LER 78-097/01X-1 on 781215:during Instrument Surveillance Procedure F-ISP 10,the 8 Temp Switches Associated W/ Isolation of HPCI Sys Steam Line Were Set Above Tech Spec Limits.Caused by Use of Wrong Conversion Table
ML19263A858
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/27/1978
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19263A849 List:
References
LER-78-097-01X, LER-78-97-1X, NUDOCS 7901030162
Download: ML19263A858 (2)


Text

NRC FORM 36 v. s. nucLean neuuta a un cummimviv (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK:

1 l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l 1o l1 lil@[_

a l 157 CAT 68l@

o 1 7 8 l N lLICENSEE 9 Y l JCODE  ! A l F l 1 l@15l 0 l LICENSE 14 0 l - NUM8EH l 0 l 0 l 0 l 0 l25 - l 260 l 0UCENSE l@l TYPE Jo CON'T 0

? 8 5O[$iC 60 l L }@] 61 O l DOCKET 5 l 0 NUM8ER l 0 l 0 l 3 l 683 l 3 69

@l EVENT 1 12DATE l 1 l 5 I 7 l 758 l@l1 74 REPORTl?I'l7 DATE Ii lR 80 l@

EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h a 2 l Please See Attachment I o l a l o 4 l l

0 s l l l

0 6 L 0 7  !

I o a l E CODE SUSC DE COMPONENT C00E SUSC O'E SUS E O 9 l C lJ l@ W@ lC h l I l NI S l T l R l U lh [_E_j@ W h 18 19 20 7 8 9 'O 11 12 13 SEQUENTI A L OCCURRENCE REPORT REVISION EVENT YEAR R EPORT NO. CODE TYPE N O.

@ y*LE u'OER RO a7 l 7l 8 l-l l Ol 9 7l l/l l0l1l l Xl (--j l1l 21 22 23 24 26 27 28 29 30 31 32 AK N ACION O PL NT MEh HOURS S8 I FO 8. SUF L MANUFACTURER lEl@]Gl@

33 34 lZ 35 l@ l36 Zl@ l 0l0l0l0l 31 40 45 Yl@ lNl@

42 lAl@ lTl2l8l7l@

43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i O l Please See Attachment I i i l ]

I i 2 I I

i a i l

mI 8 9 7

80 ST S  % POWER OTHER STATUS 015 RY DISCOVERY DESCRIPTION NA l Bl@l Surveillance Test l s

l E l@ l 0 l 6 l 9 l@l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA NA l i s lZ @ Wgl PERSONNEL EXPOSU ES NUV8ER TYPE DESCRIPTION 4A l 1 7 l 0 l 0 l 0 l@l Z l@l PERSONNEt iN3uYiES

" Y NUM8ER DESCRIPTION i NA l a

l 0 l 0 l 0 l@l12 80 7 8 9 11 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION j

R lEl@!

7 8 9 10 NA 80 USU NRC USE ONLY p

NA i lllllllllllll; I.nOJ b @l ** ' 5 7S 010 3 0 lb 7L PHONE:

NAME OF PREPARER

. .'Y ATTACHMENT TO LER-78-097/01X-1 Page 1 of I During normal operation, while performing Instrument Surveillance Procedure, F-ISP-10, titled HPCI/RCIC Steam Line High Temperature, the eight (8) temperature switches associated with isolation of the HPCI system steam line due to line rupture were found set at approximately 1780 This is contrary to Technical Specification Appendi:: A, Table 3.2-2 which requires the switches to be set < 40_

above maximum a:Sient temperature. Maximum ambient temperature is assumed to be 100 thus the maximum allowed setting is 140 .

Improper setting of the temperature switches at 178 could have prevented isolation of the HPCI Steam Line due to a large steam leak or rupture or have caused some delay in the isolation until the area temperature reached 178 . Two (2) other isolation subsystems (low HPCI steam line pressure and high HPCI steam line flow) were fully operable. Since the outboard containment isolation valve for the HPCI system (23-MOV-16) is normally closed (HPCI in standby) and the line is maintained warm and pressurred by a small (one inch) bypass valve (23-MOV-60) and line around 23-50V-60, large leaks in the HPCI steam line would quickly cause isointion (close signals to the inboard, outboard and outboard bypass valves) due to low steam line pressure when the system is in the standby mode. If the system was in operation (23-MOV-16 open) when a large leak occurred, the high steam ficw subsystem would quickly isolate the steam line.

This surveillance (F-ISP-10), which is performed monthly, utilizes a milli-volt potentiometer to check thermecouple output voltages. The test instrument (millivolt potentiometer) normally used is direct reading in OF. During the November 1978 Surveillance a backup instrument whic!. read out in millivolts was used because the other instrument was off site for calibration. When the backup instrument is used conversion tables (millivolts to0 F) must also be used. Through error, the wrong conversion table was used which resulted in adjustment of the eight(8) temperature switches (13-TS-102C,13-TS-102D,13-TS-107C,13-TS-107D, 23-TS-94A, 23-TS-94B, 23-TS-117a and 23-TS-117B) 38 higher than they should have been. During the December 1978 Surveillance, the direct reading instrument was used and as each of the eight (8) temperature switches was found out of specifi-cation, it was readjusted to within specification (135 ) . To preclude recurrence the procedure (F-ISP-10) was revised on December 18, 1978 by adding reference to the actual millivolt reading required rather than simply the equivalent temperature.

NOTE: Revision 1 of this LER is submitted to provide the required 14-day follow-up of a prompt reportable event and provide additional details relating to event description, probable consequences, cause description, and corrective cction.