Addresses Wa Ruhlman Concerns Re Operator Testing on self-study Topics & Revision of Training Instruction TI-200, App A.Training Commitment Will Be Completed by 791213. Operators Passed Lecture Series Topical Examinations
ML19275A681
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/06/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19275A677 List:
References
GD-79-2218, NUDOCS 7910180112
Download: ML19275A681 (1)


Text

CpaL Carolina r ver & Light Company September 6, 1979 FILE: NG-3513 (B)

SERIAL: GD-79-2218 a

-~

Mr. James P. O'Reilly, Director 1;8 U. S. Nuclear Regulatory Commission Regiot II

+

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 cm BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 SUPPLEMENT TO S

b CT S

C REQUIREMENTS

Dear Mr. O'Reilly:

During a follow-up inspection to I.E.

Inspection Report 324-325/79-02, your Mr. W. A. Ruhlman reviewed our response to his Inspection Report 324-325/79-22 and stated that a supplement.al response should be issued. This supplement is to address his concerns of operator testing on self-study topics and how Training Instruction TI-200, Appendix A, would be revised.

All operators passed topical examinations on the lecture series conducted by self-study during 1978.

Training Ia-truction TI-200, Appendix A, will be revised by August 31, 1979, to define classroom training in accordance with 10 CFR 55, Appendix A.

This will prevent a future recurrence of this problem.

During the plant exit meeting with Mr. Ruhlman for Inspection Report 324-325/79-22, CP&L committed to update Three Mile Island training in accordance with I.E.Bulletin 79-08, and a testing program of that training, by September 1, 1979. We currently plan to provide this training during the 1979 operator retraining program to be conducted from August through December; therefore, unless otherwise notified, we will coc:pletc this commitment by December 31, 1979.

You s v ry truly,

/

Y H. R. Banks Manager g.

02i Nuclear Generation 3

RMP/CSB: men

  • 80 I )

79101 411 Fayetteville Street

  • P. O. Box 1551
  • Rat gh, N. C. 27602 g%]