05000317/LER-1979-049-03, /03L-0:on 790924,loop Isolation Valve SI-617 Failed to Operate When Motor Operator Received Open Signal. Caused by Contact Misalignment of Movable Contactor. Contactor Realigned & Tested

From kanterella
(Redirected from ML19209C679)
Jump to navigation Jump to search
/03L-0:on 790924,loop Isolation Valve SI-617 Failed to Operate When Motor Operator Received Open Signal. Caused by Contact Misalignment of Movable Contactor. Contactor Realigned & Tested
ML19209C679
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/12/1979
From: Bauer E, Lagiewski J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19209C674 List:
References
LER-79-049-03L, LER-79-49-3L, NUDOCS 7910170209
Download: ML19209C679 (1)


LER-1979-049, /03L-0:on 790924,loop Isolation Valve SI-617 Failed to Operate When Motor Operator Received Open Signal. Caused by Contact Misalignment of Movable Contactor. Contactor Realigned & Tested
Event date:
Report date:
3171979049R03 - NRC Website

text

(7 77)

LICENSEE EVENT REPORT

=

CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

lM lD lC lC lN l1 l@lO lO l-lO lO lO lO lO l -l Ol O @l 4l 1l ll 1l 1l@l l

I@

o 1

7 8 9 LICENSEE C30E 14 15 LICENSE NVM8ER 25 26 LICENSE TYPE JO 57 CAT Sa CON'T

"'bRCE IL h O l S lO lO lO I 3l 1l 7 @l Oi 912 l 4l 7l 9 hl1 l Ol1l 2l 7I 9h 0

1 O

7 8

60 61 DOCKET NUMB ER 68 69 EVENT DATg 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h lDuring the perforTnance of surveillance testing at 0340, auxiliary hich oressure 1

O 2

l loop isolation valve (SI-617) failed to Cperate when its motor coerator received l

0 3

lan Cpen signal. No other injection paths were incperable at the time. Tne valve 1

o 4

o is Iwas retumed to service at 0410 on 9/24/79. LER 76-48 (U-1) describes a similar l

O e toccurrence.

I O

7 l

l l

o a i 80 7

8 9 SYSTEM

CAUSE

CAUSE COMP.

VALVE C'

COOE SUSCODE COMPONENT CODE SLBCOOE SUSCOOE o

9 lS

@ l Al@ lC K lT lB lR lK l@ l Bl@ ]@

7 8

9 10 11

,12 13 18 19 20 SEQU E NTI AL OCCURRENCE REPORT REVISION LE R tRO EVENT YEAR REPORT NO.

CODE TYPE NO,

@ aeg 17lo I-l inl419 I/l O is I LI l-l W

,,,, 21 22 23 24 26 27 28 29 30 31 32 TK N A ON O P NT ME HOURS S8 i POR B.

SUP* LIE MANUFACTURER lE l@lZl@

lZi@

lZl@

l O 10 OlOl lN @

lY @

l A !@

I10IOl5l@

33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION eiND CORRECTIVE ACTIONS h i

o lInvestication shcwed that the valve motor was Mnf = +=e47 4n + = m a-ad e m Idue to a slicht contact misalicment of the movable contactor. Tne contact was 1

i i

Irealigned and tested. The state of electrical contacts is ceriodically surveyed I

i 2

i 3

junder the preventive maintenance program.

i 4

l l

80 7

8 9 ST

% POWER OTHER STATUS DISCO ' RY OISCOVERY OESCRIPTION NA l

lBl@l Surveillance Test l

l El@ l 1 l O l O l@l i

5 ACTIVITY CO TENT aftEASEO OPRELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE h

l ER l

IM l

i 6

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE D ESCRIPTION Im l

10 l010 ]@lZ l@l i

7

,EaSO%E L iN;u2ES 11A0 n9 10 l O 10 l@sESCRiPriON@

1MU UL Nov8ea l

In i

a 90 7

8 9 11 12 LOSS OF CR OAMACE TO FACILITY TY'E D E SC RIPTION l Z lhl IM 1

9 SO 7

8 9 10 7 910170 cM NRC USE ONLY

,SSuEiSloESCaiPTiO~

LZ_

NA l

llllll1lllll{

2 o

68 69 80 5 7

8 9 10 J. S. Laciewski/E. R. Bauer PHONEn(3Ol) 23407942/7917 2,

NAME OF PREPARER