Forwards Rev 0 to Temporary Plant Test TPT-166, Reactor Coolant Thermal Expansion Test Final Predictive Curves Heatup of 860615-16, Demonstrating That Acceptance Criteria Met
ML20211G407
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/16/1986
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20211G412 List:
References
TAC-61405, NUDOCS 8606190402
Download: ML20211G407 (1)


Text

__________ _.

  • s m muses e N N r - E: Bart D Weers Vce Pres &rt June 16, 1986 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN: Mr. Steven A. Varga Director, PWR-A Project Directorate No. 3 U.S. Nuclear Regulatory Comission Washington DC 20555

Dear Sir:

Certified Results of the RCS Thermal Expansion Monitoring Program Our letter of June 13, 1986 committed to provide the final heatup monitoring predictive curves for those locations where reshimming occurred. Attached are those final predictive curves which demonstrate that the acceptance criteria have been met. The final certification sheet from the monitoring program procedure is also attached certifying that all monitoring program acceptance criteria have been met.

Sincerely, W

Bart D. Withers Vice President Nuclear Attachments c:' Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. Lynn Frank, Director State of Oregon Department of Energy 8606190402 860616 4 PDR ADCCK 0b00 P