Text

.

/

'

UNITED STATES

  1. o

~! h , . ,

%

NUCLEAR REGULATORY COMMISSION

$.

E

REGION 11

'

"

8

101 MARIETT A sT., N.W., sulTE 3100

o,

'I

ATLANTA, GEORGIA 3o303

%<

j

....+

In Reply Refer To:

JUL17 1m

RII:FJ

50-269/79-14

50-270/79-14

50-287/79-15

Duke Power Company

ATTN:

V. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlomen:

This refers to the inspection conducted by F. Jape of this office on May 1-31,

1979, of activities authorized by NRC License Nos. DPR-38, DPR-47, and DPR-55

for the Oconee Nuclear Station facility, and to the discussior. of our findings

held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective exari ations of procedures and representative records, interviews with

n

personnel, and observations by the inspector.

We have examined actions you have taken with regard to r previously identified

enforcement matter. This is discussed in the enclosed im,cction report.

During this inspection it was found that certain activities under your license

appear to be in noncoc:pliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rulas of Prac ice," Part 2, Title 10, code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved. With regar3 to Item A, corrective

actions to prevent recurrence were completed prior to conclusion of this inspection;

therefore, a reply is n:, requested for this item.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information fror public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

-

1052 037

29o928o214

.-

-

-

--

~..

.

-

JUL 171979

.

Duke Power Company

-2-

'

Should you have any quest <one cance.. ng this letter, we will be glad to discuss

them with you.

Sincerely,

.

)$? d -

sko

Richard

ewis, Acti..g Chief

.

Reactor Operations and Nuclear

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/79-14

50-270/79-14, and 50-287/79-15

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

.

1052 038

-