05000317/LER-1979-046-03, /03L-0:on 790827,charging Pumps of Auxiliary High Pressure Safety Injection Headers 12 & 13 Placed Out of Svc to Repair Cracked Weld on Sample Line Pipe Reducer.Crack Caused by Lack of Weld Fusion.Reducer Removed & Replaced

From kanterella
(Redirected from ML19249E439)
Jump to navigation Jump to search
/03L-0:on 790827,charging Pumps of Auxiliary High Pressure Safety Injection Headers 12 & 13 Placed Out of Svc to Repair Cracked Weld on Sample Line Pipe Reducer.Crack Caused by Lack of Weld Fusion.Reducer Removed & Replaced
ML19249E439
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/26/1979
From: Davis S, Miernicki M
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19249E438 List:
References
LER-79-046-03L, LER-79-46-3L, NUDOCS 7910010405
Download: ML19249E439 (1)


LER-1979-046, /03L-0:on 790827,charging Pumps of Auxiliary High Pressure Safety Injection Headers 12 & 13 Placed Out of Svc to Repair Cracked Weld on Sample Line Pipe Reducer.Crack Caused by Lack of Weld Fusion.Reducer Removed & Replaced
Event date:
Report date:
3171979046R03 - NRC Website

text