| Site: | Crystal River |
| Issue date: | 07/05/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19209B896 | List: |
| References | |
| NUDOCS 7910110132 | |
| Download: ML19209B905 (2) | |
See also: IR 05000302/1979023
Text
.
,
'o
UNITED STATES
!"),
I
NUCLEAR REGULATORY COMMISSION
g
REGION 11
" ' -r
-
kg * bi[/
.
101 MARIETTA sT., N.W., SUITE 3100
ATLANTA, G EoRGI A 3o3o3
.....
.
In Reply Refer To:
g* g
RII: WAR
50-302/79-23
Florida Power Corporation
ATTN:
W. P. Stewart, Manager
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by W. A. Ruhl: tan of this office on
June 14-15, 1979, of activities authorized by NRC Operating License No. DPR-72
for the Crystal River Nuclear Plant facility, and to the discussion of our
findings held with G. Beatty at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or explanation
in reply including:
(1) corrective steps which have been taken by you and the
results achieved; (2) corrective steps which will be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report ?ntains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
/ 8 e1.
7910110
1 ' ' 0 3h8
.
.
Florida Power Corporation
-2-
M
h1979
-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
fx (
/w
'
~
-
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/79-23
cc w/ enc 1:
G. P. Beatty, Jr.
Plant Superintendent
P. O. Box 1228
Crystal River, FL 32629