Text
-
4 APPENDIXj NOTICE OF VI0I.ATION License Nos. CPPR-116 Duke Power Company CPPR-Il7 Catawba Nuclear Station Based on tha hPC inspection March 13-16, 1979, certain of your activities were apparently not conducted in full compliance with h7C requirements as indicated below. These items have been categorized as described in corte-spondence to you dated December 31, 1974.
As required by Criterion XVII of Appendix B to 10 CFR 50, and implemented A.
by Duke Power Company (DPC) Catawba Nuclear Station PSAR, Section 17.1.17,
" Sufficient records shall be maintained to furnish evidence of activities affecting quality.
The records shall also include closely related data such as qualification of personnel.
Contrary to the above, licensee records do not substantiate welder qualification maintenance for welder A60 from June 25, 1978 to August 8, 1978.
This is 2 deficiency.
As required by Criterion XIII of Appendix B to 10 CFR 50, and implemented B.
by DPC Topical Report, Duke - 1, Section 17.1.13.2, " Measures shall be established to control the handling, storage, shipping, cleaning and preservation of material and equipment in accordance with work and When neces-inspection instructions to prevent damage or deterioration.
sary for particular products, special protective environments, such as inert gas atmosphere.
shall be specified and provided." DPC Procedure P-3 sets forth inspection procedures for items requiring special storage and maintenance.
Form P-3A is utilized to document equipment special storage and maintenance inspections.
Contrary to the above, four containment spray heat exchangers had been stored on site since December 12, 1978 without a periodic inspection On March 15, 1979 nitrogen program to verify nitrogen blanket pressure.
gage pressure readings indicated a loss of nitrogen blanket pressure on three of the four containment spray heat exchangers stored on site.
This is an infraction.