- pn necg'o
6
UNITED STATES
~
8
NUCLEAR REGULATORY COMMISSION
n
$
- E
REGION 11
o
101 MARIETTA ST., N.W., SUITE 3100
e
ATLANTA, GEORGIA 30303
In Reply Refer To:
SEP 101979
RII:CMH
50-269/79-20
50-270/79-18
50-287/79-20
Duke Power Company
Attn:
W. O. Parker, Jr.
Vice President, Steam Production
Post Office Box 2178
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by C. M. Hosey of this office on
August 6-10, 1979 of activities authorized by NRC Licenses DPR-38,
DPR-47 and DPR-55 for the Oconee facility, and to the discussion of our
findings held with J. E. Smith at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously
identified inspection findings.
These are discussed in the enclosed inspection
report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are lioted in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply inclui.ing:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
1204
062
7910240296
_ _
SEP 101979
.
.
Duke Power Company
-2-
4
the enclosed inspection report will be placed in the NRC's Public Document
Room.
lf this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
applirt
7 within 20 days to this office to withhold such information
from pu W e disclosure. Any such application mast include a full statement
of the reasons on the basis of which it is claimed that the information
is propriet:ri, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincere.ly,
- YZ
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/79-20,
50-270/79-18 and 50-287/79-20
cc w/ enclosures:
J. E. Smith, Station Manager
Post Office Box 1175
' Seneca, South Carolina 29678
..
1204
063