ML19256G424
| ML19256G424 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 12/06/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Goodwin C PORTLAND GENERAL ELECTRIC CO. |
| References | |
| NUDOCS 7912310272 | |
| Download: ML19256G424 (4) | |
Text
7/C
[va ato,
v o
UNITED STATES E 3*j "s,(f
$.-[fi7 U )' 7.
NUCLEAR REGULATORY COMMISSION
- #e$
REGION V 8
o, i 1990 N CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA o
WALNUT CREE K, CAf IFORNIA 94596 December 6, 1979
^
Docket flo. 50-344 Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention: Mr. Charles Goodwin, Jr.
Assistant Vice President Gentlemen:
The enclosed Information flotice provides information with regard to reporting of defects and noncompliance, in accordance with Part 21 of Title 10, Chapter 1, Code of Federal Regulations.
This Information flotice is provided as notification of a significant matter.
Although no specific action or response is requested, it is expected that recipients will review the information for possible applicability.
If you have questions regarding the matter, please contact me.
Sincerely,
,COh %
R. H. EngeP<en Director
Enclosures:
1.
IE Information flotice flo. 79-30 2.
List of Recently Issued IE Information flotices cc w/ enclosures:
14tA 111 C.
D. Yundt, PGE IUU7 I II F. C. Gaidos, PGE 791231b E
SSIt:S: 6870 Accession No: 7910250502 UNITED STATES NUCLEAR REGULATORY COMMISSION
- n ng c-b 9 i)f 0FFICE OF INSPECTION AND ENFORCEMEflT WASHIfiGTON, D.C.
20555 December 6, 1979 IE Infomation Notice No. 79-30 REPORTIt!G OF DEFECTS AND fl0NCOMPLIANCES, 10 CFR PART 21
Background
Section 21.1, Title 10, Code of Federal Regulations, Chapter 1, Part 21, states, "The regulations in this part establish procedures and reauirements for implementation of Section 206 of the Energy Reorganization Act of 1974.
That Section requires any individual director or responsible officer of a firm constructing, ownino, operating or supplying the components of any facility or activity which is licensed or otherwise regulated pursuant to the Atomic Enerqy Act of 1954, as amended, or the Energy Reorganization Act of 1974, who obtains information reasonably indicating:
(a) that the facility, activity or basic component supplied to such facility or activity fails to comply with the Atomic Energy Act of 1954, as amended, or any applicable rule, regulaton, order, or license of the Commission relatina to substantial safety hazards or (b) that the facility, activity, or basic component supplied to such facility or activity contains defects which could create a substantial safety hazard, to immediately notify the Commission of such failure to comply or such defect, unless he has actual knowledge that the Commission has been adequately informed of such defect or failure to comply."
Discussion Recent inspections performed by ?!RC Office of Inspection and Enforcement personnel reveal a general misunderstanding of 10 CFR Part 21 requirements in cases where a licensee or nonlicensee has selected to rely on other reportina requirements such as 50.55(e) and Regulatory Guide 1.16 as the means to adequately infcrm the Commission of a matter reportable under Part 21. In this area inspection findinas have consistently shown that many activities covered by Part 21 have not been appropriately considered in procedures and other instructions currently being implemented. Specifically, the provisions of 21.21(a)(1), 21.21(a)(2), 21.21(b)(3) and 21.51 are not being adequately addressed.
Compliance with each element of the rule is necessary to assure proper handlina of matters subject to consideration and reportina under Part 21. Your attention is directed to Section 21.51 which requires that each individual or organization subject to 10 CFR Part 21 prepare records sufficient to assure compliance with the requirements of that part.
1664 112
IE Information flotice flo. 79-30 December C, 1979 Page 2 of 2 All holders of flRC licenses or permits issued pursuant to 10 CFR Part 50, architect-enaineers, contractors and suppliers subject to Part 21 requirements should ensure that management control systems are established to assure that all requirements of 10 CFR Part 21 are met, with particular emphasis on the specific areas discussed above.
1664 113
IE Information Notice No. 79-30 Enclosure December 6, 1979 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 79-29 Loss of MonSafety-Related 11/16/79 All power reactor facilities Reactor Coolant System holdino Ols or cps Instrumentation During Goeration 79-28 Overloadin9 of Structural 11/16/79 All power reactor facilities Elements Due to Pipe Support with an OL or CP Loads 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs and cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips At Turkey 10/1/79 All power facilities with Point Units 3 And 4 an OL or a CP 79-24 Overpressurization Of 10/1/79 All power reactor facilities Containment Of A PWR Plant with a CP After A Main Steam Line Break 79-23 Emergency Diesel Generator 9/26/79 All power reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Qualification of Control 9/14/79 All power reactor Systems facilities with operating licenses and construction permits.
79-21 Transportation and Commercial 9/7/79 All power and research Burial of Radioactive Paterial reactors with OLs i664 114