Supplemental Information - Topical Report TR-213, 40th Year Reactor Building Tendon Surveillance (Period 10)
ML18351A091
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/07/2018
From: Callan E
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMl-18-107 TR-213
Download: ML18351A091 (2)


Text

,AP;@=/ .

, f9 Exelon Generation Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Middletown, PA 17057 Telephone 717-948-8000 TMl-18-107 December 7, 2018 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Supplemental Information - Topical Report TR-213, 40th Vear Reactor Building Tendon Surveillance (Period 10)

Reference:

Exelon Generation Company, LLC Letter to USN RC Three Mile Island Nuclear Station, Unit 1 40th Year Tendon Surveillance Engineering Report (Topical Report 213), dated June 30, 2014 (TMl-14-061)

In the above reference, Exelon Generation Company, LLC (EGC) provided a report on the inspection results of the Post-Tensioning System and containment surface. An issue was discovered during a

. subsequent review of the report. The value of measured tendon pre-stress force for tendon D303 was listed as 1,165 kip rather than actual 1,200 kip on page 24, Table 3 - 7. This was a single error in the report that does not change any of the conclusions and is a conservative error for any areas in which the reported value was used.

The attached is a corrected page 24 of 49 in the referenced report. The correction pertains to the table that starts on page 23 of 49 titled "Table 3 - 7: Summary of Dome Tendon Forces"; the table concludes on page 24 of 49 with the affected value on the last row of the column labeled "Force, kip" in which the original report listed value was "1,165", with the corrected value of "1,200" listed on the attached. All other information in the table is correct.

No new regulatory commitments are established by this submittal. If you have any questions or additional information is needed, please contact Mike Fitzwater at 717-948-8228.

Respectfully,

~W {YJ L Edward W. Callan Site Vice President, Three Mile Island Unit 1 Exelon Generation Company, LLC cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector-Thr ee Mile Island Nuclear Station NRC Project Manager, NRR -Three Mile Island Nuclear Station R. R. Janati, Chief, Division of Nuclecir Safety, Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection

Attachment Three Mile Island Nuclear Station, Unit 140th Year Tendon Surveillance Engineering Report (Topical Report 213)

Corrected Attachment 1, Page 24 of 49 Topical Report No. 213 Revision 0 Page 24 of 49 0 122 1,119 0 225 1,088 35 35.6 0322 1,135 0342 1,150 0 146 1,184 0 225 1,106 40 39.6 0 237 1,167 0 303 1,200 1350 , . - - - - - - . - - - - - - - . - - - - - - , . - - - ~ - - - . - - - - - - -

1270 9 - 35 76 lJ1 i- T 46Yl5 1250 + - - - - + - - - - - - + - - - - - - + - - - - - - - - - ~ - - - - - - --<

T = 90Yf'J Jil. *

~ 1.200 -t-.=:--i,------+-----~ ~ - - - - t - - -. -- - + - - - + - - - - -4 Mo

~ 1 1~ + - - - - - - - - - - + - - - == -..:::::H...-- _ ; . - - l - - - - - --l tr.

I COO + - - - - - - - + - - - - - - + - - - - - - + - - - - - - - + - - - + - - - - - - <

20 25 0 35 40 Ln (T. Yeus Since SIT)

Fig ure 3 - 3 : Dome Te nd on Fon:e Pre diction