Letter Sequence Supplement |
|---|
CAC:MF9307, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML17053B3932017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17054C2262017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations Project stage: Request ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal Project stage: Response to RAI ML17054C2272017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1 Project stage: Request ML17151A9972017-03-0909 March 2017 Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems Project stage: Request WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17088A3312017-03-22022 March 2017 Transmittal of the Kansas Water Pollution Control Permit and Authorization to Discharge Under the National Pollutant Discharge Elimination System Project stage: Request ML17100A2662017-04-18018 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Acceptance Review ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17132A3632017-05-15015 May 2017 Acceptance of Requested Licensing Action License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses in Addition to Adopting of Alternative Source Term Project stage: Acceptance Review ML17136A3592017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/2016(CAW-16-4499), Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC Enclosure I of the Letter Dated 01/17/2017 Project stage: Withholding Request Acceptance ML17137A2862017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/16 (CAW-16-4500) Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC for Enclosure VI to the Letter Dated 1/17/17 Project stage: Withholding Request Acceptance ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Project stage: Response to RAI ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: RAI ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17297B7972017-10-31031 October 2017 Request for Withholding Information from Public Disclosure (CAC No. MF9307; EPID L 2017-LLA-0211) Project stage: Withholding Request Acceptance ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of .2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of . Project stage: Response to RAI ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18066A0502018-03-0808 March 2018 Regulatory Audit Plan for March 19-21, 2018, in Support of the LAR for Transition to Westinghouse Core Design and Safety Analyses Including Alternative Source Term (CAC No. MF9307;EPID L-2017-LLA-0211) Project stage: Approval L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation2018-03-27027 March 2018 Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation Project stage: Request ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies Project stage: Supplement ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18115A3522018-05-0303 May 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated April 16, 2018 Supplemental 30 Day Responses to NRC RAI WCGS Transition to Westinghouse Safety AST Methodolgies Project stage: RAI ML18107A7562018-05-0303 May 2018 Regulatory Audit Summary License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: Other ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18183A5832018-07-23023 July 2018 Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses Project stage: RAI 05000482/LER-2018-001, Inappropriate Use of Blind Flange for Containment Isolation Valve Results in Condition Prohibited by Technical Specifications2018-10-0404 October 2018 Inappropriate Use of Blind Flange for Containment Isolation Valve Results in Condition Prohibited by Technical Specifications Project stage: Request ML18332A1772018-10-25025 October 2018 Email Slides for 10/30 Public Meeting Project stage: Request ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure Project stage: Request ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting Project stage: Meeting ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Response to RAI WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Request ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station Project stage: Meeting ML18327A1342018-11-30030 November 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 25, 2018, Executed by Mr. Paul A. Russ, Westinghouse (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18360A0342018-12-21021 December 2018 NRR E-mail Capture - Review Schedule for Wolf Creek Generating Station License Amend Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Approval ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption Project stage: Response to RAI ML19070A1392019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Request ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program Project stage: Response to RAI ML19099A1772019-04-16016 April 2019 Request for Withholding Information from Public Disclosure, 2/13/19 Affidavit Executed by Stephen Rigby, Westinghouse Electric Company LLC RAI Response Related to Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: RAI ML19122A2552019-05-0202 May 2019 Closed Predecisional Enforcement Conference with an Employee of Wolf Creek Nuclear Operating Corporation Project stage: Request ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Approval 2018-10-30
[Table View] |
Text
Jaime H. McCoy Site Vice President weLFCREEK
- ,NUCLEAR OPERATING CORPORATION August 9, 2018 WO 18-0034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1)
Letter ET 17-0001, dated January 17, 2017, from J. H. McCoy, WCNOC, to USNRC
Subject:
- 2)
Electronic mail dated September 21, 2017, from B. K. Singal, USNRC, to W. T. Muilenburg, WCNOC, "Request for Additional Information -
License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC No. MF9307)"
- 3)
Letter ET 17-0024, dated October 18, 2017, from J. H. McCoy, WCNOC, to USNRC
- 4)
Letter ET 18-0018, dated June 19, 2018, from J. H. McCoy, WCNOC, to USNRC Docket No. 50-482:
Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term To Whom It May Concern:
Reference 1 provided the Wolf Creek Nuclear Operating Corporation (WCNOC) application to revise the Wolf Creek Generating Station (WCGS) Technical Specifications (TS).
The proposed amendment would support transition to the Westinghouse Core Design and Safety Analysis methodologies.
In addition, the amendment request included methodology in accordance with 10 CFR 50.67, "Accident Source Term." Reference 2 provided a request for additional information (RAI) related to the application. Reference 3 provided the responses to the RAI contained in Reference 2.
Reference 4 subsequently provided a supplemental response to one of the responses provided. Via teleconference held on June 28, 2018, the NRC requested clarification for the supplemental response provided. This attachment to this letter provides that clarification. The information provided in the attachment is non-proprietary.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
!(IJ ol
, /J If<
!o
- WO 18-0034 Page 2 of 3 The additional information does not expand the scope of the application and does not impact the no significant hazards consideration determination presented in Reference 1.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this submittal is being provided to the designated Kansas State official.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine at (620) 364-4204.
Sincerely, Jaime H. McCoy JHM/
Attachment:
Additional Supplemental Response to Request for Additional Information cc:
K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a K. S. Steves (KDHE), w/a N. H. Taylor (NRC), w/a Senior Resident Inspector (NRC), w/a
WO 18-0034 Page 3 of 3 STATE OF KANSAS
) ) ss COUNTY OF COFFEY )
Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Site Vice President of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing.
document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By ~7i9??~
Jaime H.
Coy Site Vice ~ent SUBSCRIBED and sworn to before me this qt!; day of /l-u3us f
, 2018.
GAYLE SHEPHEARD My Appointment Expires July 24, 2019
~tb#,J,u,,jl Expiration Date _'Y/_o\\_¥,-'--,1~'----'ol'---tJ_J..L..9 __
I
~-..
Attachment to WO 18-0034 Page 1 of 1 Additional Supplemental Response to Request for Additional Information During the final peer review of the RAI responses provided to the Nuclear Performance and Code Branch, an additional concern was identified with the Question 2 response provided in Letter ET 17-0024.
During subsequent clarification calls, further information related to this concern was requested. The requested information is provided below.
NRC ADAMS Accession No. ML17265A014 Question 2 Please provide further justification for the gap fractions assumed in the fuel handling accident analysis. The justification should provide an analysis using NRG-approved methodologies and a power history that bounds limiting plant-specific power histories at Wolf Creek, per RG 1. 183, Footnote 11.
Supplemental Response:
(Provided in WCNOC Letter ET 18-0018, dated June 19, 2018, ADAMS Accession No. ML18177A198)
A clarification call was held on May 29, 2018 to discuss an additional concern that arose during the final peer review of the scope tied to the gap fractions. The concern is regarding limitations on the quantity of fuel that may exceed the RG 1.183, Table 3, Footnote 11 conditions.
As described in the original response, typical Wolf Creek core designs show no exceedances of the Footnote 11 applicability limits. However, there is the possibility that an atypical core design (e.g. Cycle 23) could result in a limited number of rods (much less than 10%) exceeding the Footnote 11 applicability limits. Thus, an upper limit of 10% will be validated on a cycle-by-cycle basis as part of the reload safety analysis checklist.
Additional Supplemental Response:
A clarification call was held on June 28, 2018 to further discuss an additional concern that arose during the final peer review of the scope tied to the gap fractions. The concern is regarding the linear heat rate and burnup limitations on the quantity of fuel that may exceed the RG 1.183 Table 3, Footnote 11 conditions.
As described in the supplemental response, an upper limit for rods exceeding the Footnote 11 applicability limits of 10% will be validated on a cycle-by-cycle basis as part of the reload safety analysis checklist. The linear heat rates and burnups of that 10% will be within the PNNL-18212, Rev. 1, Table 2.9 gap fraction applicability limits (12.2 kw/ft up to 35 GWD/MTU, decreasing to 7.0 kw/ft at 65 GWD/MTU). This will also be validated on a cycle-by-cycle basis as part of the reload safety analysis checklist.
Additionally, it is noted that the previous responses misstated the PNNL-18212, Revision 1 document number as PNNL-1221, Revision 1.