MONTHYEARML18031A7302018-02-12012 February 2018 Honeywell International, Inc., 2018 Lr - Request for Additional Information Concerning License Renewal Application in the Areas of Integrated Safety Analysis Summary and Management Measures Project stage: RAI ML18031A7262018-02-12012 February 2018 Request for Additional Information Concerning License Renewal Application in the Areas of Integrated Safety Analysis Summary and Management Measures, Honeywell Metropolis Works (Cost Activity Code 000224/04003392/L-2017-RNW-0002) Project stage: Request ML18031A9712018-02-12012 February 2018 Honeywell International Inc., Request for Additional Information Integrated Safety Analysis Summary and Management Measures Renewal of Source Materials License No. SUB-526 Project stage: RAI ML18037B0472018-02-28028 February 2018 Telecon Summary-Honeywell LRA D-RAI Revised ISA and Mm Review 1-2018 Enclosure 2 Project stage: RAI ML18037B0322018-02-28028 February 2018 January 31, 2018 Conference Call to Clarify Draft Request for Additional Information in the Areas of Integrated Safety Analysis Summary and Management Measures, Honeywell Metropolis Works (CAC 000224/04003392/L-2017-RNW-0002) and Enclosures Project stage: Request ML18037B0422018-02-28028 February 2018 Telecon Summary-Honeywell LRA D-RAI Revised on ISA and Mm Review 1-31-2018 List of Participants Enclosure 1 Project stage: RAI ML18037B0372018-02-28028 February 2018 Telecon Summary-Honeywell LRA D-RAI Revised on ISA and Mm Review 1-31-2018 Project stage: RAI ML18113A0722018-04-12012 April 2018 Enclosure 2: Form Honeywell Meeting Summary-ISA and Mm Draft RAI Response April 12, 2018 Project stage: Draft RAI ML18113A0742018-05-15015 May 2018 Meeting Summary - Honeywell-LRA Draft RAI Response on ISA and Mm April 12, 2018 with Enclosure 1 Project stage: Draft RAI ML18187A2202018-06-29029 June 2018 Acknowledgement of Receipt of Centrus Final Status Survey Report for the American Centrifuge Lead Cascade Facility Decommissioning Project Project stage: Other ML18292A5202018-10-25025 October 2018 Acceptance Review of Louisiana Energy Services, LLC, Doing Business as Urenco USA License Amendment Request 18-01 Allowance to Feed UF6 Greater than O.72 WT % 235Urainium, But Less than 1 WT % 235Urainium Project stage: Acceptance Review ML19269B7742019-09-23023 September 2019 Us Dept. of Commerce, National Institute of Standards and Technology - NIST Decommissioning Funding Plan, September 2019 Project stage: Request ML19309E6662019-11-20020 November 2019 Acceptance of Passport Systems Inc.S Request to Terminate SNM-960 Project stage: Acceptance Review ML19317E5702019-11-20020 November 2019 Acceptance Review-2019 Decommissioning Funding Plan Submittal, SNM 362, Docket 07000398 Project stage: Acceptance Review ML20030A6792020-02-0404 February 2020 Request for Additional Information - 2019 Decommissioning Funding Plan Submittal, Special Nuclear Material License, SNM-362, Docket 07000398 (Cac/Epid 000224/07000398/L-2019-DFA-0008) Project stage: RAI ML20030A6812020-02-0404 February 2020 Enclosure 1 NIST 2019 DFP RAI Project stage: Other ML20030A6592020-02-0404 February 2020 Request for Additional Information - 2019 Decommissioning Funding Plan Submittal, SNM 362 Project stage: Request ML20066J9772020-03-0606 March 2020 Updated GEH Vallecitos Nuclear Center Decommissioning Funding Plan (DFP) Project stage: Request ML20085G2162020-04-0303 April 2020 Enclosure, Technical Evaluation Report, NIST 2019 Decommissioning Cost Estimate Project stage: Other ML20085G2152020-04-0303 April 2020 Transmittal, Approval of NIST 2019 Triennial Update to Decommissioning Funding Plan Project stage: Other ML20154K6502020-06-0202 June 2020 GEH Vallecitos Decommissioning Funding Plan Supplemental Information Project stage: Request ML20209A0672020-10-0909 October 2020 Request for Additional Information Letter: Updated DFP for Vallecitos Nuclear Center (Vnc) Project stage: RAI ML20310A2742020-11-0505 November 2020 GE-Hitachi Nuclear Energy Americas, LLC, Response to Nrg Request for Additional Information - Vallecitos Nuclear Center Decommissioning Funding Plan Project stage: Request ML21078A0442021-03-12012 March 2021 Us Dept. of Commerce, National Institute of Standards & Technology, License Amendment Application Project stage: Other ML21126A1162021-05-20020 May 2021 Enclosure 2 - SNM-362 License (Publicly Available) Project stage: Other ML21126A1142021-05-20020 May 2021 Transmittal, Response to License Amendment Request Project stage: Other ML21126A1152021-05-20020 May 2021 Enclosure 1 - SEP G150 Relocation Project stage: Other ML21336A3182021-12-14014 December 2021 Cover Letter - Forward Second Request for Additional Information Re Updated Decommissioning Funding Plan Project stage: RAI ML22012A1482022-01-12012 January 2022 GEH Response to NRC Second Request for Additional Information - Vallecitos Nuclear Center Decommissioning Funding Plan (Enterprise Project Number 000224/07000754/L-2020-DFA-0002) Project stage: Request ML22024A3132022-01-24024 January 2022 GE-Hitachi Nuclear Energy Americas, LLC - Response to NRC Request for Vallecitos Nuclear Center CA-0017-01 Decommissioning Funding Plan Project stage: Request 2020-11-05
[Table View] |
Text
METROPOLIS WORKSUF6Conversion
© 2015 by Honeywell International Inc. All rights reserved. © 2015 by Honeywell International Inc. All rights reserved. Honeywell Metropolis USNRC Source Material License SUB 526-License Renewal Timeline5/11/2007 SUB-526 issued for 10 year term-ML 0621407056/12/2015 HON-NRC meeting Rockville start of renewal activity-ML 15180A24410/27-28/2015 NRC license team site visit to Metropolis2/9/2016 HON-NRC meeting Rockville11/1/16 HON-NRC meeting Rockville2/8/2017 License Renewal Application formally submitted to NRC by HON-ML 17048A2434/5-6/2017 NRC license team site visit to Metropolis-ML 17100A15/2/2017 License Renewal Application formally accepted by NRC (timely renewal status)-ML 17111A7405/31/2017 HON-NRC meeting Metropolis Environmental and Rad RAI clarification & review8/16/2017 HON-NRC meeting Metropolis Chemical Safety, MC&A, Fire Protection, Emergency Response, and Security RAI clarification & review12/13-14/2017 HON-NRC meeting Metropolis Integrated Safety Analysis (ISA) and Management Measures RAI clarification & review4/12/2018 HON-NRC meeting Rockville Active Communications During Renewal2
© 2015 by Honeywell International Inc. All rights reserved. © 2015 by Honeywell International Inc. All rights reserved. Status of Requests for Additional Information (RAI)total ~1173
© 2015 by Honeywell International Inc. All rights reserved. © 2015 by Honeywell International Inc. All rights reserved. Application Overview4Elements of Existing License--(per Reg Guide 3.55)License Application and (SDR)-Environmental Report (per NUREG 1748)-Emergency Response Plan-Decommissioning Funding Plan (DFP) / Decommissioning Cost Estimate (DCE)-Integrated Safety Analysis (ISA) SummaryElements of 2017 Renewal--Meets intent of NUREG-1520SDR removed and consolidated into the new application and ISA Summary-Environmental Report (updated to reflect 40-year term)-Emergency Response Plan (incorporated by reference)-DFP/DCE (incorporated by reference)-ISA Summary updated and changes submitted annually per existing license condition (incorporated by reference)Format and Function Meet Intentof NUREG-1520
© 2015 by Honeywell International Inc. All rights reserved. © 2015 by Honeywell International Inc. All rights reserved. Honeywell Metropolis ISAMTW enhanced/upgraded its licensing basis through Part 40 ISADuring the 2007 license renewal cycle, Honeywell voluntarilyagreed to develop, execute, and maintain an ISA-MTW ISA modeled after Part 70-MTW did not commit to, nor did NRC require, a full Part 70 ISA-NRC concluded that:MTW method consistent with Part 70 ISA guidance in NUREG-1513MTW identified and adequately evaluated credible accident scenariosMTW identified appropriate plant features and procedures (PFAPs) and management measures The ISA and its elements have been subject to review and inspectionduring the course of the current license cycle.-MTW completed implementation of ISA results on November 8, 2007-ISA subject to configuration management measures-MTW submits annual reports to NRCVoluntary execution of ISA ~10 years5
© 2015 by Honeywell International Inc. All rights reserved. © 2015 by Honeywell International Inc. All rights reserved. License Conditions for ISAThe ISA is currently incorporated into SUB-526 as several license conditions-18D = Integrated Safety Analysis (ISA) Summary-19 = Within 180 days of the issuance of the renewed license, all Plant Features and Procedures (to be designated PFAP) shall be developed and implemented within the ISA. The implementation shall include the Configuration Management Program and Facility Change Process.-20 = For changes to the site, structure, processes, systems, components, computer programs, and activities of personnel within the identified PFAP and safety control boundaries that do not require prior NRC approval, Honeywell shall prepare and submit to NRC, within 30 days after the end of the calendar year in which the change was implemented, a brief summary of all such changes. For all changes that affect the Metropolis Works Facility ISA, Honeywell shall submit to the NRC, within 30 days after the end of the calendar year in which the changes were implemented, either a revised ISAsummary or revised ISAsummary pages, as appropriate.ISA Incorporated into MTW License6
© 2015 by Honeywell International Inc. All rights reserved. THIS ENDS THE PUBLIC PORTION OF THE MEETING7