Forwards IE Insp Repts 50-324/79-27 & 50-325/79-28 on 790806-09 & Notices of Violation & Deviation
ML19256E051
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/04/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19256E046 List:
References
NUDOCS 7910250570
Download: ML19256E051 (3)


See also: IR 05000324/1979027

Text

4

.

'o,,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

o

$

.E

REGION 11

o

101 MARIETTA sT., N.W.. SulTE 310o

ATLANTA. GEORGIA So3o3

o

.....

In Reply Refer To:

SEP o 41979

RII: WAR

50-324/79-27

50-325/79-28

Carolina Power and Light Company

Attn:

J. A. Jones, Senior Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh, North Carolina 27602

Gentlemen:

This refers to the inspection conducted by W. Ruhlman of this office on

August 6-9, 1979 of activities authorized by NRC License Nos. DPR-62

and DPR-71 for the Brunswick Nuclear Plant facility, Unit Nos. I and 2,

and Company offices in Raleigh, North Carolina, and to the discussion of

our findings held with A. C. To11ison, Brunswick Plant Manager and H. R.

Banks, Manager-Nuclear Generation at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined acti' s you have taken with regard to previously identified

enforcement matters

items. The status of these items is discussed

in the enclosed repo-

.

One new unresolved item reaulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

\\2\\C Chi

S70

f

7910250

.

Carolina Power and Light Company

-2-

SEP 0 4 1979

,

Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

During the inspection it was found that certain activities under your

license appear to deviate from commitments to the Commission and have

safety significance. This item is identified in the Notice of Deviation

enclosed herewith as Appendix B.

Please provide us in writing within 20

days of your receipt of this letter your comments including a description

of corrective actions that have been or will be taken, corrective actions

which will be taken to avoid further deviations, and the date corrective

actions were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be propcietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Foom.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

NC.

R. C.

e is, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-324/79-27

and 50-325/79-28

cc w/ enclosures: (See Page 3)

)}i0

.

Carolinc Power and Light Company

-3-

SE? c '

-

,

cc w/ enclosures:

A. C. Tollison, Jr.

Plant Manager

Box 458