|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
'1 NRC FORM 19b U.S. NUCLEAR REGULATOP~OMMISSION OOCKET NUMBER (2 76) sn-sz so~ ~0 FILE NUMBER NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL TO: FROM: DATE OF OOCUMENT Arizo'na Public Service Co, 04/20/78 Mr, John Stolz Phoenix, Arizona 85036 E. E. Van Brunt, Jr. OATE RECEIVED 04/26/78 6fLETTE R E3 NO TO R I ZE 0 PROP INPUT FORM NUMBER OF COPIES RECEIVEO ZfORIGINAL RVUNCLASSIF IE O Qcor v OESCRIPTION ENCLOSURE Forwarding copy of Appendices C & d to rept entitled: "Qualification of An Alternat Electrode Control Program for AWS.Di ~ 1" 1p 100p PLAViT'AIIE: PALO VERDE-UNITS 1~ 2~ & 3 jcm 04/28/78
~i~WrE QA~6em 0 zAC ( NMEO FOR ACTION/INFORMATION ENVIROPPiIENTAL ASSIGNED AD: ORE LTR NCH CHIEF: 'A.JVC BRANCH CHIEF:
PROJECT MANAGER: C~ AA&EZb F LIC. ASST: '.wZ- FL~~
R. HARLESS INTERNAL D IST RI BUTION L S T SYSTEMS SITE SAFETY G V~D ENVIRON ANALYSIS DENTON G MULLER GOSSICK G STAFF FNGINEER'ING L TO ENVIRON TECH ERNST R ACTORS BALLARD LOOD oRS I E'u MANAGEMEVi T ACTOR SAFETY TFCH L ROSS BAER AIIIMILL 2)
LINS NOVAK TLER ROSZTOCZY ANALYSIS CHECK VOLL>IER I S LTZMAN EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: 1JI TIC NSIC REG V J. HANCHETT 781170106 ]
ll 16 CYS SENT CATEGOR tO ACRS NRC FORM ')95 {2 76)
l 1
o a EPiSH4QC RERGZPKX COoEQK*Rf'F P. O. BOX 2I666 ~ PHOENIX, ARIZONA 85036
/~
April 20, 1978 ANPP-10779-" JMA
~
Q) CQ~
/I1 CO~
~CA~
~D1 CJ Director of Nuclear Reactor Regulation B U.S. Nuclear Regulatory Commission C/l Washington, D. C. 20555 Attn: John Stolz, Chief Light Water Reactor Branch No. 1 Re: Palo Verde Nuclear Generating Station Units 1, 2 5 3 Docket No: STN-50-528/529/530 Construction Permit No. CPPR 141/142/143 File: '78-'004-'026
Dear Mr. Stolz:
As requested by your staff, enclosed are 30 copies of Appendices C 5 D to the report "Qalification of An Alternate Electrode Control Program For AWS Dl.l."
Sincerely, E. E. Van Brunt, Jr.
APS Vice President Construction Projects ANPP Project Director EEVBJr/JMA/dlc Enclosure cc: R. L. Robb IIPIIgTlg IIL'I(HI:II.L NI%
D. B. Karner W. H. Wilson W. M. Petro J. E. Kirby D. Keith
'1 r ~
cw 4'>CO ro AP yy CCM g~ n~~
KD Mi 'g l
H 9
l
\
g sI J 1 J
" ij/
NRC FoRM 19> OOCXET I
(z 7B) -$ 2 NUMBER'O FILE NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL NUMBER'O:
FROM: DATE OF OOCUMENT ArPzona Public Service Co 04/20/78 Mr John Stolz. Phoenix, Arizona 85036 E E~ Van Brunt, Jr. DATE RECEIVEO 04/26/78 KLETTER ONOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO ZfO R I G INA I JBll N C LASS IF I E 0 QCOPV OESCRIPTION ENCLOSURE Forwardi.ng copy of Appendices C 8 d to rept entitled: "Qualification of An Alternat Electrode Control Program for AWS D1 F 1" 1p 100p PLANT'AME: PALO VERDE.UNITS 1~ 2~ 5 3 jcm 04/28/78 FOR ACTION/INFORMATION QaACL K&
ENVIRONMENTAL
~
ASSIGNED AD: R LTR CH CHIEF: AJ7C BRANCH CHIEF PROJECT bIANAGER: CO- A7%&G'C.O LIC. ASST: L rsvp B . HARLESS INTERNAL D RI BUTION F1L T SYSTEMS SITE SAFETY G C PDR ENVIRON ANALYSIS DEiiTON G MULLER OSSICK G STAFF 'NGINEER'ING L T ENVIRON TECH C J78- ERNST CTORS BALLARD LOOD oR&(Ev fAGENENT ACTOR SAFETY TECH ROSS BAER Ai&IILL 2 )
NOVAK TLER ROSZTOCZY ALYSIS CHECK VOLLi~IER LINS T AN EXTERNAL DISTRIBUTION CONTROL NUMBE R PDR'lai TIC IC REG V J. HANCHETT) 7811701 16 CYS SENT CATEGORYI tO ACRS
V I
a a O a
Ãulm g3 P. O. BOX
~ISI 2I666 ~
CfOKK!2IP PHOENIX, ARIZONA 65036
+,O CD April 20, 1978, (
a ANPP-10779-JN /
~ "'.
t) )V)
(7 C ~'I (J
J Director of Nuclear Reactor Regulation c5 U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn: John Stolz, Chief Light Water Reactor Branch No. 1 Re: Palo Verde Nuclear Generating Station Units 1, 2 5 3 Docket No: STiil-50-528/529/530 Construction Permit No. CPPR 141/142/143 gq(%If,g> (~~~a><
As requested by your staff, enclosed are 30 copies of Appendices C 5 D to the report "Qualification of An Alternate Electrode Control Program For AWS Dl.l."
Sincerely, E. E. Van Brunt, Jr.
APS Vice President Construction Projects ANPP Project Director EEVBJr/JMA/dlc Enclosure cc: R. L. Robb D. B. Karner W. H. Wilson W. M. Petro J. E. Kirby D. Keith gg pggidb
I ~
j l
1
NRC FORM 1'd8 U.S. NUCI.EAR REGULATO OMMISSION DOCKET (2-76)
FILE NUMSER'e-sz m~ CM NRC DISTRtBUTION FDR PART 50 DOCKET MATERIAL NUMBER'O:
FR9M: DATE OF DOCUMENT Arizona Public Service Co~ 04/20/78 Mr, John Stolz Phoenix, Arizona ,85036 E E Van Brunt, Jr. DATE RECEIVED 04/26/78 GALETTE R ONOTORI2ED PROP INPUT FORM NUMBER OF COPIES RECEIVED ZfOR IGINAI JKlNCLASSIF I ED Elcopv DESCRIPTION ENCLOSURE Forwarding copy of Appendices C & d to rept entitled: "Qualification of An Alternat Electrode Control Program for AWS D1 F 1" 1p 100p PLAiVT'IAIK: PALO VERDE UNITS 1~ 2~ & 3 jcm 04/28/78
~i~Mw gA~~~ OaÃc c FOR ACTION/INFORMATION ENVIROiViIENTAL ASSIGiVED AD: V 7 RE LTR CH CHIEF: BRANCH CHIEF:
PROJECT IifANAGER: C~ AA&E'LD LIC. ASST:
8 . HARLESS INTERNAL D RI BUTION ES T SYSTEiifS SITE SAFETY 8 V R ENVIRON ANALYSIS DENTON G ~IULLER GOSSICK G STAFF ENGIiVEER'ING ITO NVIRON TECH ERNST CTORS BALLARD OOD oR&(HV AG MENT I'ACTOR SAFETY ROSS BAER MILL 2)
LIN VIOVAK ROSZTOCZY YSIS CHECK VOLLilER INS TZvsiN EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:
TIC V. TC G V J. HANCHETT) 7/11/0 16 CYS SENT CATEGOR
0 p IFiSC3EaEQ RKREHVEQEC (QCo)EQlBRK3'P P. O. BOX 2I666 - PHOENIX, ARIZONA 85036
)O CC) r April 20, 1978 ) (..'
ANPP-10779-JMA 4~@
Cl:, r 4/Ir)
Pj Ir1
.: (4J
~C Director of Nuclear Reactor Regulation n frl C3 U.S. Nuclear Regulatory Commission CA Washington, D. C. 20555 Attn: John Stolz, Chief Light Water Reactor Branch No. 1 Re: Palo Verde Nuclear Generating Station Units 1, 2 5 3 Docket No: STiil-50-528/529/530 .cn CI~
Construction Permit No. CPPR 141/142/142 r)A'gg$ <r~
File: 78-'004-026 9>
Dear Mr. Stolz:
As requested by your staff, enclosed are 30 copies of Appendices C 5 D to the report "Qualification of An Alternate Electrode Control Program For AWS Dl.l."
Sincerely, E. E. Van Brunt, Jr.
APS Vice President Construction Projects ANPP Project Director EEVBJr/JMA/dlc Enclosure cc: R. L. Robb D. B. Karner W. H. Wilson W. M. Petro J. E. Kirby D. Keith g9'p bio>
4 0 1