ML19259C199

From kanterella
Jump to navigation Jump to search
LER 79-017/03L-0 on 790515:during Overspeed testing,12 Diesel Generator Auxiliary Blowers Failed,Rendering Diesel Inoperative.Caused by Interference Between Lobes of Blower. Blower Returned to Vendor for Rebuilding
ML19259C199
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 06/12/1979
From: Carroll J, Romney K
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19259C198 List:
References
LER-79-017-03L-01, LER-79-17-3L-1, NUDOCS 7906140352
Download: ML19259C199 (2)


Text

., - o ,~ ,.. ....._.,_..m_...,

u.m LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l 6

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l1@l@l o 1 l 7 8 l9 M lLICENSEE D l CCODE { C l N l 1 l@15l010 14 l- NUMdER LICENSE 1010101010 l- 1010 25 26 l@l4 LICENSE TYPEl1 JO 11 5711 CAT- 58 CON'T o

7 1

8 Eu'"cE 60 l L l@l0 l 5101010 61 DOCKET NUMBER l3 l1 17 68 l@l0 69 l5 l1 15 [719 l@l01611 EVENT DATE 74 75 1217 l980l@

REPORT DATE EVENT DESCRIPTION AND PROB ABLE CONSECUENCES h f oTTI Louring oerformance of oversoeed testina 12 diesel cenerator auxiliary blower o a 1 failed at 0930 rendering the diesel inocerative. Diesel cenerators 11 and 21 o 4 Iwere tested and assioned to Unit 2 which was coerating at 100% oower. Unit 1 l o s lwas in mode 6 with no core alterations or reactivity changes in progress. At I o e 12330 on 5/15/79 11 diesel cenerator was reassioned to Unit 1 to facilitate fuel I o 7 l movement. UDon ComDletion of Core alteration 11 diesel Cenerator was again assioned l o a I to Unit 2 at 0821 on 5/17/79.12 diesel generator was returned to service at 1430 (CONT)l 7 8 9 80 C DE C E SLBC E CCMPCNENT CODE SuBCC O E SU OCE ol9 l E l E l@ W@ lB l@ l Bl Ll 0l WI El Rl@ l Z l@ [Z_j @

7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCuRAENCE REPORT REVISION LEReRO EVENT YEAR R EPCRT NO. CODE TYPE NO.

@ ,agRT l 7l 9l l-l 10 l1 17 l l/l l 013 l lLl l-l l 0l

_ 21 22 23 24 26 27 23 29 30 31 32 TA N A ON C PLANT VETH MouRS 22 S 8 i FC 8. SLPP LI E R MAN FAC RER 33 C [gl34Zl@ l Z lg 35 l36 Zl@37 l 0l 0l Ol l 40 lYl@

41 l42 Yl@ l43 Al@ lF l0 l1 l0 Ig 44 47 CAUSE CESCRIPTION AND CORRECTIVE ACTICNS h iio lThe blower failure was caused by an interference develocing between the lobes of I i i i the blower. The bearings were insoected and no deterioration was noted. The I i 2 I blower has been returned to the vendor for rebuilding. If the exact cause of i

,,3 l failure is detennined during rebuilding, it will be submitted as an uodate l

, A [ report. i

'^ 2E S s .CVWE R OTHER STATUS 015 RY DISCOVERY CESCRIPTION i s Hl@ l0l0l0[@l NA l l B l@l Test l

' JTIVITY COTTENT RELE ASED OF RELEASE AMOLNT OF ACTIVITY LOCATION OF RELEASE 1 6 l Z l @' l Zlgl NA l l NA l PERSONNEL EXPCS ES

~uvuR Tv.E oESCm,T,0~@

1 7 l0l0l0[@lZl@l 2 i3 NA 80 l

,ERSONNEL m;u'a,,,

.. A 2284 12'3 7

i a 8 3 l0l0l0[@loeSCm 1tO~@ NA 11 12 80 l

TV E DESCR PT ON NA 7

2 9 8 9 lZ[@l 10 go l

PUB LIC!TY qqgggggggy I S E DE SCRIPTICN

,,S06140'5 B i  ; i lri;;Iii;i;j 8 9

  • 7 10 , 68 69 30 g NAME OF PREPARER d. I. Carroll /X. M. Romnev psoys (301) 234-7943/7960 2

DOCKET NO. 50-317 EVENT DATE 05/15/79 REPORT DATE 06/12/79 LER N0'. 79-17/3L ATTACHMENT EVENT DESCRIPTION AND PROBABLE CONSEOUENCES: (CONT) on 5/23/79. This is not a repetitive occurrence.

2284 124

.