B&W Site Inspector Daily Rept on 790416.Plant Status:Reactor Operating at Full Power W/No Known Problems.Next Scheduled Outage on 790517
ML19226A155
Person / Time
Site: Rancho Seco
Issue date: 04/16/1979
From: Andrea Johnson, Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19224C296 List:
References
FOIA-79-98 TI 2595-2, TI-2595-2, NUDOCS 7907020123
Download: ML19226A155 (2)


Text

.

TI 2593/2 Attach.nent 1 Page 1 of.!

0FFICE OF INSPECTION AND FNFORCEH6HT 02.1 SITE INSPECTOR DAILY REPORT Date 4/16/79 Stie Rancho Seco Inspector (s)

A. Johnson L. Miller G3:arai Plant Scatus:

100% Power - No kncwn probicms.

1.

SD:!ARY Of-LICEHSEE RESPONSE TO IE CULLETING 79-05 AND SUPPLEMENTS:

Revicu of similar Transients (1 tem 2 of IES79-05A):

a.

Ccapleted (c specified in 4/12/79 report).

b.

Hoview and Rovision of Operating and Maintenance Procedures (lte~ms 3, 4, 5, 7, 8, 9,10 o f IEB 79-05A):

Same as stated in 4/15/79 report.

b V Yrar ia n D u b u s t u m w W La b p Review and Implementation of Changes in Containment Isolation c.

(Item 6 IEB 79-054A):

Completed (as specified in 4/10/79 report).

i d.

Training of Plant Personnel (Items 1, 4, 11 and plant / procedures, changes):

3mi f D [j

(

n i U!'O Same as stated in 4/12/79 report.

0 } Zh

~.

TI 2505/2 Attact.a. ant 1 Page 2 of 2

7..

SUTF.MlY OF NRC INSPECTIOli ACTIVIlY DURIhG PERIOD 4/16/79 (Address Items 1.a. thru 2.d. above, plus other iElepancent/significaIit e ffo rt, identify shifts on which activity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):

Inspection coverage from 6 AM thru 8 Ph.

Inspection coverage included cor, trol rocm surveillance and plant tours.

Completed review of TI 2595/2 items III.C.4 and I!I.C.5, except for interviews with personnel to resolve six possible discrepancies fcund it, facility procedures.

3.

SfATU5 0F IllSpECTOR DISCUSSI0XS WITH PLTNT PERSONNEL-Same as s12ecified in 4/12/79 report.

4.

DESCRIPTION OF GEMERAL PLANT STATUS (i.e., operating pouer leval, planned changes, schaduled outages, ESF out of service, major maintenance, reportabla occurences, etc.)

100% power. No known problems.

No significant maintenance or surveillance schedul ed. No planned changes in power level.

Next scheduled outage is May 17,1979.

No ESF systems out of service.

Suntoary of TI 2595/2 items congleted to date:

III.B - Complete except for three oper. tors at Lynchburg.

III.C.1, 2, 3, 6, and 8 - Complete.

III.C.4.a and 5 - Complete except as noted in Paragraph 2 above.

Complete.

III.D 267 077 P002 ]Eggt e