129 APPENDIX KCommercial Nuclear Power Plant Licensing History 1955-2018YearOriginal Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 4 Permanent Shutdowns 7 Operable Units 8 CP Issued 2 Full-Power OL Issued 3 COL Issued 5 Operating COLs 6 1955 1 0- -- -0 0 1956 3 0- -- -0 0 1957 1 1- -- -0 1 1958 0 0- -- -0 1 1959 3 1- -- -0 2 1960 7 1- -- -0 3 1961 0 0- -- -0 3 1962 1 6- -- -0 9 1963 1 2- -- -1 11 1964 3 3- -- -1 13 1965 1 0- -- -0 13 1966 5 2- -- -1 14 1967 14 3- -- -2 15 1968 23 0- -- -1 13 1969 7 4- -- -0 17 1970 10 3- -- -1 20 1971 4 2- -- -0 22 1972 8 6- -- -2 27 1973 14 15- -- -0 42 1974 23 15- -- -2 55 1975 9 2- -- -0 57 1976 9 7- -- -1 63 1977 15 4- -- -0 67 1978 13 4- -- -1 70 1979 2 0- -- -1 69 1980 0 2- -- -0 71 1981 0 4- -- -0 75 1982 0 4- -- -1 78 1983 0 3- -- -0 81 1984 0 6- -- -0 87 1985 0 9- -- -0 96 1986 0 5- -- -0 101 1987 0 8- -- -1 107 1988 0 2- -- -0 109 1989 0 4- -- -3 111 1990 0 2- -- -0 112 1991 0 0- -- -1 111 1992 0 0- -- -2 109 1993 0 1- -- -0 110 1994 0 0- -- -0 109 1995 0 0- -- -0 109 1996 0 1- -- -3 109 1997 0 0 0 0 2 107 1998 0 0 0 0 1 104 1999-2011 0 0 0 0 0 104 130 2012 0 0 4 units 0 0 104 2013 0 0 0 0 4 100 2014 0 0 0 0 1 99 2015 0 1 1 units 0 0 100 2016 0 0 4 units 0 1 99 2017 0 0 1 unit 0 0 99 2018 0 0 2 units 0 0 99Total 177 133 12 units 0 34- - U.S. Atomic Energy Commission was the regulatory authority

- - Not applicable 1 Data in columns 1-3 are based on 10 CFR Part 50 and in columns 4-6 are based on 10 CFR Part 52 2~ Issuance by regulatory authority of a permit, or equivalent permission, to begin construction. ~ Under current~ licensing~

regulations,~the~construction~ permit~ is~ no~ longer issued~ separately~from~the operating license.3~ Numbers reect permits or licenses issued in a given year, not extant permits or licenses.

4. Data in columns 4-6 are based on 10 CFR Part 52.5 Number of applications received for combined licenses (construction and operating) in a given year, including one that was~ subsequently~ withdrawn.~See Appendix A Part 52 on status of plant construction and Appendix B for more information on withdrawn licenses and received applications.6 Issuance by regulatory authority of full-power operating license, or equivalent permission in a given year.7 Number of operating plants transitioned to shutdown in a given year. Does not represent the total number of reactor units included.

8 The number of operable units equals the cumulative number of units holding full-power licenses minus the cumulative number of permanent shutdowns.

Source: U.S. Energy Information Administration/Annual Energy Review 2011 located at www.eia.gov/aer.

and compilation of NRC information following 2011.

APPENDIX KCommercial Nuclear Power Plant Licensing History 1955-2018 (continued)YearOriginal Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 4 Permanent Shutdowns 7 Operable Units 8 CP Issued 2 Full-Power OL Issued 3 COL Issued 5 Operating COLs 6