ML19210B557
| ML19210B557 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/17/1972 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | John Miller METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19210B558 | List: |
| References | |
| NUDOCS 7911110002 | |
| Download: ML19210B557 (2) | |
Text
-
y.'
,) 't :
c m
7 In e
, s OCT 17 r,q Metropolitan Edison Cecpany Docket Nos. 50-289 Attention: Mr. J. C. Miller 50-320 Vice President F. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:
This refers to the inspection conducted by Mr. Folsom and Mr. Barker of this office on Septecher 25-27, 1972 of construction activities authorized by AEC Construction Permit Nos. CPPR-40 and CPPR-66 and to the discussions of otr findings held by Mr. Folsom with Messrs.
Avers and Stewart of your staff at the co clusion of the inspection.
Areas a - ined during th9 inspection included the Unit No. 1 verifica-tion of electrical cable routing, the Unit No. 1 ring girder repair vork, the Unit No. I reactor coolant system fire danage, and the pro-gress in resolving previously identified unresolved items. Within these areas, the inspection consisted of selective ocimination of p
procedures and representative records, interviews with plant per-V sonnel and observations by our inspectors.
During this inspection, it was found that certain activities appeared to be in violation of Section 50.55(e), Part 50. Title 10, Code of Federal Regulations. The iten and references to the pertinent require-ments are listed in the enclosure to this letter. This notice is sent to you pursuant to the provisions of Section 2.201 of the AEC's Rules of Practice, Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you to submit to this office within thirty (30) days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which vill be taken by you to avoid further violations; and (3) the date when full com-pliance vill be achieved.
Should you have any questions concerning this inspection, we vill be pleased to discuss then with you.
Sincerely, 1566 196 James P. O'Reilly Director Ecclosure:
CRESS:I De_ c-1ptien of Violation Folscs/ebr Hovard O'Reilly
/
g; 10/11/72
,Y 7 914_1_10-O O h
p j..
I m
bcct RO Chief Reactor Testing & Operations Branch (1)
RO Chief Reactor Construction Branch (1)
ED:EQ (4)
I irector of Licensing (4)
DR Central Files (1)
PDR Local PDR NSIC DTIE State of Pennsylvania t
i a
1 I,
1566 197 i
O t
g
% ~
.. _.