05000333/LER-1980-005-03, /03L-0:on 800107,during Review of Reactor Water Chemistry Data,Noted That Some Required Samples Were Not Obtained.Technicians Did Not Take Samples Due to Low Level Conductivity & Chloride Ion Concentrations

From kanterella
(Redirected from ML19260D644)
Jump to navigation Jump to search
/03L-0:on 800107,during Review of Reactor Water Chemistry Data,Noted That Some Required Samples Were Not Obtained.Technicians Did Not Take Samples Due to Low Level Conductivity & Chloride Ion Concentrations
ML19260D644
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/06/1980
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19260D633 List:
References
LER-80-005-03L, LER-80-5-3L, NUDOCS 8002110536
Download: ML19260D644 (2)


LER-1980-005, /03L-0:on 800107,during Review of Reactor Water Chemistry Data,Noted That Some Required Samples Were Not Obtained.Technicians Did Not Take Samples Due to Low Level Conductivity & Chloride Ion Concentrations
Event date:
Report date:
3331980005R03 - NRC Website

text

17 77) i LICENSEE EVENT HEPORT cONinoleLOCK: l l

l l

l l

1@

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI lo lil N lY lJ l A lF l1 l@lOl0l-l0l0lO!O!-l0l01ol@l4 1 l 11 1l 1 @l l

l@

7 8 9 LICENSEE CODE 14 t$

LICENSE NUMBEH JS 26 LICENSE TYPE Jo

$7 CAi $8 CON'T l L l@l0 l 5 10 10 lo 1313 31@l 0 l 1101718lOl@l012 l01618 lo l@

0 s

R 7

8 00 61 DOCKET NUMi3ER h3 69 EVENT OATE 14 7S HEPOHT DAT E 80 EVENT DESCniPTION AND PROBABLE CONSEQUENCES h o

2 l

During a management review of reactor water chemistry data it was g

discovered that some samples required by T.S. 3.6.0.1.c were not g

o 3

g obtained.

No significant hazard existed.

n o

,, [

See attachment for details.

O 6

l l

0l7 l

l ola l l

80 7

8 9 S Y S T E '.I

CAUSE

CAUSE C C'.* P VALVE CODE CCCE SUPCUDE COMPONEN T CODE SUt4 C C D E SUFCODE o19 l Z l Zj(@ [A l @ l Dj g l Zl Zl Zl Zl Zj Z g { g jZ l g 7

8 9

10 11 11 13 1d IJ 20 SE Q1;r N TI AL OCCURHFNCE HEPOHT R E VISION EVENT vf AH PE PORT NO.

CODE TYPE N O.

@ ;LE A HO18101 1-l 10101 si Ld 10131 It I l-l lo

".=

_ 21 JJ 23 24 2h 27 2d 2's Ju 31 32 ACTION FUTUHE EFFECT SHUTDOWN ATT ACHUF N T NPRO4 PRIME COMP.

COVPONE *J T TAKEN ACTION ON PL ANT METHOD HOURS SUBYlTTt.O FORM du9.

SUPP L I E H MANUFACTUHER lH l@lZ l@

l Z l@

l Zl@

0 l0 l 0l l

Ylg ltilg [Zjg lZl9 9[9l 33 J4 35 3ti 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTlvE ACTIONS h l

Technical personnel did not believe any sample was required due to the l

o i

i l

low level s of conduct ivi ty and chloride ion concentrations.

The event i

i i 1

was di scussed wi th the technicians to preclude recurrence.

I s

l See attachment for details

]

i i

l l

i

.i 7

3 9 A0

"' POv;E R OTHE R S T A TUS t C HY DISCOVEHY DESCRIPYlON ST li { s l [gj@ l Ol 91 5lh NA l

l A l@l Manaaement Review l

A TlviTY CO TENT HE L E A';F D GF HE LT A AMOUNT QF AC TlviTY LOC AT ION OF ItE L E ASE l Z l (p l Z lg';F flA l

NA l

t 1

J

'l IJ 11 44 45 dd PE R',0NNF L E X PUWillO

  • P.'u l H TYPr DE LLIh P T'ON I

PE H SONP.E L INJU6 IL S NI E*'t f si OESCniPTION

@)l HA l

I I' O O O 7

H 9 11 I?

HO LO',0 OF OR D AM AGE TO F ACill TY TWF DE SCHIP T iO N lZi@l NA 1 O A 'l 9Il/l l

I

'l I

bL 7

d J 10 PUtlLtCITY NHC USE ONLY I!.';y g g@ D E SC RIP T ION l

l NA

'I III IIIIIIIIl I 2 I HI IN 7

s 9 10 68 69 80 N A*.1E OF PREPAHER PHONE:

o so mo 53g

~

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TO LER 80-005/03L-0 Page 1 of 1 During a management review of reactor water chemistry data, it was discovered that during a reactor startup which was conducted on December 30, 1979, some of the reactor water samples required by Technical Specifications Paragraph 4.6.C.1.c were not conducted. The referenced paragraph requires samples every four (4) hours.

From 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> until 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> (10.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />) no samples were taken.

During the reactor startup of concern, which was commenced at 0211 hours0.00244 days <br />0.0586 hours <br />3.488757e-4 weeks <br />8.02855e-5 months <br /> on December 30, 1979, reactor water samples were obtained as listed below:

Date Time Remarks 12/29/79 2215 Prior to startup 12/30/79 0211 Startup initiated 12/30/79 0400 12/30/79 1430 12/30/79 1830 12/30/79 1950 Mode switch in run Analysis of the above listed samples showed a reactor water conductivity of less than 1 micromho/cm, a chloride ion concentration of less than 0.1 ppm and a gross gamma ;ount which indicated that the total iodine concentration was less than 0.007 microcuries/ml.

The event did not represent a significant hazard to the public health and safety.

To preclude recurrence, the Radiation Protection Supervisor has discussed this event with the Radiological and Environmental Services Technicians and stressed the importance of obtaining each of the samples as required by Technicial Specifications.