Forwards Request for Addl Info in Order to Complete Review Re Revised Westinghouse Thermal Design Procedure & WRB-1 Critical Heat Flux Correlation.Requests Response as Soon as Possible
ML19261B737
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/26/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
References
TAC-07329, TAC-7329, NUDOCS 7903010466
Download: ML19261B737 (3)


Text

b..*

4 UNITED STATES j

e' t

NUCLEAR REGULATORY COMMisslON f

W ASHINGTON, D. C. 20555 h%, %'Y #

January 26, 1979 Docket No. 50-344 Mr. Charles Goodwin, Jr.

Assistant Vice President Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Goodwin:

In conducting our review of your.hnuary 5,1979 request relating to the revised Westinghouse themal design procedure and the WRB-1 critical heat flux correlation for the Trojan Nuclear Plant, we have det.erminea tnat we will need the additional information identified in the enclosure to continue the review. This request is the same as that telecopied to you on January 18, 1979.

Since receipt of this infonnation is basic to our review, your response is requested as soon as possible. It is likely that further additional information will be needed in order to complete our reviaw.

Three signed originals and forty copies are required.

Please cor. tact us if you have any questions concerning this request.

Sincerely,

/

, piamdts A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Enclosure:

Request for Additional Infomation cc: w/ enclosure See next page 7903010 %

/

Portland General Electric Company January 26, 1979 cc: Mr. H. H. Phillips Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Warren Hastings, Esquire Counsel for Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Mr. J. L. Frewing, Manager Generation Licensing and Analysis Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Columbia County Courthouse Law Library, Circuit Court Room St. Helens, Oregon 97501 Director, Oregon Department of Energy Labor & Industries Building, Rm.111 Salem, Oregon 97310 Richard M. Sandvik, Esquire Counsel for Oregon Energy Facility Siting Counsel and Oregon Department of Energy 500 Daci#ic Buildin-520 5.,

iar,1ii Portland, Oregon 97204 Michael Malmrose U. S. Nuclear Regulatory Comnission Trojan Nuclear Plant P. O. Box 0 Rainier, Oregon 97048

=

REQUEST FOR ADDITIONAL INFORMATION TROJAN NUCLEAR PLANT 1.

Submit the sensitivity factors, Si, used for the Trojan analysis as required by the staff Safety Evaluation Report on WCAP 8567/8568.

" Improved Thermal Design Procedure" (April 10,1978).

2.

If these sensitivity factors have changed from those previously app *cved bv the staff. then a linearity test is recuired by the same staff Safety Evaluation Report. Please either reference previous staff approval for the sensitivity factors you are using or provide the results of such a linearity test.

Acco-ding to the staff SER on WCAP 8567 (referenced in request 1) 3.

sensitivity factors are also required for three loop operating conditions. Please provide these and also the results of the corresponding linearity tests.

4.

Describe how the effect of fuel rod bowing on.DNBR was included in the proposed Technical Specifications chances.