ML19275A695
| ML19275A695 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 07/11/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19275A677 | List: |
| References | |
| NUDOCS 7910180128 | |
| Download: ML19275A695 (2) | |
See also: IR 05000324/1979022
Text
kR RfC
o,
UN:TED STATES
,, f 7,
NUCLEAR REGULATORY COMMISSION
e
,
3
/
/
E
REGION 11
0,
101 MARIETTA sT.. N.W.. sulTE 3100
ATLANTA. GEORGIA 30303
V
j
- ...+
In Reply Refer To:
g y 1 jg79
RII:HDJ
50-324/79-22
50-325/79-22
Carolina-Power and Light Company
ATTN: Mr. J. A. Jones
Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers
t-
the inspection conducted by W. A. Ruhlman of this office on
June 7-8, 1979, of activities autherized by NRC License Nos. DPR-62 and DPR-71
for the Brunswick Steam Electric Plant, Units 1 '.nd 2, and to the discussion of
our findings held with A. C. Tollison, Jr. , at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection r? port.
Within these areas, the inspection consisted of
selective examinations of procedures and representative recorda, interviews with
personnel, and observations by the inspectors.
Three (3) new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item nd references
to pertinent requirements are listed in the Notice of Vi.lation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report wil.1 be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 6ys to this of fice to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
l
bb
80 k
cA 01
.
JUL 1 1 1979
Carolina Power and Light Company
-2-
-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
C.
ichard
. ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/79-22
and 50-325/79-22
cc w/ enc 1:
A. C. To11ison, Jr.
Plant Manager
Box 458
Southport, NC 28461
1185 025