Proposed Amend to Tech Specs App a of License DPR-57 to Change Present Head Requirements of RHR Svc Water Sys
ML19253A977
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/09/1979
From:
GEORGIA POWER CO.
To:
Shared Package
ML19253A976 List:
References
NUDOCS 7909140237
Download: ML19253A977 (2)


Text

.

ATTACHMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS The proposed c'.anges to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.5-5 395-5 l

b t

~=e-S S43071.

79091407 3 7

a ..

LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.5.B.3 Shutdcwn Requirements If Specification 3.5.B.l .a or 3.5.B.2 cannot be met, the reactor shall be placed in the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.5.C. RHR Service Water System 4.5.C. RHR Service Water System

1. Normal System Availability 1. Normal System Availability The RHR service water system RHR service water system testing shall be operable: shall be performed as follows:
a. Prior to reactor startup Item Frequency from a Cold Condition, or Pump Capacity After pump
b. When irradiated fuel is in Test: maintenance the reactor vessel and the Each RHR service and once/3 reactor vessel pressure is water pumo shall months greater than atmospheric deliver at least pressure except as stated in 4000 gpm at a Specification 3.5.C.2. system head of at least 847 feet,
c. When irradiated fuel is in the reactor vessel and the reactor is depressurized at least one RHR service water loop shall be operable.
2. One Pump Inocerable If one RHR service water pump is inoperable the reactor may remain in operation for a period not to exceed thirty (30) days provided all other active components of both subsystems are operable.

34307e3 3.5-5