ML19226A151
| ML19226A151 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/16/1979 |
| From: | Mchenry T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19224C296 | List: |
| References | |
| FOIA-79-98 TI 2595-2, TI-2595-2, NUDOCS 7907020103 | |
| Download: ML19226A151 (2) | |
Text
.r
~
3 :J Ti 2595/2 3-av e.. o a...g g
- ___% w 1sc & ---
OFFICE OF TNSPF.CTION AND ENFORCEMENT B&W SITE INSI'ECTOR DAli.Y REl' ORT 4l bl Date sm - < rrA: '. -R iv e r. 3 -.
Inspector (s)
T. McHenry_
General Plant Status:
74% cower with one reactor coolant cump secured to prevent seal degradation.
la.
Review of Similar Transients (Item 2 of IE3 79-05A):
~-
Licensee resconse to items c 'i 2 received in Reg 1on II ott1ce anc Torwaroec
. ~... nz.a :.:n.,...
No additional information, b.~
Review and Revision of Operating and Maintenance Procedures (Items 3, 4, 5, 7, 8 9, 10 of IES79-05A):
See item 1.a above.
~~
c.
Review and Implementation of Chang,es in Containment Isolation (Item 6 IEB 79-054A):
See item 1.a above.
i r
i a o[
- eAnunk, d.
Training of Plant Personnel (Items 1, 4, 11 and plant / procedures changes):
See item 1.a above.
fn 2b /' g00!
7 9 07 0?. 01 C' 7
TI 2595/2 Crystal River 3 - 4/16/79 Page 2 of 2 2.
SUMMARY
OF NRC INSPECTION ACTIVITY DURING PERIOD 4/15/79 (Address I ems 1.a thru 2.d above, give other independent /significant effort, identify shif ts on which activity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Performed inscection of sone control room operations during each shift.
a.
b.
Reviewed administrative controls to assure proper return to service following maintenance activities.
Controls appear to be adequate.
Re'ciewed the revised emergency procedure for loss of coolant / pressure, c.
Procedure appears adequate in regard to licensee's commitnents in response to IEB-79-05A.
3.
STATUS OF INSPECTOR DISCUSSIONS WITH PLAST PERSONNEL:
a.
All available shif t personnel have been briefed, b.
Verified shift personnel have reviewed revised emergency procedures.
4 DESCRIPTION OF CENERAL PLANT STATUS (i.e., operating power level, planned changes, scheduled outages, ESF out of servike, major maintenance, reportable occurrences, etc.)
\\
74" power with one reactor coolant pump out of service to prevent' seal degradation.
There is no major equipment out of service.
Refuel outage to begin 4/24/79.
P00RORlGiNR 267 068
-