05000317/LER-1979-040-03, /03L-0:on 790909,500-kV Transmission Line Taken Out of Svc from 11:50 Am to 5:21 PM to Repair Drop Line Connecting 500-kV Transmission Line to Carrier Current Line Drop.Caused by High Winds.Cable Repaired

From kanterella
(Redirected from ML19249E394)
Jump to navigation Jump to search
/03L-0:on 790909,500-kV Transmission Line Taken Out of Svc from 11:50 Am to 5:21 PM to Repair Drop Line Connecting 500-kV Transmission Line to Carrier Current Line Drop.Caused by High Winds.Cable Repaired
ML19249E394
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 09/17/1979
From: Heibel R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19249E392 List:
References
LER-79-040-03L, LER-79-40-3L, NUDOCS 7910010304
Download: ML19249E394 (1)


LER-1979-040, /03L-0:on 790909,500-kV Transmission Line Taken Out of Svc from 11:50 Am to 5:21 PM to Repair Drop Line Connecting 500-kV Transmission Line to Carrier Current Line Drop.Caused by High Winds.Cable Repaired
Event date:
Report date:
3171979040R03 - NRC Website

text