05000348/LER-1979-032-03, /03L-0:on 790730,determined That Diesel Generators 1C & 2C Output Breakers Were Racked Out.Caused by Personnel Error.Breakers Racked in & Control Power Restored

From kanterella
(Redirected from ML19249B389)
Jump to navigation Jump to search
/03L-0:on 790730,determined That Diesel Generators 1C & 2C Output Breakers Were Racked Out.Caused by Personnel Error.Breakers Racked in & Control Power Restored
ML19249B389
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/28/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249B384 List:
References
LER-79-032-03L, LER-79-32-3L, NUDOCS 7909040360
Download: ML19249B389 (3)


LER-1979-032, /03L-0:on 790730,determined That Diesel Generators 1C & 2C Output Breakers Were Racked Out.Caused by Personnel Error.Breakers Racked in & Control Power Restored
Event date:
Report date:
3481979032R03 - NRC Website

text