s
's i.
p$~P&L 5wer a tight company
,Q August 6, 1979 FILE: NG-3513(B)'3l.YJ SERIAL: GD-79-1971 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 & 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 RESPONSE TO INFRACTIONS OF NRC REQUIREMENTS
Dear Mr. O'Reilly:
Brunswick Steam Electric Plant has reviewed IE Inspection Report 50-324/79-22 and 50-325/79-22 and finds that it does not contain any information of a proprietary nature.
The report identified one item which appears to deviate from NRC requirements. That item and Carolina Power & Light Company's response to it are addressed in the following text:
Deficiency:
As required by Technical Specification 6.8.1, procedures shall be written and implemented. Procedure TI-200, Appendix A, requires formal classroom lectures for licensees scoring less that 80% in a specific area of an annual examination.
Contrary to the above, Procedure TI-200, Appendix A, was not implemented in that of eight (8) lecture series conducted in 1978. Four (4) were conducted largely or in part as self-study periods.
Specifically, the lecture on radiation protection was conducted with no instructor available for 90% of the time. The lectures on general and specific operating characteristics were conducted with no instructor available for 50% of the time, and the lecture on instrumentation was conducted with no instructor available for 20% of the time.
Carolina Power & Light Company's Response:
During 1978, the Training Coordinator's decision was to provide self-reading material prepared by the training staff, lectures, and question-apd-answer sessions conducted by competent personnel on particular~ topics, and problem-solving sessions. Although a lecturer was not 'present during all retraining sessions, the Training Coordinator felt that this training was worthwhile and in accordance with 10CFR55, Appendix A, Section 2.
7910180
, _{
a a__
411 Fayettevole Street e P. O. Box 1551 e Raleigh N. C. 27602 mm,,a p _~
w1
~
e
~
Mr. James P. O'Reilly Au;ii t 6,1979
~
=
A revision to TI-200 will be written to provide more explicit guidance to the training staff on the acceptable methods of conducting operator retraining. This revision will be completed by August 31, 1979.
Yours very truly,-
V H. R. Banks Manager Nuclear Generation SBT/j ga*
/.
1185 023 e, me+
d