Docket Nos. 50-280 and 50-281 MEMORANDUM FOR:
FROM:
August 27, 1985 Roger D. Walker, Director Division of Project and Resident Region II Hugh L. Thompson, Jr., Director Division of Licensing, NRR e
DISTRIBUTION w/o Docket File NRC PDR LPDR ORB#l Rdg TChan Programs Memo File CParrish JDNeighbors SVarga GLainas HThompson
SUBJECT:
LICENSING ACTION REVIEW FOR SURRY POWER STATION Your assistance is requested in conducting a review of the enclosed submittal as related to snubbers from the Virginia Electric and Power Company, dated August 9, 1985, for Surry Power Station Units 1 and 2.
The product expected from you as a result of your review is a complete safety evaluation report.
Your reviewers should use the Standard Review Plan (SRP) and Standard Technical Specifications (STS) as guidance in determining acceptance criteria, recognizing, of course, that for operating reactors, the criteria in these documents are not requirements.
In accordance with NRR Office Letter No. 44, each safety. evaluation performed by a technical division shall include a separate SALP input.
For purposes of these reviews, the Regional personnel involved are considered part of the technical divisions. Therefore, we are requesting that your forwarding memorandum contain a SALP input for the safety evaluation.
Work for the VEPCo submittal concerning the proposed changes has been discussed with D. Gruber of your staff. The TAC numbers for the reviews are 59466 and 59467 for Surry 1 and 2, respectively.
The requested completion date is October 18, 1985.
Contact with the licensee on this review effort or any significant additional information deemed necessary should be obtained through the NRR Project Manager or with his concurrence.
The Project Manager for this plant is Don Neighbors and he can be reached at 492-4837.
Enclosure:
As stated CONTACT:
D. Neighbors (301) 492-4837 S,Jll9rzad 7J~';-fa-Y Hugh L. Thompson, fr., Director Division of Licensing Office of Nuclear Regulation
- SEE PREVIOUS WHITE FOR CONCURRENCE AD-Q :DL GL~as ORB#l:DL*
ORB#.1:DL ~RB#l: L CParrish TChan;ps ghbors 8/23/85 8fz1[85 85
~
l~' "r-
- 8509040392 S50827
- 1 :.
?DR. ADOCK 05000280 I
p PDR 8~/85 encl.
e Docket Nos. 50-280 and 50-281 oc et 1 e NRC PDR LPDR MEMORANDUM FOR:
FROM:
SUBJECT:
Roger D. Walker, Director Division of Project and Resident Region I I Hugh L. Thompson, Jr., Direct Division of Licensing, NRR TChan ORB#l Rdg ograms Memo File CParrish JDNeighbors SVarga GLainas HThompson LICENSING ACTION REVIEW F SURRY POWER STATION Your assistance is requested in conducti g a review of the enclosed submittal as related to snubbers from t e Virginia Electric and Power Company, dated August 9, 1985, for Sur. y Power Station Units 1 and 2.
The product expected from you as a resul of your review is a complete safety evaluation report.
Your reviewers ould use the Standard Review Plan (SRP) and Standard Techical Specif" ations (STS) as guidance in determining acceptance criteria, recognizing, of course, that for operating reactors, the criteria in these documents e not requirements.
In accordance with NRR Office etter No. 44, each safety evaluation performed by a technical divi ion shall include a separate SALP input.
For purposes of these review, the Regional personnel involved are considered part of the tech *cal divisions. Therefore, we are requesting that your forwarding memor dum contain a SALP input for the safety evaluation.
Work for the VEPCo submi tal concerning the proposed changes has been discussed with D. Grube of your staff. The TAC numbers for the reviews are 59466 and 59467 fa Surry 1 and 2, respectively.
The requested completion date is Oc ober 18, 1985.
Contact with the licensee on this review effort or any ignificant additional information deemed necessary should be obtained rough the NRR Project Manager or with his concurrence.
The P oject Manager for this plant is Don Neighbors and he can be reached at 92-4837.
Enclosure:
As stated CONTACT:
D. Neighbors (301) 492-4837 ORB#l: DL Ckl,-
CPa rri sh ~
8.fJ:J85 Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Regulation ORB#l:DL ORB#l:DL TChan;ps JDNeighbors BC-ORB#l:DL SVarga AD-OR:DL D:DL GLainas HThompson 8/ 85 8/ /85 8/ /85 8/ /85 8/ /85