OFTICE OF TNSFEC. ION M;D ENTORC ENT B&W SITF. TNSPECTOR DAILY REPORT Davis-nosse 1 nit 1 (50-346)
Date:
4/16//9 Insportor(s):
K.
R, Raker J. D. Smith General Plant Status:
Mode 5 - Cold Shutdo.en f ur Maintenance Oul.me 1.
Sun:tary of Licensee Resconse to IE Bulletin 79-05 and Supplcnents:
a.
Review of Similar Transients (Item 2 of IES 79-OSA):
Completed.
b.
Review and Revision of OperaHng.:nd Maintensuce Procedurce (Items 3, 4,
5, 7, 8,
Revisions in progreAs. Most changen hwe been draf ted and are aeal:Ing review process to start on 4/16/ 7').
Review and Implementation ci Changes in Containment Isolat-:na c.
(Ite:n 6 IES79-03A):
No change in utatus from 4/15/ 79 r port.
267 071 3
bL g go702 0 lII
s 2-4/16/79 Davis-Besse Unit 1 d.
Training of Plant Personnel (Items 1, a, 11 and plant / proc dtnes channes):
Iin change in status E rrrn 4/12/79 report.
2.
Summary of ??RC Inspection Activity During Pcriod 0300-1600 hra, 4/15/7')
Obscrved plant activitics on day shif t.
Keviewed surveillance proceduren completing item IIT C.4 or TI 2595/7.
Review of valve lineups continuing.
3.
Status of Inspector Di scussions with Plant Personnel:
Com p1 ete.d.
d VJ 4
Dencription of General Plant Status:
Heactor coolant sy stem partially drained for RCP seul replacment which is in progress. Licensee han decided not tc, modify AFW valve motor opera tors froct AC to DC due tu material problemu.
Sta rtup utill planner' for 4/22/79.
5.
General:
Report dated April 13, 1979 contains a typographical arrer in parate:ph 2.
The facsi::211e number in the NRC resident inspectors office is:
419-89S.0691 as opposed to 0619.