Forwards IE Insp Repts 50-413/79-07 & 50-414/79-07 on 790423-26.No Noncompliance Noted
ML19261E121
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19261E119 List:
References
NUDOCS 7907050154
Download: ML19261E121 (2)


See also: IR 05000413/1979007

Text

.

.

k .'

p ar%

UNITED STATES

g

jo,,

NUCtEAR REGULATORY COMMISSION

REGloN ll

O

3e(

g

101 M ARIETTA sTR E ET, N.ed.

7*g"

nt

,

[

ATLANTA, GEORGIA 30303

o.

MAY 101979

.....

.

In Reply Refer To:

RII:RMC

50-413/79-7

50-414/79-7

Duke Power Company

Atta:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection cond n ed by R. M. Compton of this office

on April 23-26, 1979 of activities authorized by NRC License hos. CPPR-116

and CPPR-117 for the Catawba Nuclear Station facility, Units 1 and 2,

and to the discussion of our findings held with D. G. Beam at the conclu-

sinn of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to pre-iously identi-

fied enforcement matters. These are discussed in the enclosed inspection

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

,

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

>

~

.

287

095

tk?]

GN #pe?

s

_ _

.

.

-

.

g

MAY I 01979

.

Duke Power Company

-2-

,

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely

A

N

Charles E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Euclosures:

Inspection Report Nos. 50-413/79-7

and 50-414/79-7

cc w/ enclosures:

D. G. Beam, Project Manager

Post Office Box 223

Clover, South Carolina 29710