ML19283B770

From kanterella
Jump to navigation Jump to search
LER 79-007/03L-0 on 790212:during Review of Surveillance Test Data,Noted That RCS Leakage Test (FNP-1-STP-9.0) Had Not Been Done within Time Specified.Caused by Personnel Failure.Supervisors Instructed Re Matter
ML19283B770
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/14/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19283B767 List:
References
LER-79-007-03L, LER-79-7-3L, NUDOCS 7903190272
Download: ML19283B770 (1)


Text

,

17 77)

. . LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l Ih (PLE ASE PRINT OR TYPE ALL REQUf RED INFORMATION) l0 l t8 l9 l AlLICENSEE Ll Jl CODE Ml Fl 1l@l 0l 0l -l 0lLICENSE 14 15 0] 0l 0l 01 -l 0l 0l@l NUMBER 25 26 4l LICENSE 1l Il 1l TYPE1l@l JO l

$ 7 CA T 53 l@

7 CON'T o i yj"c' l Ll@l 0l 5l 0l 0 l 0l 3l 4 l 8 @l 6a 0 6'Jl 2 l 1EVENT l 2DATEl 7 l o l@l 74 075 l 3 REPORT l 1 l 4DATE l 7 l 980l@ i 7 6 60 61 DOCKET NUMB ER EVENT DESCHIPTION AND PROB ABLE CONSEQUENCES h O 2 i On 2-12-79 during a review of surveillance test data. it was determined rhne rho I i i

O 3 l "RCS Leakage Test" (FNP-1-STP-9.0) had not been performed within the time interval l I O l 41 I specified by Tech. Spec. 4.4.6.2 (115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> actual vs. 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> max allowed). [

}'

I O l s i l FNP-1-STP-9.0 has been performed within Tech. Spec. 4.4.6.2 time interval requirementq O 1s I since the occurrence. The health and safety of the general public were not affected.l I

10171 I o 8 l

  • 60 7 8 9 E CC S SCO E COMPONENT CODE SUSC dE 5 E o o Iz zlO LA_l@ l Al@

9 10 12 13 z l zi z l z i z l z l@ LzJ@ 20W @

la 19 7 8 11 SEQUEN TI AL OCCURRENCE REPORT REVISION EVENT YE AR REPORT NO. CODE TYPE N O.

LER RO

@ ,atg l-l l 010] 7l l/l l0l3l lL l l-l (_0j u

_ l217l229l 23 24 26 27 28 29 30 31 32 AK N AC O ON PL NT ME HOURS S8 (T FO t 8. S PPLIE MAN FACTURER lH l@lJ4 Zl@ l35 Zl@ lZ l@ 010l 0 0l l41 Nl@ lN@ lZ l@ 43 l44Z l 9 l 9 l 947l@

33 36 3/ 40 42 CAUSE DESCR!PTION AND CORRECTIVE ACTIONS 27 i O lThe STP was performed at 0200 on 2-7-79 (24 hrs. before its scheduled time) and l Ii l 3 l l subsequently was not performed again until 2045 on 2-11-79. As a result the maxirum l 1ii2l l time interval allowed was exceeded. Operations supervisorv oersonnel have been I

, 3 l instructed to insure that surveillance tests are performed within recuired time interv:kls.

t 4 I -

7 8 9 80 ST S  % POWER OTHER STATUS CIS O RY DISCOVERY DESCRIPTION i 5 W @ l1l0l0lhl NA l [_3]hlRevievofSnrva411,nca Tom l A TIVITY CO TENT RELEASED OF RELEASE AP.tOUNT OF ACTIVITY LOCATION OF RELEASE l l NA l l1 7

l68 l9 [?,j h [d@11 10 NA 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION -

NA l

i 7 l 0 l 0 l 0 l@l Z l@l PERSONNEL INJURIES Nuv8ER DESCRIPTION i a NA l 8 9 0 l 0 l 0 l@lIn 12 80 7

LO';S OF OR DAMAGE TO FACILITY Q TYPE D E SCRIP TION v l l9l y @l 10 NA 80 l

7 8 9 FTTTl IN i81 ISSUE DESCRIPTION NA 7903190272. i 68 69 i i isitiiiiiili 80 .

i A 3 to O

N AME OF PREPAREH W. C. Hairston. TII PHONE: N SI 900-5I % h

_. _ . . . , - m.