05000317/LER-1979-051-03, /03L-0:on 790926,hydraulic Snubber Was Removed from Operation to Repair Anchors Attaching Snubber to Wall. Anchors Were Replaced & Hanger Restored to Operation

From kanterella
(Redirected from ML19209C805)
Jump to navigation Jump to search
/03L-0:on 790926,hydraulic Snubber Was Removed from Operation to Repair Anchors Attaching Snubber to Wall. Anchors Were Replaced & Hanger Restored to Operation
ML19209C805
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/11/1979
From: Heibel R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209C802 List:
References
LER-79-051-03L, LER-79-51-3L, NUDOCS 7910180322
Download: ML19209C805 (1)


LER-1979-051, /03L-0:on 790926,hydraulic Snubber Was Removed from Operation to Repair Anchors Attaching Snubber to Wall. Anchors Were Replaced & Hanger Restored to Operation
Event date:
Report date:
3171979051R03 - NRC Website

text

(77

' LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

Olt M lD lC lC lN 11 l@l010 l-10 l01010 l0 l-l010 l@l 4l ll ll ll 11@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T 5$7"dlll@l0l510l0l0 3 l1 l7 }@l0 l9121617 l9 l@l 11 Ol ll 117 91 @

o i

7 8

60 61 COCKET NUMB ER 68 69 EV ENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSECUENCES h ) was removed from A hydraulic snubber (1-15-8 Table 3.7-4 0

2 I attached support plate. The snubber support plate was repaired and the snubber i

O 3

placed back in operation on 9/28/79. This is not a repetitive occurrence.

I O

A O s I T.S. 3.7.8.1.

I ej l l

O O

7 l

l C18 l

Sje$$'O'e SEPOE

  • I'E Code'

$08C$$E COvPONENT COCE

^"

^'

CO lC lJ [@ J@ l C[@

SlU Pl0lRlTl@

B [ @ l Zl @

O 9

7 8

9 10 11 12 13 18 19 20 S EQUENTI AL OCCUAAENCE AEPORT A EVISION ggg EVENT YEAR R EPORT NO.

COC8 TYPE NO.

O asgRO l7 91 l-l l0lSil l/l 1013 l l Ll l-l [g_]

yu

,,,,, 21 22 23 24 26 27 28 29 30 31 32 K N A

ON O PLANT MET HOURS S8 l FC B.

SL #LI MANUPACTLRER lA lgl34Z l@

l Z l@

l Z l@

010l0l01 l N l@

[Nl@

lAl@

1811l310l@

33 35 36 37 40 41 42 43 44 47 CAU35 DESCRIPTION AND CORRECTIVE ACTIONS h i

O l Anchors attachino snubber to wall were found deficient durinn tastie i a. 'J

,_j II&E Bulletin 79-02.

Deficient anchors were reelaced =na tha han-pr raonroa I

i i

lto full coeration with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

2 1

3 I

I i

A 7

8 9 80 STA S

% POWER OTHERSTATUS CISCO RY DISCOVERY DESCRIPTION 1 Is lE l@ l1 l 0 l 0 l@l NA l

lBl@l Concrete Anchor Test Procran l

  • *!TiviTY CO0 TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 1

6 lZ @ lZl l

f,'A l

l NA l

7 3 9 to it 44 45 SO

  • ERSONNEL EXPOSURES NUYSER TYPE DESCRIPTICN 4 l0l0l0l@lZl@l NA l

[i

,ERSCNNE L mu' RIES OESCRiPTicN@ NA NuvaER l

0l0l0l@l i

4 7

8 9 11 12 80 LCSS OF CR CAVAGE TO FACILITY 1170

'O7 Tv'E C E SCRIPTION lZ l@l NA i iIU l/C l

i 9

7 4 )

Iv 80

,SdSuE @SElCRi,T,0N@

7 91013 0 Sag NRc uSE ONtY l

ya I

llIIIllllilili a

68 69 80 ;

7 8

)

to NAME OF PREPARER PHONE-

~