1979 Evaluation of Licensee Compliance W/Nrc 790516 Order. Unit 1 May Resume Operation Project stage: Other ML19248D0161979-07-11011 July 1979 Summary of 790629 Meeting W/Util in Bethesda,Md to Discuss LER 79-062 Concerning Inoperability of Pressure Switches Associated w/DB-1 Auxiliary Feedwater Sys Project stage: Meeting ML15245A1051979-07-16016 July 1979 Requests Evaluation of Semiscale Small Break Experiment W/Small Break Computer Program by 790901 Project stage: Other ML19242D0791979-08-0707 August 1979 Submits Update on Status of long-term Items Per NRC 790516 Order.Discusses Auxiliary Feedwater Sys,Control Sys,Failure Modes & Effects Analysis,Transient Analysis & Procedure for Mgt of Small Breaks Project stage: Other ML16138A4101979-08-15015 August 1979 Summary of 790718 Meeting W/Util in Bethesda,Md Re B&W Small Break LOCA Analyses Project stage: Meeting 1979-06-29
[Table View] |
Text
_ _.
8ja aseg%
UNITED STATES
/,
j'.
NUCLEAR REGULATORY COMMISSION
)
)
5 Nh[ j WASHINGTON, D. C. 20555 I
yf.//
May 8, 1979 t <-%.....,
Docket No.:
50-346 MEMORANDUM FOR:
Robert W. Reid, Chief, Operating Reactors Branch #4, 00R FROM:
G. B. Zwetzig, Project Manager, ORB #4, D0R
SUBJECT:
FORTHCOMING MEETING WITH TOLED0 EDISON COMPANY (TECO)
RE: DAVIS BESSE, UNIT N0. 1 TIME & DATE:
1 p.m., May 8,1979 LOCATION:
P-422 Bethesda, Maryland PURPOSE:
TEC0 will present proposed design for control grade hard-wired reactor trips based on loss of feedwater and turbine trip conditions.
PARTICIPANTS:
NRC G. Mazetis, D. Fischer, F. Ashe B. Boger TECO T. Myers, F. Miller BECHTEL J. Ventura Genon.
. lhoject Manager 6raldB.Z tzig Operating Reactors Branch #4 Division of Operating Reactors 2228 034 790a1800/4 e