Proposed Tech Spec Changes Re Spent Fuel Pool Storage ExpansionML19259C589 |
Person / Time |
---|
Site: |
Hatch |
---|
Issue date: |
07/09/1979 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML19259C588 |
List: |
---|
References |
---|
NUDOCS 7907170069 |
Download: ML19259C589 (8) |
|
Similar Documents at Hatch |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20205H1761999-04-0606 April 1999 Proposed Tech Specs Allowing Plant Hatch to Increase Storage Capacity of Each Units SFP ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% ML20141C0991997-05-30030 May 1997 Proposed Tech Specs Revising Requirements for Power Sources to Valves Associated W/Low Pressure Coolant Injection (LPCI) Mode of RHR Sys.Pages E3-1, 3.5-3,3.8-5,3.8-27 (Unit 1), 3.5-4,3.8-5,3.8-27 (Unit 2) Not Revd W/Incoming Submittal ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained ML20073G9631994-09-23023 September 1994 Proposed Improved Ts,Rev E ML20073D3231994-09-20020 September 1994 Proposed Tech Specs Change to Unit 1 TSs Re EDG Operability Requirements During Reactor Shut Down Conditions ML20072V3641994-08-31031 August 1994 Proposed Tech Specs Re Improved Standard Ts,Rev D ML20072H0571994-08-16016 August 1994 Proposed TS 3.9.C,allowing Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys ML20072E4021994-08-0808 August 1994 Proposed Tech Specs Re Rev Insertion Instructions Rev C ML20072B7541994-08-0404 August 1994 Proposed Tech Specs Re Traversing Incore Probe Operability Requirements ML20071H8381994-07-19019 July 1994 Proposed TS 3.3.6.6,allowing Less than Four Traversing in- Core Probe Machines to Be Operable ML20071H6851994-07-0808 July 1994 Proposed Tech Specs Re Improved Std Insertion Instructions, Consistent w/NUREG-1433 ML20069J3101994-06-0707 June 1994 Proposed Tech Specs Allowing Planned Testing at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt ML20059E9231994-01-0606 January 1994 Revised Proposed TS Pages for Increase in Allowable MSIV Leakage Rate & Deletion of MSIV Leakage Control Sys ML20059L2051993-11-0909 November 1993 Proposed Tech Specs Changing Unit 1,Section 4.9 & Unit 2, Section 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20058P8881993-10-19019 October 1993 Proposed Tech Specs Re Time Delay for RPS Electric Power Monitoring Sys Trips ML20046B6061993-07-30030 July 1993 Proposed Tech Specs for Implementation of New 10CFR20 Requirements 1999-07-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212J2721999-10-0101 October 1999 Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20205H1761999-04-0606 April 1999 Proposed Tech Specs Allowing Plant Hatch to Increase Storage Capacity of Each Units SFP ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141C0991997-05-30030 May 1997 Proposed Tech Specs Revising Requirements for Power Sources to Valves Associated W/Low Pressure Coolant Injection (LPCI) Mode of RHR Sys.Pages E3-1, 3.5-3,3.8-5,3.8-27 (Unit 1), 3.5-4,3.8-5,3.8-27 (Unit 2) Not Revd W/Incoming Submittal ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 1999-07-29
[Table view] |
Text
.
NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR. PLANT UNIT 1 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as f'ollows:
Remove Page Insert Page 3.10-5 3.10-5 3.10-7 3.10-7 3.10-9 3.10-9 3.10-10 3.10-10 5.0-1 5.0-1 2i04 087 7 907170 Cd 7
LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.10.F.3 Monorail Hoist (Continued) a.
The trolley and hoist shall be demonstrated to be operable by a trial lift of the spent fuel pool gate or an equivalent weight.
b.
A visual inspection shall be made to insure the structural integrity of the 5-ton mono-rail hoist.
3.10.G Spent Fuel Cask Lif ting 4.10.G Spent Fuel Cask Lif ting Trunnions and Yoke Trunnions and Yoke See note for Specification See note for Specification 3.10.F.1 above.
4.10.F.1 above.
3.10.H Time Limitation Irra'diated fuel shall not be handled in or above the reactor prior to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reactor shutdown.
3.10.I Crane Travel-Spent Fuel 4.10.I Crane Travel-Spent Fuel Storage Pool Storage Pool Loads in excess of 1600 Loads, other than fuel assemblies pounds shall be prohibited or control rods, shall be verified from travel over fuel to be 51600 pounds prior to move-assemblies in the spent ment over fuel assemblies in the fuel storage racks.
fuel storage pool racks.
2i34 083 3.10-5
3.10. A. 2.
Fuel Grapple Hoist Load Setting Interlocks Fuel handling is normally conducted with the fuel grapple hoist. The total load on this hoist when the interlock is required consists of the weight of the fuel grapple and the fuel assembly. This total is approximately 1500 lbs.
in comparison to the load setting of 485 30 lbs.
3 '.
Auxiliary Hoists Load Setting Interlock Provisions have also been made to allow fuel handling with either of the three auxiliary hoists and still maintain the refueling interlocks.
The 485130 lb.
load setting of these hoists is adequate to trip the interlock when a fuel bundle is being handled.
B.
_ Fuel Loading To minimize the possibility of loading fuel into a cell containing no control rod, it is required that all control rods are fully inserted when fuel is being loaded into the reactor core. This requirement assures that during refueling the refueling interlocks, as designed, will prevent inadvertent cri ticali ty.
C.
Core Monitoring During Core Alterations The SRM's are provided to monitor the core during periods of Unit shutdown and to guide the operator during refueling operations and Unit startup.
Requiring two operable SRM's in or adjacent to any core quadrant where fuel or control rods are being moved assures adequate monitoring of that quadrant during such al terations.
The requirements of 3 counts per second provides assurance that neutron flux is being monitored.
During sprial unloading, it is not necessary to maintain 3 cps because core alterations will involve only reactivity removal and will not result in criticality.
The loading of diagonally adjacent bundles around the SRM's before attaining the 3 cps is permissible lecause these bundles were in a subcritical configuration when they were removed and therefore they will remain subcritical when placed back in their previous positions.
D.
Spent Fuel Pool Water Level The design of the spent fuel storage pool provides a storage location for 3181 fuel assemblies in the reactor building which ensures adequate shielding, l
cooling, and reactivity control of irradiated fuel. An analysis has been performed which shows that a water level at or in excess of eight and one-half feet over the top of the active fuel will provide shielding such that the maximum calculated radiological doses do not exceed the limits of 10CFR20.
The normal water level provides 14-1/2 feet of additional water shielding.
All penetrations of the fuel pool have been installed at such a height that their presence does not provide a possible drainage route that could lower the water level to less than 10 feet above the top of the active fuel.
Lines extending below this level are equipped with two check valves in series to prevent inadvertent pool drainage.
E.
Control Rod Drive Maintenance During certain periods, it is desirable to perform maintenance on two control rod drives at the same time.
3.10-7 2i04 089
BASES FOR LIMITING CONDITIONS FOR OPERATION 3.10.H Time Limi+.ation The radiological consequences of a fuel handling accident are based upon the accident occurring at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> af ter reactor shutdown.
3.10.I Crane Travel-Spent Fuel Storage Pool A maximum weight of 1600 pounds shall be permitted to be transported over stored spent fuel in order to minimize the consequences of a load handling accident.
3.10.J References 1.
FSAR Section 7.6, Refueling Interlocks 2.
FSAR Section 7.5, Neutron Monitoring System 3.
Morgan, W.
R., "In-Core Neutron Monitoring System for General Electric Boiling Wat:- Reactors," General Electric Company, Atomic Power Equipment Department, November 1968, revised April 1969 (APED-5706) 4.
FSAR Section 10.3, Spent Fuel Storage 5.
FSAR Section 3.6.5.2, Reactivity Control 2}34 09 3.10-9
BASES FOR SURVEILLANCE P.EQUIREMENTS 4.10.
REFUELING A.
Refueling Interlocks Complete functional testing of all refueling interlocks before any refueling outage will provide positive indication that the interlocks operate in the situations for which they were designed. By loading each hoist with a weight equal to the fuel assembly, positioning the refueling platform, and withdrawing control rods, the interlocks can be subjected to valid operational tc ~ ts.
Where redundancy is provided in the logic circuitry, tests can bc performed to assure that each re-dundant logic element can independently perform its functions.
C.
Core Monitoring During Core Alterations Requiring the SRM's to be functionally tested prior to any core alteration assures that the SRM,'s will be operable at the start of that alteration.
The daily response check of the SRM's ensures their continued operability.
D.
Spent Fuel Pool Water Level A daily record of the Spent Fuel Pool Water Level to determine that the minim 0m of 8.5 feet is not exceeded is considered sufficient to ensure that radiological shielding is maintained.
E.
Control Rod Drive Maintenance Refueling interlocks and core monitoring surveillance arc discussed in 4.10.A and 4.10.C above. The choice of the strongest (highest reactivity worth) rod which will be used for a determination of the relevant shutdown margins is based on prior core calculations supplemented by empirical data obtained from similar cores.
From similar data e-d calculations the reactivity worth of rods adjacent to a withdrawn rod aill also be known.
Thus the surveillance shutdown margins can be evaluated in terms of rod posi tion.
F.
Reactor Building Cranes Modifications to the main reactor building crane are being studied in order to increase its ability to withstand a single failure. A spent fuel cask will not be lif ted until these modifications have been accepted by the AEC and the AEC has approved the lifting of casks by the crane and the appropriate Technical Specifications.
G.
Spent Fuel Cask Lif ting Trunnions and Yoke See note for Bases 4.10.F above.
I.
Crane Travel-Spent Fuel Storage Pool
- t. \\ ) 4 y j Refer to Bases 3.10.1.
q.
u 3.10-10
5.0 MAJOR DESIGN FEATURES A.
Site Edwin I. Hatch Nuclear Plant Unit No.1 is located on a site of about 2244 acres, which is owned by Georgia Power Company, on the south side of the Altamaha River in Appling County near Ba~xley, Georgia. The Universal
. Transverse Mercator Coordinates of the center of the reactor building are:
Zone 17R LF 372,935.2m E and 3,533,765.2m N.
B.
Reactor Core 1.
Fuel Assemblies The core shall consist of not more than 560 fuel assemblies of the licensed combination of 7x7 bundles wnich contain 49 fuel rods and 8x8 fuel bundles which contain 62 or 63 fuel rods each.
2.
Control Rods The reactor shall contain 137 cruciform-shaped control rods. The control material shall be boron carbide powder (B C) compacted to approximately 4
70% of its theoretical density.
C.
Reactor Vessel The reactor vessel is described in Table 4.2-2 of the FSAR. The applicable design specifications shall be as listed in Table 4.2-1 of the FSAR.
D.
Contai nment 1.
Primary Containment The principal design parameters and characteristics of the primary con-tainment shall be as given in Table 5.2-1 of the FSAR.
2.
Secondary Containment The secondary containment shall be as described in Section 5.3.3.1 of the FSAR and the applicable codes shall be as given in Section 12.4.4 of the FSAR.
3.
Primary Containment Penetrations Penetrations to the primary containment and piping passing through such penetrations shall be designed in accordance with standards set forth in Section 5.2.3.4 of the FSAR.
E.
Fuel Storage 1.
Spent Fuel All arrangements of fuel in the spent fuel storage racks shall be main-not greater than 0.95.
tained in a subcritical configuration having a keff 2.
New Fuel dry shall not be The new fuel storage vault shall be such that the keff flooded shall not be greater than 0.95.
greater than 0.90 and the keff 9104 092-
/-
5.0-1
NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License NPF-5) would be incorporated as follows:
Remove Page Insert Page 5-4 5-4
?.'iO4 093
DESIGN FEATURES ORAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 185 feet.
CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 2845 fuel assemblies.
l 5.7 COMP 0NENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components identified in Table 5.7.1-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7.1-1.
2 'i 0 4 09 'l HATCH - UNIT 2 5-4