j)lcPDL o#

j UNITED STATES y-NUCLEAR REGULATORY COMMISSION j

11,j WASHINGTON, D. C. 20555 1,- - D [,f February 7, 1979

,~

Docket No. 50-344 Mr. Charles Goodwin, Jr.

Assistant Vice President Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204

Dear Mr. Goodwin:

In conducting our review of your January 5,1979 request relating to the revised Westinghouse thermal design procedure and the WRB-1 critical heat flux correlation for the Trojan Nuclear Plant, we have determined that we will need the additional information identified in the enclosure to con-tinue the review. This information is the same as that discussed with members of your staff on or about January 31, 1979.

Three signed originals and forty copies of your response are required. Please contact us if you have any questions concerning this request.

Sincerel,'

~

&W'A W

./

A. Schwencer, Chief Operating Reactors Bran.n #1 Division of Operating Reactors

Enclosure:

Request ter Additional Informathn cc W/

Enclosure:

See next page s

7903130432-

Portland General Electric Company February 7,1979 cc:

Mr. H. H. Phillips Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Warren Hastings, Esquire Counsel for Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Mr. J. L. Frewing, Manager Generation Licensing and Analysis Portland General Electric Company 121 SW Salmon Street Portland, Oregon 97204 Columbia County Courthou:e Law Library, Circuit Court m

St. Helens Oregen 97501 s

Director, Oregon Department of Energy Labor & Industries Building, Rm. 111 Salem, Oregon 97310 Richard M. Sandvik, Esquire Counsel for Oregon Energy Facility Siting Counsel and Oregon Department of Energy 500 Pacific Building 520 SW Yamhill Portland, Oregon 97204 Michael Malmrose U. S. Nuclear Regulatory Comission Trojan Nuclear Plant P. O. Box 0 Rainier, Oregon 97048

i.

~

e REQUEST FOR ADDITIONAL INFORMATION TROJAN NUCLEAR PLANT 1.

Provide a block diagram depicting sensor, process equipment, computer and readout devices for each parameter channel used in the uncertainty analysis. Within each element of the block diagram, identify the accuracy, drift, range, span, operating limits and setpoints. Identify the overall accuracy of each channel transmitter to final output and specify the minimum acceptable accuracy for use with the new procedure. Also identify the overall accuracy of the final output value and maximum accuracy requirements for each input channel 'i this final output device.

2.

Provide data to verify that the plant instruments will perform with a high degree of confidence, within their design accuracies.

This information may be obtained from operating history of identical instruments installed in other plants. This request pertains to the instruments affecting the uncertainties in the design procedure (as identified in question 1 above), the over-temperature AT trip, the high flux trip, and low pressure trip and the pump voltage trip.