IE Insp Repts 50-413/79-07 & 50-414/79-07 on 790423-26.No Noncompliance Noted.Major Areas Inspected:Structural Concrete,Concrete Expansion anchors,safety-related Components & Pipe Support & Restraint Sys
ML19261E123
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/10/1979
From: Bryant J, Compton R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19261E119 List:
References
50-413-79-07, 50-413-79-7, 50-414-79-07, 50-414-79-7, NUDOCS 7907050157
Download: ML19261E123 (4)


See also: IR 05000413/1979007

Text

.

-

UNITED STATsS

(k* "f 00g

g

[

jo,,

NUCLEAR REGULATORY COMMISSION

REGION tl

2

3q(

g

{

' C ,, , t

101 M AR ETT A sT R E ET, N.W.

0

ATLANTA GEORGI A 30303

o

-

o$

',

%

.....

.

Report Nos. 50-413/79-07 and 50-414/79-07

Licensee: Tennessee Valley Authority

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Facility Name:

Catawba Nuclear Station, Units 1 and 2

Docket Nos. 50-413 and 50-414

Licea.;e Nos. CPPR-116 and CPPR-117

Inspection at Catawba site near Rock 'till, South Carolina

Inspector:

[ \\Lu

80!7 9

.

,

h. M. Compton \\

Date signed

g[

f[p//9

Approved by:

_

'. _

ry - , Section Chief, RC&ES Branch

Date Signed

.

/

Ir. pectio on April 23-26, 1979

Areas Inspected

This routine, unannounced inspection involved 22 inspector-hours <

in the areas of structural concrete, concrete expansion anchors.

-

related components, pipe support and restraint systems and licens e

actions on previous inspection findings.

Results

Of the areas inspected, no apparent items of noncompliance or deviations

were identified.

%} Q

'

287

097

7907050/5 7

---

-

.- .

.

.

.

-

a

'

.

.

DETAILS

1.

Persons Contacted

Licensee Employees

  • D. G. Beam, Project Man.ger
  • R. A. Mo gan, Senior QA Engineer
  • L. R. Davison, Senior QC Engineer
  • u

9 Mason, QA Engineer

. ;rumm, Assistant QA Engineer

C. V. Sheriff, Supervisory Technician, Civil QC

P. L. Atkins, Assistant QA Engineer

  • Attended the Exit Interview.

2.

Exit Interview

The inspection scope and findings were summarized on April 26, 1979

with those persons indicated in paragraph I above.

The Licensee

was advised that no new items of noncompliance or deviation were

identified by this inspector.

3.

Licensee Action on Previous Inspection Findings

(0 pen) Infraction 413/79-06-01: Failure to follow procedure for

containment dome concrete inspections. Nonconformance Item (NCI)

5252 and form M-2N's, " Final Concrete Inspection Log", documenting

the locations, sizes and corrective actions for excavations of

questionable concrete were reviewed. The inspector examined the

inside and outside surfaces of the dome, including repair work

accomplished.

Inspections and repair work were in the final stages.

The investigation report being prepared by the technical support

group was reviewed in draf t form and was discussed with involved

personnel. This item remains open pending evaluation of the licensee's

report and final corrective actions.

4.

Unresolved Items

Unresolved items were not identified during this inspection.

5.

Independent Inspection Effort-Units 1 and 2

The inspector witnessed partial placement of Unit 2 new fuel

a.

building wall pour number 3015.

Aggregate stockpiles, in

process testing, batch plant operations and equipment calibration

were also observed.

Batch plant and structural QC inspectors

287

098

g

.

_

.

e

-2-

-

were interviewei concerning procedural raquirements snd their

responsibilities. Acceptance criteria for these activities

are contained in Specification CNS-1109.00-1, Revision 15,

" Specification for Concrete for Category I Structures" and QA

Pror fure M-2, Revision 15, " Inspection of Design Concret.e".

No it .:ms of noncompliance or deviations were identified.

b.

The follaving installed and QC inspected pipe supports were

examined for compliance with procedural and drawing requirements:

1-R-NV-1217

1-A-RN-V4113

1-R-RN-1018

1-A-RN-4070

1-R-RN-1019

1-R-RN-408

1-R-RN-1017

Fabrication, erection nnd inspection requirements are detailed

in the following docurents:

QA Procedure M-15, Revision 10, " Installed Pipe Support

Inspection"

QA Procedure M-51, Revision 3, " Component Supports"

Specification CNS-1206.00-4.0, Revision 6, " Component

Support Procurement Specification"

Specification CNS-1206.00-4.3,' Revision 2, " Procedure

Requirements for Fabrication and Erection of Hangers,

Supports and Seismic Controls"

ASME Boiler and Pressure Vessel Code,Section III, Subsection

NF, 1974 edition through summer 1975 Addenda

No items of noncompliance or deviations were identified.

(0 pen) Inspector Followup Item 413/79-03-01: Concrete expansion

c.

anchor installation and inspection procedures. A draft revision

to QA Procedure M-52, " Concrete Expansion Anchor Installation

Inspection", providing more consistent testing requirements

and Variation Notice 5402 providing acceptance criteria for

gaps behind baseplates were reviewed and discussed. This item

remains open pending review of issued document changes addressing

these areas.

287

009

UN $%

_

..

-

,.

t

-3-

.

6.

Safety-Related Components-Review of Quality Assurance

Implementing Procedures - Unit 1

The inspector reviewed proposed revisions to QA Procedures M-9,

" Mechanical Equipment Installation Inspection", and M-18, " Inspection

of Structural Steel Erection" that would specifically include the

inspection of mechanical equipment supports as part of M-18.

The

necessity to backfit these new requirements to equipment already

installed or being installed was discussed.

Previously identified

Inspector Followup Item 413/79-03-02: Inspection requirements for

site fabricated component supports, will remain open pending review

of issued procedure revisions.

No items of noncompliance or deviations were identified.

287

100

,

b

k

.