ML19224C295

From kanterella
Jump to navigation Jump to search
Forwards Summary of B&W Plant Insp for 790416 W/Ie Site Inspector Daily Repts of B&W Reactors for 790416
ML19224C295
Person / Time
Issue date: 04/20/1979
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Gilinsky V, Hendrie J, Kennedy R
NRC COMMISSION (OCM)
Shared Package
ML19224C296 List:
References
FOIA-79-98 NUDOCS 7907020097
Download: ML19224C295 (2)


Text

!

) / - - 3. ' E 22-.

,w

-y

.._ o.,...

.wn.

l'EMORANDUM FOR:

Chairman Hendrie Ccr:missioner Gilinsky Coraissioner Kennedy Comissioner Bradford Comissioner Ahearne -

^*

THRU:

Lee V. Gossick sm;*i e Executive Director for Operations i

U FR0ii:

John G. Davis, Acting Director

~

Office of Inspection and Enforcement

SUBJECT:

STATUS OF B&W PLANTS WITH OPEPATI*iG LICENSES Enclosed for your information is a sumary of the status of Babcock

~

and Uilcox plants for April 16, 1979.

John G. Davis Acting Director Office of Inspection and Enforcement

Enclosure:

Distribution:

It n les BOW Status Report -

4/16/79 B. Paulus, I-t J. G. Davis, I,t cc w/ enc 1:

p.Jhompson,IE

'"C'd*"E r

't*"'

IE

  • ~"

OGC L.

N. uncerwood, IE pc" L. V. Gossick, ED0 SECY V. Stello, NRR b

CONTACT:

D. Thompson 49-23191 790702009 7 1

Ro /s w% ~7 _7 P h d' !C T 9

[: a.

X0 I 005 Y A/DdIF ED:

s

~

RC uluf DThc=pson

, J GQa[ ls..

. 2. i e..

. f 7a

' L f,t

_LVGossi_ck

..m, y 4/$O9 S/.. /79

$//$/.79..

4/., /79' E

ome p.

.A.

/

l

SUMMARY

OF B&W PLANT INSPECTIONS 4/16/79 Region I:

TMI-l - Shutdown Region II:

Crystal River -

Operating at 74% power with one RCS pump shut down to prevent seal degradation.

Inspections continuing on control room operations, review of' administrative controls to assure proper return to service following maintenance activities, and revpjk of emergency procedure for loss of coolant / pressure.

All available shift personnel have been briefed by NRC.

Oconee -

Units 1 and 3 operating at 100% power; Unit 2 operating at 99% power.

Inspections continuing on control room oper: tions, plant tour in vital areas including high pressure injection (HPI),

Icw pressure injection (LPI), and feedt 'ter systems, confirmation that Engineered Safety Fe ;ure (ESF) system valve lineups are in proper order.

Region III:

Davis-Besse -

Shutdown for maintenance.

Startup scheduled for April 22, 1979.

Inspections continuing of plant activities.

Review of valve lineups continuing.

Region IV:

Arkansas Nuclear One, Unit 1 -

Shutdown for refueling.

Plant heatup scheduled for April 30; reactor startup on May 5; power ascension on May 8, 1979.

NRC briefings o'f plant personnel are complete.

Inspection continuing on review of Engineered Safety Features systems.

fegion V:

26/

066 Rancho Seco -

Operating at 100% power.

Next scheduled outage is May 17, 1979.

Inspections continuing on control room operc ; ions and plant tours.

.