Forwards IE Insp Rept 50-369/79-14 on 790221-23 & Notice of Violation
ML19269D348
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 03/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19269D345 List:
References
NUDOCS 7906020124
Download: ML19269D348 (2)


See also: IR 05000369/1979014

Text

.

.

e

~

'

u

UNITED STATES

  1. pn nao

o,,

NUCLEAR REGULATORY COMMISSION

f

g

REGION il

  • -

E

101 MARIETTA STREET. N.W.

ATLANTA, GEORG! A 303o3

%...../

. 2 I I373

In Reply Refer To:

RII:DKW

50-369/79-14

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

Post Office Box 33189

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. D. K. Waiters of this

office on February 21-23, 1979 of activities authori e d by NRC License

No. CPPR-83 for the McGuire facility, Unit 1, and to the discussion of

our findings held with Mr. J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information tbr.t you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to wir.hhold such information

from public disclosure. Any such application zust include a full statement

of the reasons on the basis of which it is claimed that the information

2265

192

'~

7906020124

.

.

.

.

.

.

Duke Power Company

-2-

NUdl 211979

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

,

Charles E.

u

y, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-369/79-14

cc w/ enclosures:

Mr. M. D. McIntosh, Plant Manager

McGuire Nuclear Station

Post Office Box 488

Cornelius, North Carolina 28031

Mr. J. C. Rogers, Project Manager

McGuire Nuclear Station

2265

19-5

Post Office Box 33189

Charlotte, North Carolina 28242

-