Forwards IE Insp Repts 50-413/79-05 & 50-414/79-05 on 790313-16 & Notice of Violation
ML19273C018
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/13/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML18024B535 List:
References
NUDOCS 7906180752
Download: ML19273C018 (2)


See also: IR 05000413/1979005

Text

'

'

g.

UNITED STATES

[#"I%q[o

NUCLE AR REGULATORY COMMISSION

,

g

REGloN !!

y

)

g

101 M ARIETT A sTR E E T. N.W.

  • -

.c

[

ATLANT A, GE oRGI A 30303

"

o,

% ,,,, . /

APR 131979

In Reply Refer To:

RII:CRM

50-413/79-5

50-414/79-5

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

March 13-16, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Plant, and to the discussion of

our findings held with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. W thin these areas, the inspection consisted of

selective examinations of prot.;dures and representative records, interviews

with personnel, and observations by the intepectors.

We have examined acticas you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

During this inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 regt. ires you to submit to this of fice,

within 20 days of your receipt of this notice, a written statement or explana-

tion in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

With regard to deficiency 413-414/79-05-03 corrective actions to prevent recur-

rence were completed prior to conclusion of this inspection; therefore, a reply

is not requested for this item.

In accordance with Section 2.790 of the NEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

2353 056

79061807fA .

.

.

,

4

Duke Power Company

-2-

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such inforuation from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document. If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to dis-

cuss them with you.

Sincerely,

)

ll. l

OS

, C. E. Murphy, Chief

' Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/79-5

and 50-414/79-5

cc w/ encl:

D. G. Beam, Project Manager

P. O. Box 223

2353 057

Clover, SC 27910

\\./}

,

\\/

!