Category:Letter
MONTHYEARML24318C5002024-11-19019 November 2024 Letter to Robert Blanchard Tribal Chairman Bad River Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3202024-11-18018 November 2024 Letter to Durell Cooper Tribal Chairman Apache Tribe of Oklahoma Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3462024-11-18018 November 2024 Letter to Jaime Loichinger Director Office of Federal Agency Programs, Achp NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3512024-11-18018 November 2024 Letter to Amy Spong, Deputy State Historic Preservation Officer, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5012024-11-18018 November 2024 Letter to Catherine Chavers Tribal Chairwoman Bois Forte Band Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5022024-11-18018 November 2024 Letter to Reggie Wassana Governor Cheyenne and Arapaho Tribes NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5032024-11-18018 November 2024 Letter to Anthony Reider President Flandreau Santee Sioux Tribe NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5042024-11-18018 November 2024 Letter to Jeffrey Stiffarm President Fort Belknap Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5052024-11-18018 November 2024 Letter to Bruce Savage Tribal Chairperson Found Du Lac Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5062024-11-18018 November 2024 Letter to Robert Deschampe Tribal Chair Grand Portage Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5072024-11-18018 November 2024 Letter Timothy Rhodd Chairman Iowa Tribe of Kansas and Nebraska Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5092024-11-18018 November 2024 Letter to Doreen Blaker President Keweenaw Bay Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5102024-11-18018 November 2024 Letter to Louis Taylor Chairman Lac Courte Oreilles Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5112024-11-18018 November 2024 Letter to John Johnson President Lac Du Flambeau Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5152024-11-18018 November 2024 Letter to Faron Jackson Sr Chairman Leech Lake Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5162024-11-18018 November 2024 Letter to James Williams Jr Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5172024-11-18018 November 2024 Letter to Robert Larsen President Lower Sioux Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5182024-11-18018 November 2024 Letter to Gena Kakkak Chairwoman Menominee Indian Tribe of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5262024-11-18018 November 2024 Letter to Lonna Johnson Street Chairperson Spirit Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5192024-11-18018 November 2024 Letter to Michael Laroque President Minnesota Chippewa Tribe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5212024-11-18018 November 2024 Letter to Nicole Boyd Chairwoman Red Cliff Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5202024-11-18018 November 2024 Letter to Grant Johnson President Prairie Island Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5222024-11-18018 November 2024 Letter to Darrell Seki Chairman Red Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5232024-11-18018 November 2024 Letter to Alonzo Denney Chairman Santee Sioux Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5242024-11-18018 November 2024 Letter to Cole Miller Chairman Shakopee Mdewakaton Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5252024-11-18018 November 2024 Letter to J Garrett Renville Tribal Chairman Sisseton Wahpeton Oyate of the Lake Traversee Re NOA Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5272024-11-18018 November 2024 Letter to Thomas Fowler Chairman St. Croix Chippewa of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5302024-11-18018 November 2024 Letter to Michael Fairbanks Chairman White Earth Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5282024-11-18018 November 2024 Letter to Jamie Azure Chairman Turtle Mountain Band of Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5292024-11-18018 November 2024 Letter to Kevin Jensvold Tribal Chairman Upper Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5312024-11-18018 November 2024 Letter to Virgil Wind Chief Executive Mille Lacs Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5322024-11-18018 November 2024 Letter to Robert Vanzile Jr Chairman Sokaogon Chippewa Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR IR 05000263/20240032024-11-13013 November 2024 Integrated Inspection Report 05000263/2024003 IR 05000282/20240032024-11-13013 November 2024 Integrated Inspection Report 05000282/2024003, 05000306/2024003 & 07200010/2024001 ML24310A1682024-11-0505 November 2024 Core Operating Limits Report (COLR) for Cycle 34, Revision 0 ML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing ML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 2024-09-27
[Table view] |
Text
414 Nicollet Mall Minneapolis, MN 55401
(}, Xcel Energy*
RESPONSIBLE BY NATURE
- 800.895.4999 xcelenergy.com July 25, 2018 L-XE-18-007 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Docket 50-282 and 50-306 Renewed Facility Operating License Renewed Facility Operating License Nos. No. DPR-22 DPR-42 and DPR-60 Clarification of Discrepancies in Safety Evaluations for Revision to Emergency Plan Staff Augmentation Response Times Amendments for the Prairie Island Nuclear Generating Plant and Monticello Nuclear Generating Plant
References:
- 1) Letter from NSPM to the NRC, Prairie Island Nuclear Generating Plant, Units 1 and 2 License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times, dated February 23, 2017. (ADAMS Accession No. ML17055C359)
- 2) Letter from NSPM to the NRC, Monticello Nuclear Generating Plant License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times, dated March 24, 2017. (ADAMS Accession No. ML17083A083)
- 3) Letter from NSPM to the NRC, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times (CAC Nos. MF9345 and MF9346), dated September 20, 2017. (ADAMS Accession No. ML17263A433)
- 4) Letter from NSPM to the NRC, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times (CAC No.
MF9467), dated September 20, 2017. (ADAMS Accession No. ML17263B194)
Document Control Desk Page 2
- 5) Letter from NRC to NSPM, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Re: Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos.
MF9345 and MF9346; EPID L-2017-LLA-0175), dated March 5, 2018.
(ADAMS Accession No. ML17362A202)
- 6) Letter from NRC to NSPM, Monticello Nuclear Generating Plant -
Issuance of Amendment Re: Revision to the Monticello Nuclear Generating Plant Emergency Plan (CAC No. MF9467, EPID L-2017-LLA-0179), dated March 5, 2018. (ADAMS Accession No. ML17349A916)
Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter NSPM), hereby submits a letter to clarify discrepancies identified between NSPMs docketed correspondence associated with the Prairie Island Nuclear Generating Plant (PINGP) and Monticello Nuclear Generating Plant (MNGP) license amendment requests (LARs)
(References 1-4) and the corresponding NRC safety evaluations (SEs) documenting the NRC decision to issue amendments to NSPM on March 5, 2018 (References 5 and 6). NSPM recognizes that SEs do not establish licensing bases information. NSPM is identifying these discrepancies to avoid future confusion associated with the licensing basis information following issuance of the licensing action because of the potentially different meaning documented by the NRC staff in the SEs than the meaning contained in NSPMs docketed correspondence and the PINGP and MNGP licensing bases.
The first discrepancy is located in sub-section Offsite Dose Assessment and PARs of section 3.2.4, Radiological Accident Assessment and Support of Operational Accident Assessment/Protective Actions (In-Plant) of both the PINGP and MNGP SEs. The final summary paragraph to that subsection states (emphasis added):
Based on Xcel Energy's current dose assessment capability and the use of a dedicated on-shift position to perform dose assessment, the NRC staff concludes that there is no loss of function or impact on performing dose assessment.
The concern is with the term dedicated, used to describe the on-shift position, which was not used by NSPM in the docketed correspondence. Rather, in item c of subsection Offsite Dose Assessment Major Task, section 3.2.4, Radiological Accident Assessment and Support of Operational Accident Assessment Function, of both the PINGP and MNGP LARs, it was stated (in part):
the augmentation time for the [Radiological Emergency Coordinator (REC)] is extended from 30 minutes to 60 minutes. This change would result in the performance of the dose assessment function by the on-shift Chemistry Technician for an additional 30 minutes.
Document Control Desk Page 3 Further detail is contained in the PINGP Emergency Plan (reference the markup supplied with the PINGP LAR, Enclosure 1, Attachment 1 to Reference 1), section 5.3.3, Plant Shift Organization, subsection H, Chemistry Technician, which states (in part):
One Chemistry Technician is onsite at all times. The Chemistry Technician is responsible for chemistry, radiochemistry, dose assessments, and offsite dose projections. The Chemistry Technician is also cross-trained to support the Radiation Protection Specialist functions...
Correspondingly, the MNGP Emergency Plan, (reference the markup supplied with the MNGP LAR, Enclosure 1, Attachment 1 to Reference 2) section 5.3.1.4, Radiological Assessment and Protective Actions, states:
The shift Chemistry Technician is responsible for initial chemistry sampling, sample analysis, and off-site dose projection operation if required.
As the NRC based part of the conclusion in the SEs upon use of a dedicated on-shift position to perform dose assessment, NSPM notes the term dedicated was not used in any of the submittals in regards to performance of the dose assessment function. Contrary to this, as specified in both the PINGP and MNGP Emergency Plans, the Chemistry Technician is responsible for more than performance of the dose assessment function until the arrival of the REC. Therefore, NSPM clarifies that the shift Chemistry Technician is not solely dedicated to performance of dose assessment.
The second discrepancy is also located in section 3.2.4 of the MNGP SE. Both the MNGP and PINGP SEs state:
Manual dose calculation capability is maintained as a backup to the URI system.
However, while NSPM does utilize manual dose calculation as a backup at PINGP, the backup to URI at MNGP is as described in section 3.1.2.2, Current on-shift dose assessment, of the MNGP LAR, which states:
Manual release rate determination methodology is maintained for use with independent battery powered laptop computers in emergency facilities equipped with the URI system.
As such, the backup to the URI system is not the same at PINGP and MNGP. This specific phrasing documented by the NRC in the SE was neither specified nor implied in the submittals when describing the MNGP backup to URI.
As stated above, NSPM understands that the SE does not establish the licensing basis; therefore, NSPM is not requesting a formal response or revision to the SEs associated with these clarifications.
Document Control Desk Page4 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
t~M:!jlltp7 Director, Nuclear Licensing and Regulatory Services Northern States Power Company - Minnesota cc: Chief, Plant Licensing Branch Ill, Division of Operation Reactor Licensing, USNRC Chief, Branch 2, Division of Reactor Projects, Region Ill, USNRC Administrator, Region Ill, USNRC Project Manager, Monticello and Prairie Island, USNRC Resident Inspectors, Monticello, USNRC Resident Inspectors, Prairie Island, USNRC