e
.fu
!. l' ' l p c _,..
g
'E, g( (
.c -
- tt*.
ll 5 s
e,( '; v, *-
m: [3 s.
30 July 1979 3-0-3-a-2 P.oo..er w
CS-79-218 co Docket No. 50-302 Mr. J. P. O'Reilly, Director License No. DPR-72 Office of Inspection & Enforcement Ref:
RII: WAR U.S. Nuclear Regulatory Commission 50-302/79-23 101 Marietta St., suite 3100 Atlanta, GA 30303
Dear Mr. O'Reilly:
Items of Noncompliance We offer the following responses to the apparent in the referenced inspection report.
NOTICE OF VIOLATION As required by 10 CFR 50.54'i-1), the licensee shall not make a change A.
to the accepted requalification training program by which the scope, frequency, or time allotted to conducting parts of the program is reduced without prior approval of the Commission.
Contrary to the above, the licensee reduced the requirements of on-participation for backup licensed operators from five (5) days shift (2) days every three months.
In addition, every four (4) months to two (8) backup licensed operators failed to meet either the fifteen eight (15) days per year or the eight (8) days per year requirement during the period from January 1, 1978 through April 1, 1979.
for on-shift AI-800 will be revised to revert to the requirement
Response
participation of backup licensed operators for five (5) days every four
/.s required by 10 CFR (4) months as initially required by t.he program.
future changes will not be made without prior approval of 50.54(1-1),
the Com=ission.
The Al-800 revision will be completed by 30 September 1979 and all eight (8) backup licensees will meet the requirements by 30 November 1979.
l' C
336 7910110 / O 7 190496 OFAOIAL COPY
e L
J. P. O'Reilly edlE Ref: RI :.: MAR /79-23 Page 2 s shall be conducted where per-As required by 10 CFR 55, Appendix A, lectu formance on annual examinations indicates that additional emphasis is needed.
B.
only those licensees who The accepted requalification program stipulates that score greater than f)% on each section of the annual examination may be ex-section.
empted from participation in the lecture (s) given on that Contrary to the above, one licensed reactor operator and one licensed senior reactor operator scored less than 80% on a section of the 1978 annual examina-tion administered in January of 1978 and they failed to attend a lecture section during the period before the 1979 annual examination.
covering that Personnel who scored less than 80% on any section of the annual examina-tions will be scheduled for makeup lectures to be completed by 30 September 1979.
Response
As required by Technical Specification 6.8.1, procedures shall be written and C.
implemented.
implemented in that Contrary to the above, Procedure AI-800, Item 6.1, was not (8) licensed backup required semi-annual evaluations were not prepared for eight operators for one or both semi-annual periods in 1978.
Semi-annual evaluations will be prepared for all licensed personnel.This
Response
AI-800 will be revised to be in agreement with Appendix 12C of the FSAR.
Semi-annual evaluations for change will be completed by 30 September 19,79.
the backup licensed operators will be completed by 30 November 1979.
As required by 10 CFR 19.12, all individuals working in or frequenting any portion D.
of a restricted area shall be instructed to report promptly to the licensee any condition which may cause or lead to a violation of Commission regulations.
in-Contrary to the above, the lesson plan for instructions to workers did not clude such instruction material and one of six workers interviewed on June 14, 1979 stated that he was unaware of this requirement.
AI-800 will be revised to include 10 CFR 19.12 instructions in the Genera In addition, a review of 10 CFR Respense:
Employee Training Program by 30 September 1979.19.12 will be includ site.
granted unescorted access to the plant Should there be further questions, please contact us.
Very truly yours, FLORIDA POWER CORPORATI
?
c~( )d
~
W. P. Stewart Nuclear Plant Manager Manager, Nuclear Operations JC/rc 0
337