ML19208D436
ML19208D436 | |
Person / Time | |
---|---|
Site: | Nine Mile Point, Brunswick ![]() |
Issue date: | 09/25/1979 |
From: | Banks H CAROLINA POWER & LIGHT CO. |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML19208D437 | List: |
References | |
GD-79-2392, NUDOCS 7909280426 | |
Download: ML19208D436 (1) | |
Similar Documents at Nine Mile Point, Brunswick | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7971999-10-20020 October 1999
[Table view]Submits Results of Review of 990521 & 0709 Ltrs Which Provided Core Shroud Insp Results & Tie Rod Stabilizer Assemblies BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) ML20217G1291999-10-15015 October 1999 Forwards Errata to Safety Evaluation for Amend 168 Issued to FOL DPR-63 on 990921.Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML20212K8601999-10-0606 October 1999 Responds to Concern in 990405 Petition Re Residual Heat Removal Alternate Shutdown Cooling Modes of Operation at Nine Mile Point Nuclear Station,Unit 2 ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20212J4651999-09-30030 September 1999 Informs of Completion of mid-cyle PPR of Nine Mile Point Nuclear Station on 990916.Determined That Problems in Areas of Human Performance & Work Control Required Continued Mgt Attention.Historical Listing of Plant Issues Encl ML20212J8831999-09-30030 September 1999 Informs That Util 980810 & 990630 Responses to GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at NPPs Acceptable. NRC Considers Subj GL to Be Closed for Plant ML20212K8641999-09-30030 September 1999 Informs That During 990927 Telcon Between J Williams & J Bobka,Arrangements Were Made for Administration of Exams at Plant During Wk of Feb 14,2000.Preliminary RO & SRO License Applications Should Be Submitted 30 Days Prior Exam ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212B2821999-09-14014 September 1999 Responds to 990712 Correspondence Which Responded to NRC Ltr Re High Failure Rate for Generic Fundamentals Exam of 990407 for Nine Mile Point.Considers Corrective Actions Taken to Be Acceptable ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211K5031999-08-30030 August 1999 Responds to Ltr Addressed to Chairman Dicus, Expressing Concerns Involving 990624 Automatic Reactor Shutdown.Insp Findings & Conclusions Will Be Documented in Insp Repts 50-220/99-06 & 50-410/99-06 by mid-Sept 1999 ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl ML20211G4921999-08-26026 August 1999 Advises That Info Re Comments Addressing 10CFR2.206,dtd 990405 Will Be Withheld from Public Disclosure,In Response to ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211P5161999-08-26026 August 1999 Discusses Submitted on Behalf of Niagara Mohawk Power Corp Written Comments Addressing 10CFR2.206 Petition & Request That Ltr & Attached Response Be Withheld from Public Disclosure.Request Denied BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999
[Table view]Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions 1999-09-08 Category:UTILITY TO NRC MONTHYEARML20064A8161990-09-14014 September 1990
[Table view]Forwards Info Re Performance of NDE Exam of Feedwater Nozzles & Safe Ends During 1989/1990 Maint/Refueling Outage, Per NUREG-0619,Section 4.4.3.1(2) ML20059L0911990-09-12012 September 1990 Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees ML20059G2881990-09-0606 September 1990 Forwards Proprietary NEDC-31624P,Rev 2,Class III, Brunswick Steam Electric Plant Units 1 & 2 SAFER/GESTR-LOCA LOCA Loss of Coolant Accident Analysis, for NRC Approval.Rept Withheld ML17056A9771990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revs 4 & 5 to Odcm. ML17348B4941990-08-30030 August 1990 Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML18038A3231990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept Jan- June 1990 & Revs 6-8 to Odcm. Radioactive Effluent Release Rept Includes Summary of Liquid,Gaseous & Solid Effluents & Justification for Revs to ODCM ML18038A3221990-08-24024 August 1990 Forwards NRC Form 474, Simulation Facility Certification & Supporting Documentation BSEP-90-0579, Informs That Util Plans to Replace Pilot Valve Assemblies on Listed Safety Relief Valves Prior to Startup1990-08-24024 August 1990 Informs That Util Plans to Replace Pilot Valve Assemblies on Listed Safety Relief Valves Prior to Startup ML18038A3201990-08-21021 August 1990 Discusses Status of Completion of Generic Safety Issue 75, Item 2.2.2 Re Vendor Interface for safety-related Components ML18038A3251990-08-20020 August 1990 Forwards Rev 3 to Nine Mile Point Requalification Program Action Plan, Certifying That All short-term Corrective Actions Completed BSEP-90-0565, Responds to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06.Corrective Actions:Personnel Counseled on Closure of Locked High Radiation Area Doors & Preventive Maint Program Established for Reactor & Turbine Bldg Gates1990-08-16016 August 1990 Responds to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06.Corrective Actions:Personnel Counseled on Closure of Locked High Radiation Area Doors & Preventive Maint Program Established for Reactor & Turbine Bldg Gates BSEP-90-0564, Forwards Response to Violations Noted in Insp Repts 50-324/90-19 & 50-325/90-19.Corrective Actions:Procedures to Shutdown Reactor Feed Pump Using Manual Control Approved on 900627 & Real Time Training Provided to Operators1990-08-16016 August 1990 Forwards Response to Violations Noted in Insp Repts 50-324/90-19 & 50-325/90-19.Corrective Actions:Procedures to Shutdown Reactor Feed Pump Using Manual Control Approved on 900627 & Real Time Training Provided to Operators ML20058Q1151990-08-15015 August 1990 Forwards Response to Regulatory Effectiveness Review on 900604-08.Response Withheld (Ref 10CFR73.21) ML20058N1671990-08-0909 August 1990 Forwards Updated Tech Spec Pages Re 900314 Application for Amends to Licenses DPR-71 & DPR-62.Amends Permit Removal of Rod Sequence Control Sys & Reduces Rod Worth Minimizer Cutoff Setpoint to 10%-rated Thermal Power ML20056A6931990-08-0707 August 1990 Advises of Plans to Complete Remaining Portions of Licensed Operator Requalification Exams During Oct-Dec 1990 BSEP-90-0535, Forwards Monthly Status Rept on Plant Integrated Action Plan.New Target Completion Date for D27 Will Be 9008151990-08-0707 August 1990 Forwards Monthly Status Rept on Plant Integrated Action Plan.New Target Completion Date for D27 Will Be 900815 BSEP-90-0545, Forwards Monthly Operating Rept for Jul 1990 for Brunswick Steam Electric Plant Units 1 & 2 & Corrected Operating Data Rept for June 1990,Unit 21990-08-0303 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Brunswick Steam Electric Plant Units 1 & 2 & Corrected Operating Data Rept for June 1990,Unit 2 ML20063Q0501990-08-0303 August 1990 Forwards Corrections to Plant Updated Fsar,Amend 8,per ML20056A0291990-07-30030 July 1990 Forwards Response to NRC 900206 Request for Addl Info Re Util 870817 License Amend Request,Extending Expiration Dates for OLs ML20056A0611990-07-27027 July 1990 Advises That Util Plans to Perform Next Integrated Leak Rate Test During Next Reload 8 Outage,Currently Scheduled for Sept 1991 ML20056A1801990-07-25025 July 1990 Forwards Info Re NPDES Permit Noncompliance Reported to Permit Agency for Month of Mar 1990,per 830426 Agreement BSEP-90-0524, Informs of Change to Info in NRC Insp Repts 50-324/90-01 & 50-325/90-01 Paragraph 3.b of Details1990-07-24024 July 1990 Informs of Change to Info in NRC Insp Repts 50-324/90-01 & 50-325/90-01 Paragraph 3.b of Details ML20055G6771990-07-20020 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-324/90-14 & 50-325/90-14.Corrective Actions:Event Included in Third Quarter Real Time Training for Personnel, Emphasizing Importance of Detection of Plant Deficiencies ML20055G5261990-07-18018 July 1990 Forwards Decommissioning Rept Indicating Reasonable Assurance That Funds Available to Decommission Facility. Financial Assurance of Cotenants Also Encl ML20055F9431990-07-12012 July 1990 Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices BSEP-90-0459, Suppls Response to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06 Re Locked High Radiation Area Boundary.Three Options to Eliminate Design Problems W/Locked High Radiation Boundaries Will Be Submitted by 9008171990-06-29029 June 1990 Suppls Response to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06 Re Locked High Radiation Area Boundary.Three Options to Eliminate Design Problems W/Locked High Radiation Boundaries Will Be Submitted by 900817 ML20058K3551990-06-28028 June 1990 Responds to NRC Confirmation of Actions Ltr Re Licensed Operator Training Program Review.Curriculum Development Unit of Nuclear Training Section Will Develop Self Assessment Criteria to Increase Effectiveness of Training Program ML20055D2751990-06-28028 June 1990 Informs That Senior Operator License SOP-20687 for Rj Zuffa No Longer Needed & Should Be Terminated Upon Receipt of Ltr ML17058A5841990-06-27027 June 1990 Forwards Rev 8 to Updated FSAR for Nine Mile Point Unit 1. Changes Re Findings Noted in Insp Rept 50-220/88-201 Included in Rev.Rev Does Not Reflect Changes Re Reg Guide 1.97,Rev 2 ML20055D7881990-06-27027 June 1990 Forwards Updated Tech Spec Pages to 890329 Application for Amends to Licenses DPR-71 & DPR-62 to Permit Expanded Operating Domain for Facility ML18038A3051990-06-26026 June 1990 Responds to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issue Requirements.Tabulated Info Re Generic Safety Issue Title,Applicability,Status & Remarks Encl ML20055C8201990-06-18018 June 1990 Forwards Rev 0 to Rept of 1989/90 Inservice Insp for Brunswick Steam Electric Plant Unit 2, Per ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA 6220(b) ML20055H5501990-06-14014 June 1990 Discusses Confirmation of Concurrence Re Qualification of Fifth Operating Shift.Util Determined That Crew C Will Be Prepared for NRC Testing by 900723 & 24 to Provide Fifth Crew ML20043G4711990-06-13013 June 1990 Forwards Tech Specs to Support 900228 License Amend Request Re Fuel Cycle 8 Reload ML20043G4701990-06-13013 June 1990 Withdraws 900419 Request for License Amend Re one-time Extension of Diesel Generator Surveillance Interval.Util Investigating Methods of Dealing W/Situation & Will Keep NRR Project Manager Informed of Plans ML20043G4671990-06-13013 June 1990 Forwards Proposed Tech Specs Re Turbine Control Valves & Fire Detectors,To Support 900315 License Amend Request ML20043F1921990-06-0606 June 1990 Advises of Intentions to Delay Submittal of Permanent Change to Tech Spec 3/4.8.1,pending Resolution of Lessons Learned from Incident at Plant ML20043F0431990-06-0606 June 1990 Advises That Correct Date for Remedial Exercise Is 900622, Per Insp Repts 50-324/90-13 & 50-325/90-13.Procedures Will Be Revised by 900706 to Ensure Adequate Accountability for All Personnel within Protected Area ML20043C9021990-06-0101 June 1990 Responds to Violations Noted in Insp Repts 50-324/90-14 & 50-325/90-14.Corrective Actions:Box Cover Closed Following Notification of Discrepancy & Human Performance Evaluation Initiated to Ensure Proper Corrective Actions Initiated ML20043D1851990-05-30030 May 1990 Forwards Response to NRC 900206 Request for Addl Info Re Util 870817 Proposed Change to Expiration Dates of Ols. Responses to Remaining Questions Will Be Submitted by 900629 ML20043B7821990-05-25025 May 1990 Responds to Violations Noted in Insp Repts 50-324/88-36 & 50-325/88-36.Allowable Working Loads for 1/2-inch Hilti Anchor Bolts Currently Used at Facilities Adequate Per NRC Info Notice 86-094.No Further Action Planned ML20043A3941990-05-16016 May 1990 Forwards Tech Spec Re 900419 Amend Request for One Time Extension of Diesel Generator Surveillance Requirements ML20043G4991990-05-14014 May 1990 Forwards Corrected Graph for 900531 Integrated Action Plan Status Rept Illustrating Level 1 Items Projected as of 900331 ML20042G5411990-05-0909 May 1990 Forwards Response to Request for Addl Info Re 891010 License Amend Request to Raise Allowable Containment Leak Rate from 0.5 to 1.0 Vol Percent Per Day.Core Thermal Power Level to Be Used in Calculation Is 2,550 Mwt ML20042F6111990-05-0202 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' Plant Procedures Provide Adequate Guidance for Operation of Overfill Protection Sys ML20042E7281990-04-27027 April 1990 Provides Tech Spec Interpretation Evaluation of Offsite/ Onsite Electrical Distribution Sys,Per NRC Request During 900123 Telcon.Submittal of Amend Request Will Be Made by 900531 ML20042E8531990-04-27027 April 1990 Discusses Relocation of Primary/Secondary Containment Isolation Valve Listings to Plant Procedures.Relocation Will Help Avoid Future Expenditure of NRC Resources for Review & Processing of License Amend Requests ML20042E3741990-04-11011 April 1990 Lists Info Re Unit Containment Vent & Purge Valves,Per NRC 900315 Request ML20012F4871990-04-0606 April 1990 Forwards Response to Regulatory Effectiveness Review.Encl Withheld (Ref 10CFR73.21) ML20012F4701990-04-0404 April 1990 Forwards Addl Info to Support Util Finding of NSHC for 900228 Application for Amend to License DPR-71,revising MCPR Safety Limit Specified in Tech Spec 2.1.2 from 1.04 to 1.07 for Unit 1,Cycle 8 Operation 1990-09-06 |
Text
,
k Carolina Power & Light Company September 25, 1979 FILE: NG-3516 (B) SERIAL: CD-79-2392
.o Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKE'" NO. 50-324 LICENSE NO. DPR-62 LICENSEE EVENT REPORT 2-79-079
Dear Mr. O'Reilly:
In accordance with Section 6.9.1.9.b of the Technical Specifications for brunswick Steam Electric Plant, Unit 2, the attached Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in accordance with the format set forth in NUREG-0161, July,1977.
Yours very truly, f$ $Y/5 !
H. R. Banks Manager Nuclear Generation SBT:jmb*
Attachment ec: Mr. R. A. Hartfield Mr. V. Stello