Text
.
O9 O
l a s v e s.$ 9 O '
- U 1
.>. s s s e.
MOUNO L ADORA)
Ocor*'ed for the U. S. Atome (n..gy c MONSANTO RE:;t AftCH CORPORATION P. O. S o m 3 2 Miamtsberg. Ohio 45342 Phone: (513) 868-7444 February 8, 1972 $E{EfV g
to Mr.,D. D. Davis, Manager Dayton Area Office 10FEB Ig72 U. S. Atomic Energy Commission Post Office Box 66 Miamisburg, Ohio 45342
Dear Mr. Davis :
239 Pu/Be Neutron Sources Attached are s amnry sheets showing the re of the 239 Pu/Be Neutron Source Surveillance Prograsults of Phase fa cts which were not anticipated when the work sch d l planne,d, have emerged and require special co m.
Several for action.
e u e was
~
mment and recommendations Results 1.
data indicates 19.3 Kg ofResponse to our reques 239 cation and (18.2 Kg no reply and 1.1 Kgcannot be lPu not yet accounted f ocated).
2.
Radiographic films (2 for each source tak the outer liners lack integrityshow 40% of the and 5% of Recommendations Re 1 above - Additional help from the resp onsible AEr.
for missing and unheard from sourcesage Re 2 (a)
Specifications should be established for encapsulation to guarantee safety in use
- h
-(1-
,v t.
7908170 7 E 7 e sub sidiary o? Monsanto Company
/
Mr. D. D. Davis February 8, 1972 (b)
All of the sources (DNET program) should be j
. recalled on a rotating schedule and tested to ensure conformity with such standards.
(c)
Users and/or fabricators of commercially produced sources of this type should be advised of the foregoing decisions and
~
planned action.
If you agree with these recommendations, we are ready to assist wherever we can.
Specifically regarding encapsulation, we propose that DOI hypothetical accident conditions for special form radio-active material and National Fire Protection Association (NFPA) guidelines for building fires be used as design criteria.
Upon your approval, a review of current designs will be undertaken against these criteria, and test specifications established accordingly.
This could be done within the time schedule and funding originally established for this activity.
Guidance regarding the future?of the Neutron Source Surveillance Program is requested by February 25 for inclusion in the.FY-1974 Budget Submission.
Additional funding would be required for FY-1973 to cover the recall, check, _ correction (if required), and return of the field sources.
'Very truly yours, YG bT
~
W. T. Cave, Director Nuclear Operations WIC:km Enclosures
~
cc:
D. D. Davis (2) bc:
H. K. Nason
R. K. Fliteraft R. E. Vallde R. D. Madding m
P. J. Marn n;3 {}
q; File o-
SUmiARY j
NEUIRON SOURCE SURVEILLh.CE P'ROGRAM ON MRC MOUND F/sBRICATED SOURCES Janua ry ' 28, 1972
~
PHASE I d
A.
Non-Destructive Tests:
Number of Test Sources
~~
Radiography
/
53 Leak Check 24 Visua l 13 Dimensiona1 13
. Dose Rate 32 Neutron Emission 25 For the purposes of Phase V, " Evaluate data and make recommendations," Phase I-A is essentially complete.
B.
Destructive Tests:
1)
Facilities essentially complete 2)
Test apparatus is undergoing checkout 3)
Destructive tests to begin when manpower is available PHASE II A.
Letters were sent to all customers on original log.
s B.
Customer response:
1)
Approximately 507. responded to questionnaire providing the data shown below.
Located No Resnonse Yet Neca tive Response No. of Kg.
No. of Kg.
No. of I'.g.
Sources Pu-239 Sources Pu-239 Sources Pu-239 734 29.5 476 18.2 15 1.1 k
g 1/1
SUBDIARY OF NEUTRON SOURCES NON-DESTRUCTIVE TESTING AT -MOUND January 28, 1972 MRC MOUND FABRICATED SOURCES (Loan Program Inventorv)
Not Satisfactory Satis fa ctory Tot.
Test
~for DNET for DNET Rema rks Tes-Radiography 20 5.
a 2
Outer liner open 3
Outer liner bulging 20 Inner liner open 5
Inner liner bulging 9
Fuel-liner corrosion Leak Check 23 2
1 Leak > 3x10-6 cc/sec Visual-Dimensional 13 1.
Dose Rate 53
~
5 Neutron Emission 25 2
Totals 20 33 5
s MRC DAYTON FABRICATED SOURCES (Loan Progran Inventory)
Norma 1 Abnorma1 2
Outer liner open 13 Inner liner open 11 Inner liner bulging Leak Check 12 1
1 Leak > 3x10-6 cc/sec Dose Rate 32 3
Tota l s 8
24
~,'; E
[]{)g 3