ML19249B384

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-032/03L-0 & 79-033/03L-0
Date released: 09/20/2019 Download: ML19249B384


LER 79-033/03L-0:on 790803,radiation Monitor R25B Declared Inoperable.Caused by Drive Belt Failure.New Drive Belt Installed
ML19249B395
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/28/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249B395 (1)
LER 79-032/03L-0:on 790730,determined That Diesel Generators 1C & 2C Output Breakers Were Racked Out.Caused by Personnel Error.Breakers Racked in & Control Power Restored
ML19249B389
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/28/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249B389 (3)
Forwards LERs 79-032/03L-0 & 79-033/03L-0
ML19249B383
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/28/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249B383 (1)