|
---|
Category:Letter
MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20240122024-11-12012 November 2024 Restart Inspection Report 05000255/2024012 ML24312A2262024-11-0606 November 2024 Letter from C. Nelson, Michigan SHPO Regarding Palisades Nuclear Plant Architectural Survey ML24310A0142024-11-0505 November 2024 Ape Notification to Mackinac Bands of Chippewa Palisades ML24310A0132024-11-0505 November 2024 Ape Notification to Grand River Bands of Ottawa Indians Palisades ML24292A1572024-11-0505 November 2024 Ape Notification to Burt Lake Band Palisades ML24309A1872024-11-0404 November 2024 Ape Notification to Grand Portage Band of Lake Superior Chippewa Palisades ML24309A2102024-11-0404 November 2024 Ape Notification to Saginaw Chippewa Indian Tribe of Michigan Palisades ML24309A2122024-11-0404 November 2024 Ape Notification to Sault Ste. Marie Tribe of Chippewa Indians Palisades ML24309A1912024-11-0404 November 2024 Ape Notification to Lac Du Flambeau Band of Lake Superior Chippewa Indians Palisades ML24309A1832024-11-0404 November 2024 Ape Notification to Bois Forte Band of the Minnesota Chippewa Tribe Palisades ML24309A2112024-11-0404 November 2024 Ape Notification to Saint Croix Chippewa Indians of Wisconsin Palisades ML24309A2132024-11-0404 November 2024 Ape Notification to Turtle Mountain Band of Chippewa Indians Palisades ML24309A2082024-11-0404 November 2024 Ape Notification to Red Cliff Band of Lake Superior Chippewa Indians Palisades ML24292A0492024-11-0404 November 2024 Ape Notification to Bad River Band of the Lake Superior Tribe of Chippewa Indians Palisades ML24309A2092024-11-0404 November 2024 Ape Notification to Red Lake Band of Chippewa Indians Palisades ML24309A2032024-11-0404 November 2024 Ape Notification to Ottawa Tribe of Oklahoma Palisades ML24309A1862024-11-0404 November 2024 Ape Notification to Forest County Potawatomi Community Palisades ML24309A1842024-11-0404 November 2024 Ape Notification to Chippewa Cree Indians of the Rocky Boys Reservation of Montana Palisades ML24309A1952024-11-0404 November 2024 Ape Notification to Little River Band of Ottawa Indians Palisades ML24309A1902024-11-0404 November 2024 Ape Notification to Lac Courte Oreilles Band of Lake Superior Chippewa Palisades ML24309A2022024-11-0404 November 2024 Ape Notification to Nottawaseppi Huron Band of the Potawatomi Palisades ML24309A2052024-11-0404 November 2024 Ape Notification to Prairie Band Potawatomi Nation Palisades ML24309A1972024-11-0404 November 2024 Ape Notification to Little Traverse Bay Bands of Odawa Indians Palisades ML24309A2002024-11-0404 November 2024 Ape Notification to Miami Tribe of Oklahoma Palisades ML24309A1982024-11-0404 November 2024 Ape Notification to Match E Be Nash She Wish Band of Pottawatomi Indians Palisades ML24309A1922024-11-0404 November 2024 Ape Notification to Lac Vieux Desert Band of Lk Superior Chippewa Indians Palisades ML24309A2072024-11-0404 November 2024 Ape Notification to Quechan Tribe of the Fort Yuma Indian Reservation Palisades ML24309A1992024-11-0404 November 2024 Ape Notification to Menominee Indian Tribe of Wisconsin Palisades ML24309A1882024-11-0404 November 2024 Ape Notification to Grand Traverse Band of Ottawa and Chippewa Indians Palisades ML24309A2012024-11-0404 November 2024 Ape Notification to Mille Lacs Band of Ojibwe Palisades ML24309A1822024-11-0404 November 2024 Ape Notification to Bay Mills Indian Community Palisades ML24309A2042024-11-0404 November 2024 Ape Notification to Pokagon Band of Potawatomi Indians Palisades ML24309A1892024-11-0404 November 2024 Ape Notification to Hannahville Indian Community Palisades ML24309A1852024-11-0404 November 2024 Ape Notification to Citizen Potawatomi Nation Palisades ML24292A0072024-11-0404 November 2024 Ape Notification to Achp Palisades ML24309A1932024-11-0404 November 2024 Ape Notification to Leech Lake Band of Ojibwe Palisades ML24309A2142024-11-0404 November 2024 Ape Notification to White Earth Band of Minnesota Chippewa Tribe Palisades ML24309A2062024-11-0404 November 2024 Ape Notification to Prairie Island Indian Community Palisades PNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations 2024-09-06
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000255/LER-2021-001, Atmospheric Steam Dump Valves Inoperable Due to Relay Failure2021-08-13013 August 2021 Atmospheric Steam Dump Valves Inoperable Due to Relay Failure ML18344A4142018-12-10010 December 2018 LER 1979-037-00 for Palisades Nuclear Plant, Two Manual Three Inch Containment Isolation Valves in Bypass Line Were Discovered to Be Locked Open 05000255/LER-2017-0022017-07-17017 July 2017 Reactor Protection System Actuation While the Reactor was Shutdown, LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown 05000255/LER-2017-0012017-05-24024 May 2017 Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions PNP 2014-100, Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations2014-11-19019 November 2014 Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations PNP 2011-009, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor2011-02-10010 February 2011 Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor ML0726101822007-09-14014 September 2007 Cancellation of Licensee Event Report 07-003, Potential for Reduced Component Cooling Water Cooling Capability ML0609002832006-03-30030 March 2006 Cancellation of Licensee Event Report 05-006, Inoperable Containment Due to Containment Air Cooler Through-Wall Flaws ML18347B2971998-05-19019 May 1998 Submit, NPDES Notification Report, Incident No. Pal-98-05-NC138 for NPDES Permit No MI0001457 Re Difference from Daily Maximum Effluent Limitation for Facility ML18348A9021989-02-0707 February 1989 LER 1988-005-01 for Palisades, Inadequate Procedure Results in Valve Testing During Prohibited Conditions ML18346A2471981-06-19019 June 1981 LER 1981-020-00 for Palisades Nuclear Plant, Pcs Unidentified Leakage Greater than 1.0 Gpm ML18346A2481981-05-13013 May 1981 LER 1981-015-00 for Palisades Nuclear Plant, Safety Injection Tank Boron Concentration ML18346A2491981-02-20020 February 1981 LER 1981-005-00 for Palisades Nuclear Plant, Update - Inoperable Diesel Generator ML18346A2501981-02-19019 February 1981 LER 1981-007-00 for Palisades Nuclear Plant, Inoperable Auxiliary Feedwater Pump ML18346A2511981-01-26026 January 1981 LER 1981-002-00 for Palisades Nuclear Plant, Inadequate Mounting of DC Distribution Panel ML18346A2521981-01-16016 January 1981 LER 1981-001-00 for Palisades Nuclear Plant, During Charging of Station Batteries, Output Breakers of Both Batteries Were Inadvertently Opened for Approximately One Hour ML18346A2531981-01-14014 January 1981 LER 1980-046-00 for Palisades Nuclear Plant, Hydraulic Snubber Failure ML18346A2541981-01-0707 January 1981 LER 1980-045-00 for Palisades Nuclear Plant, Low Condensate Makeup Inventory ML18347A8141980-10-10010 October 1980 LER 1980-037-00 for Palisades Nuclear Plant, Pipe Support Sway Struts Identified to Have the Potential of the Bushing Becoming Loose And/Or Disengaged from the Clamp End of the Sway Strut ML18347A8461980-08-27027 August 1980 License Event Report 1980-027-00 Re Gaseous Release, Extended Due Date of Reporting by Region III on 8/26/1980 ML18347A8471980-08-12012 August 1980 License Event Report 1980-024-00 Re Containment High Radiation Monitor ML18347A8481980-08-0808 August 1980 License Event Report 1980-023-00 Re Containment High Radiation Monitor ML18347A8491980-08-0808 August 1980 License Event Report 1980-022-00 Re Inoperable Nuclear Instrumentation ML18347A8501980-08-0606 August 1980 License Event Report 1980-021-00 Re Misaligned Containment Sump Valve ML18347A8521980-07-29029 July 1980 License Event Report 1980-020-00 Re Misaligned Control Rod ML18347B2071980-06-19019 June 1980 Licensee Event Report 80-018 Regarding Oil Level in Snubber No. 2 Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2081980-06-13013 June 1980 Licensee Event Reports 80-014, 80-015, and 80-016 Regarding Oil Level in Snubbers No. 5, 9, and 7 Were Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2091980-05-15015 May 1980 Licensee Event Report 80-012 Regarding Bottom Half of the Barrier for Fire Penetration HO-12 Was Missing During Inspection of Fire Barriers ML18347B2101980-05-14014 May 1980 License Event Report 1980-011-00 Re Improper Return-to-Service of Porv'S ML18348A9071980-05-12012 May 1980 Submittal of LER 1980-006-00 Purge Valve T-Ring Air Supplies ML18348A9051980-05-12012 May 1980 Submittal of LER 1980-008-00 Update of Valve Leakage ML18347B1411978-09-0606 September 1978 LER 1978-029-00 for Palisades Plant Re Lower Level of Hydrazine in Iodine Removal Tank Due to Approximately 6% of Drainage from the Tank T-102 ML18347B1421978-08-18018 August 1978 LER 1978-028-00 for Palisades Plant Re Containment Building Purge Valve T-Ring in CV-1806 Was Not Pressurized ML18347B1441978-08-11011 August 1978 LER 1978-022-00 for Palisades Plant Re Four Incore Alarms Following Reactor Start-up ML18347B1451978-08-10010 August 1978 LER 1978-021-00 for Palisades Nuclear Plant, Containment Purge Supply Valve CV-1808 Failed to Open During Monthly Test ML18347B1491978-07-20020 July 1978 LER 1978-024-00 & LER 1978-025-00 for Palisades Nuclear Plant, Steam Generator Ph Dropped to 8.02 & One of Two Heaters for T-53B (Concentrated Boric Acid Tank) Failed ML18347B1781978-04-28028 April 1978 License Event Report LER-78-000-00 Re Out-of-Sequence Rod Withdrawal ML18347B1801978-04-19019 April 1978 License Event Report 78-008: Cycle 2 Core Axial Power Distribution Limits of TS 3.10.3 Were Exceeded by Approximately 12% for Steady State Operation During Cycle 2 ML18347B1811978-03-27027 March 1978 License Event Report 1978-007-00 Relates to Electrical Connectors Inside of Containment ML18347B1841978-03-13013 March 1978 Two Updated License Event Reports, LER-78-004 & LER-78-006 ML18348A1951978-03-0202 March 1978 License Event Report 1978-006-00 Re Shipping Cask Movement ML18347B1851978-03-0202 March 1978 License Event Report 1978-005-00 Re Steam Generator Level Instrumentation ML18348A1961978-03-0101 March 1978 License Event Report 1978-004-00 Re Steam Generator Pressure Instrumentation ML18348A1971978-02-0101 February 1978 License Event Report 1977-065-00 Re Operation in a Degraded Mode Permitted by a Limiting Condition for Operation ML18348A1981978-02-0101 February 1978 License Event Report 1978-003-00 Re CV-3025 Failed Closed ML18348A1991978-01-20020 January 1978 LER 1977-063-00 Re Iodine Removal System Hydrazene Tank, LER 1978-001-00 Re Containment Door Interlock Failure & LER 1978-002-00 Re Setpoints of Five Valves Were Outside Band ML18348A2001978-01-0606 January 1978 License Event Report 1977-062-00 Re Iodine Removal System Naoh Tank (T-103) ML18348A2011978-01-0606 January 1978 License Event Report 1977-064-00 Re HPSI Pump P-66B ML18348A2021977-12-21021 December 1977 LER 1977-054-00 Re Four Coincident In-Core Alarms, LER 1977-057-00 Re Pressure Set Point for Channel C, & LER 1977-058-00 Re De-Energized R Bus ML18348A2031977-12-16016 December 1977 License Event Report 1977-055-00 Re Loss of Off-Site Power and Plant Trip 2021-08-13
[Table view] |
Text
consumers Power company September 20, 1977 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKEI' 50-255 - LICENSE DPR PALISADES PLANT - CORRECTED ER-77 SI TANK LEVEL Attached is the corrected Licensee Event Report ER-77-40.
David P Hoffman Assistant Nuclear Licensing Administrator CC: ASchwencer, USNRC SEP 2 6 1977
~ CORRECTED ~
WllCENSEE EVENT REPORT W
...... -~ ............... Palisades
. CONTROL BLOCK:j,__.......___.__..__.........._ __. (PLEASE PRINT ALL REQUIRED INFORMATION) 1 6 LICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE
@EllMlrlPIAl1l1I lolol-lololololol-1 olol 14111111111 Io 111 7 8 9 14 15 25 26 30 31 32 REPORT REPORT TYPE SOURCE DOCKl;T NUMBER EVENT OATE REPORT DATE
@E]coN'T 7 8 r* r*58I L!.I 57 59
~
60 lol5lol-lol215l5I 61 68 lol8l1l8l1l1I 69 74 lol8l3lol1l1l 75 80 EVENT DESCRIPTION 10121 I On August 17, 197.7 T-82C safety injection tank was drained to 48 percent level for 7 8 9 80 lol3l I maintenance on the level switches and transmitter. On August 18 the level transmitter I 7 8 9 80 lol41 I reference and measuring legs were backfilled. This action resulted in the indicated I 7 8 9 80 10151 ) level going to. zero. A review of the applicable logbooks does not account for the I 7 8 9 80 jol61 I water loss. It appears that T-82C level was less than (Contd on Line 18) I 7 8 9 PRIME (ER- 77 -40 ) 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPUER MANUFACTURER VIOLATION 7
@£]Isl 8 9 10 Fl ~
11 I A I c I c I ul MI uI 12 17 W 43 IFl1l8lol 44 47 w48 CAUSE DESCRIPTION
@Jfil I Referenc~s ER-77-29. -34. -36. This failure appears to be related to repairs made as I 7 8 9 80 lojej Ia result of reference ERs. Future problems should now be eliminated. I 7 8 9 80
~
7 8 9 80 FACILITY METHOD OF DISCOVERY DISCOVERY DESCRIPTION w
STATUS 'J6 POWER OTHER STATUS 7
El2]
8 9 L_qJ Io 10 I o I o12I 13 Cold Shutdown 44 45 I
46 NA 80 FOAM OF ACTIVITY CONTENT 7
rn 8 RELEASED 9
L.!J OF RELEASE L!J 10 11 I
AMOUNT OF ACTIVITY NA I 44 45 NA LOCATION OF RELEASE 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION 7
[!EJ 8 9 lololol 11 w12 13 NA 80 PERS"ONNEL INJURIES EE! NUMBER lol olol DESCRIPTION
.______N_A______________________________________________~
7 8 9 11 12 80 PROBABLE CONSEQUENCES
- ~ I Minimal since the four safety injection tanks are sized to insure that three of the 7 B 9 tanks will provide sufficient water to flood the core following a DEA. 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION
~ ~ .______N_A________________________________________~---------'
7 8 9 10 80 PUBLICITY Gm8 7 9 NA 80 ADDITIONAL FACTORS (Contd From Event Description)
~ I the 186" required by Technical Specification 3.3.1.b for some unknown period during 7 B 9 80
~ I previous power operation.
7 8 9 80