ML18346A519

From kanterella
Jump to navigation Jump to search
Presentation Slide: Insights from AMP Reg Con 2018 Final
ML18346A519
Person / Time
Issue date: 12/12/2018
From: Carla Roque-Cruz
NRC/NMSS/DSFM/IOB
To: Haile Lindsay
NRC/NMSS/DSFM/IOB
Lindsay H
Shared Package
ML18338A059 List:
References
Download: ML18346A519 (12)


Text

Insights from Aging Management Program Temporary Instruction Inspections Carla P. Roque-Cruz NMSS/DSFM/IOB U.S. NRC Regulatory Conference December 12, 2018

Purpose To provide an informative overview on the status of the AMP TI 2690/011 (ADAMS Accession No. ML17167A268) implementation and insights from those TI inspections.

December 12, 2018 NMSS REG CON 2018 2

Timeline AMP TI TI IMPLEMENTATION IP December 12, 2018 NMSS REG CON 2018 3

Selection Criteria for TI Implementation

  • Renewed Specific License or CoC
  • Specific and General Licensees
  • Prior to the development of the SRP for Renewal of Specific Licenses and CoC for Dry Storage of Spent Nuclear Fuel (Pre-SRP NUREG-1927)
  • One from each Region
  • Different Types of DCSS Designs December 12, 2018 NMSS REG CON 2018 4

Contents of TI 2690/011

1. Scope 6. Acceptance Criteria
2. Preventive Actions 7. Corrective Actions
3. Parameters Monitored or 8. Confirmation Process Inspected
4. Detention of Aging Effects 9. Administrative Controls
5. Monitoring and Trending 10. Operating Experience December 12, 2018 NMSS REG CON 2018 5

Completed TI Inspections

  • Prairie Island
  • Inspection dates: April 23 - 25, 2018
  • Inspection performed during loading campaign
  • TI completion documented in Prairie Islands integrated inspection report (ADAMS Accession No.ML18212A299)
  • Document review and visit to ISFSI December 12, 2018 NMSS REG CON 2018 6

Completed TI Inspections

  • Calvert Cliffs
  • Inspection dates: October 10-11, 2018
  • TI completion will be documented in Calvert Cliffs integrated inspection report in early 2019
  • Document review and visit to ISFSI December 12, 2018 NMSS REG CON 2018 7

Observations Use of document hierarchy to define the AMP Interaction between routine plant activities and AMP activities

- Acceptance criteria for AMP requirements

- Use of routine plant procedures and/or AMP procedures

- Documentation of completed AMP activities December 12, 2018 NMSS REG CON 2018 8

Next Steps

  • AMP TI Inspection at Oconee and H.B Robinson scheduled for January 21-25, 2019
  • Gather all the information from four completed TI inspections
  • Develop inspection procedure December 12, 2018 NMSS REG CON 2018 9

Summary

  • Past: Used the selection criteria and identified 4 sites to implement the TI
  • Current: Conduct TI inspection activities using the 10 program elements
  • Ahead: Develop an inspection procedure upon completion of the TI inspections.

December 12, 2018 NMSS REG CON 2018 10

Acronyms

  • TI Temporary Instruction
  • IP Inspection Procedure
  • CoC Certificate of Compliance
  • SRP Standard Review Plan
  • DCSS Dry Cask Storage Systems
  • ISFSI Independent Spent fuel Storage Installation December 12, 2018 NMSS REG CON 2018 11

December 12, 2018 NMSS REG CON 2018 12