Category:E-Mail
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23186A1392023-07-0505 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083) ML23131A1492023-05-10010 May 2023 2023 V.C. Summer Commercial Grade Dedication Inspection Information Request ML23044A3392023-02-13013 February 2023 NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002) ML23027A0122023-01-26026 January 2023 002 Radiation Safety Baseline Inspection Information Request ML23026A0152023-01-23023 January 2023 NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion Slides ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22173A0292022-06-17017 June 2022 NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052) ML22139A2302022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060) ML22139A2322022-05-19019 May 2022 NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059) ML22084A4052022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21197A0432021-07-15015 July 2021 VCS ISI 2021004 RFI - Combined ML21187A1242021-06-28028 June 2021 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification ML21173A1782021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21125A1942021-05-0505 May 2021 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20316A0122020-11-0404 November 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20302A2032020-10-28028 October 2020 NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) ML20260H4262020-09-0303 September 2020 NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885 ML20178A5892020-06-26026 June 2020 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124) ML20178A5932020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19 ML20178A5912020-06-23023 June 2020 NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21 ML20149K4262020-05-21021 May 2020 NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092) ML19218A3742019-08-0606 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19214A2732019-08-0202 August 2019 NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19155A2752019-06-0404 June 2019 VC Summer 2019003 Rad Safety Inspection Document Request ML19140A2692019-05-17017 May 2019 Acceptance of Alternative Request (RR-4-23)to Utilize Code Case N-513-4 ML19105B1652019-04-15015 April 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Credit for the Abeyance RCP Seals ML19102A0702019-04-11011 April 2019 NRR E-mail Capture - V.C. Summer, Unit 1: Relief Request (RR-4-22) Verbal Authorization Script ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19095A6582019-03-0404 March 2019 NRR E-mail Capture - VC Summer SPRA Review - Clarification Questions on Peer Review Findings and Plant Modifications ML19095A6672019-01-30030 January 2019 NRR E-mail Capture - VC Summer SPRA Clarification Questions on Circuit Analysis and Relay Replacement ML19031B4332019-01-29029 January 2019 Email Regarding VC Summer Units 2 & 3 Letter from Santee Cooper on Termination of COL ML19009A1052019-01-0909 January 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-10-02395, TS 3.8.2, D.C. Sources - Operating ML19009A5362019-01-0909 January 2019 NRR E-mail Capture - VC Summer Clarification Question on Fussell-Vesely Values 2024-01-25
[Table view] |
Text
NRR-DMPSPEm Resource From: Valentin-Olmeda, Milton Sent: Friday, November 16, 2018 2:36 PM To: STEWART, TRACEY Cc: MOORE, MICHAEL S; KIRKLAND, WILLIAM HANK; Sebrosky, Joseph
Subject:
VC Summer SPRA - Request for ePortal Information on Fragilities
- Tracey, As part of the ongoing audit review of the VC Summer Seismic PRA submittal (ADAMS Accession No. ML18271A109), the NRC staff is completing a technical checklist similar to that in Enclosure 1 of our letter dated July 10, 2018 (ADAMS Accession No. ML18115A138). To proceed, the following information is requested for clarification purposes:
Question 1 - TOPIC #4: Adequacy of the Structural Model (SPID Section 6.3.1)
Section 4.3 of the Seismic PRA submittal provides a general discussion on meeting SPID Section 6.3.1 Criteria 1 through 7. Provide documentation that demonstrates meeting the SPID criteria for at least one of the structures in Seismic PRA Table 4.3-1 that houses SEL equipment.
Question 2 - TOPIC #4: Adequacy of the Structural Model (SPID Section 6.3.1)
Provide documentation that supports the disposition of F&O 24-7 (SFR-D1) regarding the assessment of liquefaction potential near the Service Water Pump House and provide details on the HCLPF capacity evaluation addressed in the Table A-5 of the Seismic PRA submittal. Your response should demonstrate that liquefaction is negligible given the new seismic hazard and that it will not affect the results of the seismic PRA.
Question 3 - TOPIC #6: Use of Seismic Response Scaling (SPID Section 6.3.2)
Provide a discussion of the approach used to develop fragilities for the Service Water Pond Dam and the nuclear steam supply system (NSSS) using scaling of existing analyses. Specifically, discuss the existing ISRS, shapes of the previous UHS/RLE, shapes of the new UHS/RLE, and structural natural frequencies, modes shapes, and participation factors to ensure that SPID Section 6.3.2 was followed.
Question 4 -TOPIC #7: Use of New Response Analysis for Building Response, ISRS, and Fragilities Seismic PRA Table 5.4-3 identifies Very Small LOCA Fragility (SF-VSLOCA) as a significant contributor to SCDF. Provide documentation that demonstrates consistency between the hazard and response analyses for computing SF-VSLOCA fragility.
Question 5 - TOPIC #9: Use of the CDFM/Hybrid Methodology for Fragility Analysis (SPID Section 6.4.1)
Seismic PRA Table 5.4-3 identifies Relay Chatter (Relay_0.11AC) as a significant contributor to SCDF. However, the SPRA submittal does not explain the process for developing the relay fragility. To confirm that the Hybrid methodology in Section 6.4.1 and Table 6-2 of the SPID was used appropriately for developing the full seismic fragility curves, explain or provide documentation illustrating the development of fragility values for Relay_0.11AC provided in Seismic PRA Table 5.4-3. To support this response, consider to describe the structural analysis of the building where Relay 0.11AC is located, describe the process to develop the ISRS, and describe the adequacy of the structural modeling associated with it.
Question 6 - TOPIC #11: Capacities of Relays Sensitive to High Frequencies (SPID Section 6.4.2)
Seismic PRA Section 4.4.2 identifies that capacity relays sensitive to high-frequencies were evaluated in accordance with two EPRI documents (Ref [42] and Ref [43] of the SPRA submittal). Please clarify 1
whether circuit analysis and operator actions were considered in relay chatter analysis and provide details of the approaches in these analyses to demonstrate that the guidance in SPID Section 6.4.2 was followed.
Question 7 - TOPIC #12: Selection of Dominate Risk Contributors that Required Fragility Analysis Using the Separation of Variables Methodology (SPID Section 6.4.1)
Section 4.4.1 of the Seismic PRA submittal notes that refined analyses, including separation of variables (SOV) analyses, were performed for important risk contributors. However, the use of SOV analyses to determine that a component is an important risk contributor was not explained. In order to confirm that the guidance in SPID Section 6.4.1 was followed, please explain or provide documentation illustrating the development of the fragility of the RB IA Suction Isolation Valve (SF-XVT2662B) to confirm it was done in accordance with the SOV approach. To support this response, consider to describe the structural analysis of the building where the component is located, describe the process to develop the ISRS, and describe the adequacy of the structural modeling associated with it.
It would be very helpful to have responses to these questions available in your ePortal by December 14, 2018, or sooner.
We are available to discuss the information in this email.
Please let me know if there are any questions.
Respectfully, Milton Valentín, PM US NRC Division of Licensing Projects Beyond Design Basis Management (Fukushima)
Office of Nuclear Reactor Regulation Milton.Valentin@nrc.gov 301-415-2864 2
Hearing Identifier: NRR_DMPS Email Number: 911 Mail Envelope Properties (Milton.Valentin-Olmeda@nrc.gov20181116143500)
Subject:
VC Summer SPRA - Request for ePortal Information on Fragilities Sent Date: 11/16/2018 2:35:51 PM Received Date: 11/16/2018 2:35:00 PM From: Valentin-Olmeda, Milton Created By: Milton.Valentin-Olmeda@nrc.gov Recipients:
"MOORE, MICHAEL S" <MICHAEL.S.MOORE@scana.com>
Tracking Status: None "KIRKLAND, WILLIAM HANK" <WILLIAM.KIRKLAND@scana.com>
Tracking Status: None "Sebrosky, Joseph" <Joseph.Sebrosky@nrc.gov>
Tracking Status: None "STEWART, TRACEY" <TRACEY.STEWART@scana.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4918 11/16/2018 2:35:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: