Forwards IE Insp Rept 50-302/79-23 on 790614-15 & Notice of Violation
ML19209B905
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/05/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19209B896 List:
References
NUDOCS 7910110132
Download: ML19209B905 (2)


See also: IR 05000302/1979023

Text

.

,

'o

UNITED STATES

!"),

I

NUCLEAR REGULATORY COMMISSION

g

REGION 11

" ' -r

-

kg * bi[/

.

101 MARIETTA sT., N.W., SUITE 3100

ATLANTA, G EoRGI A 3o3o3

.....

.

In Reply Refer To:

g* g

RII: WAR

50-302/79-23

Florida Power Corporation

ATTN:

W. P. Stewart, Manager

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by W. A. Ruhl: tan of this office on

June 14-15, 1979, of activities authorized by NRC Operating License No. DPR-72

for the Crystal River Nuclear Plant facility, and to the discussion of our

findings held with G. Beatty at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you and the

results achieved; (2) corrective steps which will be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report ?ntains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

/ 8 e1.

7910110

1 ' ' 0 3h8

.

.

Florida Power Corporation

-2-

M

h1979

-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

fx (

/w

'

~

-

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/79-23

cc w/ enc 1:

G. P. Beatty, Jr.

Plant Superintendent

P. O. Box 1228

Crystal River, FL 32629