Text
"
6Y p 22 MENRANDUM FOR:
W. J. Dircks, Acting Executive Director for Operations FROM:
R. B. Hinogue, Director, Office of Standards Development
SUBJECT:
ADDITIONAL SD INPUT CONCERNING THI ACTION PLAN In his memorandum of March 12, 1980, the Executive Director for Operations asked for office director cocm:ents and concurrence with Draft 3 of the TMI Action Plan. 3pecific SD connents oa Draft 3 of the Action Plan were pro-vided by memorandum dated March 27, 1980. By me:::orandum dated April 16, 1980, the T'il Action Plan Steering Group provided responses to a number of the SD coen:ents and requested SD concurrence with the Plan based on those responses and the fact that the Steering Group had incorporated all other SD connents.
The Office of Standards Development concurs in Draft 3 of the TMI Action Sian based on the understanding that SD coments forwarded in our memorandum of March 27, 1980 will be incorporated into Draft 4 of the Action plan as described in R. J. Mattson's memo of April 16, 1980, except as described below.
In a telecon with E. C. Wenzinger (SD) on April 18, 1980, R. J. Mattson (NRR) agreed that MRR will provide sufficient resources to review and con-cur in the simulator (Task I.A.4.2) and control room regulatory guides (Task I.D.4) issued for coment and sufficient resources to review and concur in the effective version of Regulatory Guide 1.97 (Accident Monitoring Instrumentation-Task II.F.3).
Attached are (1) a revised write-up for action plan item II.J.4 " Revise Deficiency Reporting Requirements".which has been agreed to by this office (Campbell) and IE (Reinmuth) and should be included in the final version of the plan, and (2) a write-up for a new iten II.F.5 concerning classification of electrical equipment as requested by the Steering Group (R. Scroggins).
NRR (Satterfield) has concurred with the NRR resource estimates in the new Item II.F.S.
In the SD comments provided i a memorandtm dated March 18, 1980, I specifically coseented that SD and not NRR should be the lead office of
/
item II.A.l. " Siting Policy Rulemaking". Exception to this consent has LD not been taken in the enclos to' R. J. Mattson's memorandum of April 16, imv 8'005280 h k j OFFICE >
SUANAME>
DATE >
i NRC Form 318 A i4-791 NRCM 02040
- c.. w... -....
~
W. J. Dircks g sa h 1980 (thus indicatiing the coment was accepted); however, I understand that this change has not been incorporated into Draft 4 of the Action Plan. This discrepancy should be resolved. An alternative which I believe to be preferable would be to revise the title of item II.A.1 to " Reformulation of Siting Policy" for which NRR would be the lead office and to include as part of task II.A.1 a subtask on siting criteria rulemaking with SD designated as having lead responsibility. In a telecon with S. D. Richardson (SD) on April 22,1980 R. J. Mattson agreed with making this change.
Origizal, eigaed by a0B!!iNr LIIncats Robert B. Minogue, Director Office of Standards Development Enclosures : As stated bcc:
R. Minogue R. Smi th G. Arlotto K. Goiler W. Morrison I. C. Roberts E. F. Conti E. Wenzinger W. Anderson J. Norberg fl. Parsont S. Richardson 1
DISTRIBUTION CENTRAL FILE SD ALPHA SD READ t
RSSB SUBJ 9 2F l
RSSB RD RSSB WR Task No: ef) j I
f., ' -
l SD.DIR' SD: DSS SD:SHSS C. Roberts K.Goller R. Minogue 4/ /80 4/ /80 4/{,*/ 80 4-22-80 EH SD SD:RSSB
(
SD:DD
,n **RSSB uRRE k5 E -- 3
- E ******* M E *****"
- SEE~ PREVIOUS c6ac
__,ghp _ _
i G. Arlotto E. Conti S. Richardson E. Wenzinger W. norrison w.
c.
/8o 4/ /so 4/ -/8c o m - m../.Eo......:..4/
/.80 4/ /80_. is!....
NRC Foem 3138 '4 79) P.RCM O240
s
\\
MEORAN I M FOR:
U.'J. Dircks, Acting Executive Director for Operations FRCM:
R. G. Smith, Deputy Director Office of Standards Development St'3 JECT:
ADDITIONAtsSD INPUT CONCERNING TMI ACTION PLNI In his recorandun of March 12, 930, the Executive Director for Operations asked for offica directer comments and'roncurrence with Draft 3 of the TMI Action Plan.
Snecific SD ccmr,ents on Draft 3 ofs the Action Dlan were provided by remrandum dated March 27, 1930. By mem rardsn dated April 16, 1930, the TMI Action Plan Steering Group provided responses to a number of the SD corcents and requested SD concurrence with the Plan based on thuac responses and the fact that the Steering Group had incorporsted all ot. er SD coments.
The Office of Standards Developcent con s in Draft 3 of the TMI Action Plan based on the understanding that SD connen forsarded in our merorandun of Ptarch 27, 1983 will be incorporated into D ft 4 of the Action Plan as described in R. J. Mattson's me:norof April 16, 1980, cept as described below.
In a telecon with E. C. Wenzinger (SD) on Apr1 18, 1980, R. J. Mattson (NRR) agreed that MRR will provide sufficient resourc s to review and concur in drafts of the s f rulator (Task I. A.4.2) and control roo,, regulatory guides (Task I.D. A) and sufficient resources to review and concur in he effective version of Regulatory Guide 1.97 (Accident Monitoring Instrum ntation-Task II.F.3).
Attached are (1) a revised write-up for action plan tem II.J.4 " Revise Deficiency Reporting Requirements" which has been agreed to by t. is office (Camobell) and IE (Reinmuth) and should be included in the final vers n of the plan, and (2) a i
write-up for a new item II.F.5 concerning classificatio of electrical equipment as requested by the Steering Group (R. Scroggins). SMRR[ atterfield)has. concurred with the NRR resource estimates in the new Item II.F.5.
In the SD consents provided in a memorandum dated March 18,.080, I specifically cormented that SD and not NRR should be the lead office of it II.A.1, " Siting Policy Rulenaking". Exception to this corrent has not been tak n in the erclo-sure torr. J. Mattson's memorandum of April 16,1980 (thus indicating the coment h
i l
l' CFF:CE >
I S V R N A M E h j................... -- * * * = = * * * * = = = = * *
- l OATE>l.....................................,
...................+..................p...............
N R C 8 C A M 319 ' 6-7 N
@ J. 5. GOV E R W E NT *RiNTING OF F'CE 1977-2 7-025
'!. J. Dircks was acce ted); however, I understand that this chance has not been incorporated into Draft 4 of the Action Plan. This discrepancy shculd be resolved.
R. G. Smith, Ceputy Director Office of Standards Development Enclosures-As stated bcc:
R. B. Minogue R. G. Smith G. A. Arlotto K
R. Goller W. M. Morrison I. C. Roberts E. F. Conti E. C. Wenzinger W. F. Anderson J. A. Norberg M. A. Parsont S. D. Richardson Distribution:
Central File SD ALPHA SD RD RSSB SUBJ.:
RSSB RD RSSB WR f
I Task NO.:
l t
1
\\
i S DS SD:SHSS C
erts KRGoller 4rlh80 4/ /80 ct 4/21/S0-SD:RSSB SD:
SD:GES SD:/ E.SdA SD:EPSB SD C8 FICE >
7 g
.s,o,n,,,E C
,,,, b,
,,,,q,,,,d
- Zgg,
,, E n M,,,,
SamNaut >........
f D C E D..........l i
..... '. ~ ~......
f.............'............................
N AC 5 38V Jia i4 77i
( U.'S. DOV E R'.V E '. ' 8 4. N T : N G 0 8 F ' C E '3 7 7-23 7-D25
Task II.J.4 Draft 3 - 3/5/80 TASK II.J.4 REVISE DEFICIENCY REPORTING REQUIRE!4ENTS A.
OBJECTIVE:
To clarify construction and non-licensee reporting requirements to obtain uniform reporting and earlier identification and correction of problems.
B.
NRC ACTIONS r
1.
Revise construction and non-licensee deficiency reporting requirements.J a.
==
Description:==
NRC will improve the event-reporting requirements
~
(10 CFR Part 50.55(e) for holders of construction pcrmits 6nd Part 21 for X
Qnon-licensee)toassuretfiatallreportableitemsarereportedpromptlyand d
that information submitted is complete.
Improvements will be implemented by rule changes as appropriate and coordinated with those made under Task I.E.6.
The reports received as a result of these actions will provide increased information on component failures that affect safe'ty so that more prompt and effective corrective action can be taken.
The information will also be used as input to an augmented role of the NRC's vendor and construction inspection programs.
~
b.
Schedule:
IE will draft proposed changes to Part 50.55(e) by April e$
fa rk
.T * = CS' t 1980.
SD will process and issue amended rule by April 1981.
Based on IE's X
A A
inspection and enforcement experience, IE will propose changes to Part 21 and/or Section 206 of the Reorganization Act of 1974 by August 1980.
SD will II.J.4-1
TASK II.F.5 CLASSIFICATION 0F INSTRUMENTATION, CONTROL AND ELECTRICAL EQUIPMENT A.
OBJECTIVE:
Improve requirements and guidance for classifying nuclear power plant instrumentation, control and electrical equipment important '.o safety.
B.
NRC ACTIONS 1.
Equipment classification standard a.
Descriptio1: SD and NRR, in concert with IEEE, will prepare a standard which will provide a uniform classification approach for determining the applicability of design criteria and design requirements for nuclear power plant systems, based on the level of their importance to safety.
The standard will set forth criteria for determining the level of importance to safety of the instrumatation, control and electrical portions of nuclear power plant systems. Methods will be provided to determine the design basis for each of these systems and for determining the degree of applicability of the requirements of other standards to each of these systems, with such deter-mination to be based on the level of importance to safety of each system.
b.
Schedule:
(1) A joint NRC/IEEE working group will be constituted by the end of April,1980 and the first working group meeting is planned for mid-May,1980.
(2) Drafts of a standard will be wiitten, commented upon and rewritten during May, 1980 through September 1980, with a third draft expected to be available for IEEE management committee review by the end of September, 1980.
(3) Assuming IEEE allows use of a draft IEEE standard as the basis for a NRC Regulatory Guide, the standard would be published for public comment along with the Regulatory Guide (see item 2. which follows) early in 1981.
c.
Resources: SD FY80
.3 my, FY81
.5 my NRR FY80
.2 my 2.
Equipment classification Regulatory Guide a.
Cescription: SD will prepare a Regulatory Guide which will endorse, as appropriate, the IEEE standard development as des-cribed in foregoing item 1.
This effort may be used to judge
. the potential improvements that may be realized by similar efforts in the mechanical systems and structures areas.
b.
Schedule: A draft Regulatory Guide will be issued in early 1981 with a final version published as soon as resolution of public comments allows.
c.
Resources: SD FY80
.1 my, FY81
.5 my NRR FY81
.1 my, Y
m o
s#