ML18031A730

From kanterella
Jump to navigation Jump to search

Honeywell International, Inc., 2018 Lr - Request for Additional Information Concerning License Renewal Application in the Areas of Integrated Safety Analysis Summary and Management Measures
ML18031A730
Person / Time
Site: 04003392
Issue date: 02/12/2018
From: Liu T Y
NRC/NMSS/DFCSE/ECB
To: Fulks J
Honeywell International, Honeywell Metropolis Works
Liu T
Shared Package
ML18031A726 List:
References
CAC 000224, EPID L-2017-RNW-0002
Download: ML18031A730 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

February 12, 2018 Mr. Jeff Fulks, Plant Manager Honeywell Metropolis Works Honeywell International, Inc.

2768 North U.S. 45 Road P.O. Box 430 Metropolis, IL 62960

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CONCERNING LICENSE RENEWAL APPLICATION IN THE AREAS OF INTEGRATED SAFETY ANALYSIS

SUMMARY

AND MANAGEMENT MEASURES, HONEYWELL METROPOLIS WORKS (COST ACTIVITY CODE 000224/04003392/L-2017-RNW-0002)

Dear Mr. Fulks:

On February 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) received Honeywell International, Inc.'s (Honeywell or the licensee) license renewal application (LRA) for Source Materials License SUB-526, as transmitted by letter dated February 8, 2017 (Agencywide Documents Access and Management System [A DAMS] Accession Number ML17048A263). By letter dated May 2, 2017 (ADAMS Accession Number ML17111A740), the NRC accepted

Honeywell's LRA for detailed review and provided notice of timely renewal status. By letter dated September 20, 2017 (ADAMS Accession Number ML17291A652), Honeywell provided a supplement to its LRA.

The NRC staff has reviewed Honeywell's LRA dated February 8, 2017, as supplemented by letter dated September 20, 2017, and identified that additional information is needed before a final decision can be made on the license renewal request. Specifically, the requests for additional information (RAI) in this letter are in the areas of integrated safety analysis (ISA) summary and management measures.

From December 13 to 14, 2017, the NRC staff conducted a site visit to Honeywell Metropolis Works (MTW) facility, located in Metropolis, Illinois, as part of the LRA review effort. During this visit, the NRC staff clarified the draft RAI (D-RAI) questions in the areas of ISA summary and management measures with Honeywell MTW representatives to ensure that the additional information would meet the needs of the NRC's staff review. Following the site visit, the NRC staff revised the D-RAI questions based on the discussion held with Honeywell MTW representatives to better scope the information needed for the review. On January 24, 2018, the NRC staff sent the revised D-RAI questions pertaining to ISA summary and management measures to Honeywell via email. On January 31, 2018, the NRC staff conducted a conference call with Honeywell representatives for the purpose of clarifying the revised D-RAI questions before formal issuance.

Your response to the RAI in the areas of ISA summary and management measures, as specified in the enclosure, should be provided to the NRC within 60 days from the date of this letter.

J. Fulks 2

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records

System component of the NRC's ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions regarding this request, please contact me at 404-997-4730, or via e-mail at Tilda.Liu@nrc.gov. Sincerely,

\RA\

Tilda Y. Liu, Senior Project Manager Enrichment and Conversion Branch Division of Fuel Cycle Safety, Safeguards and Environmental Review, Office of Nuclear Material Safety and Safeguards

Docket No. 40-3392 License No. SUB-526

Enclosure:

Request for Additional Information cc w/enclosure:

Mr. Mark Wolf, Nuclear Compliance Director Honeywell Metropolis Works

Mr. Sean Patterson, Regulatory Affairs Manager Honeywell Metropolis Works J. Fulks 3

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CONCERNING LICENSE RENEWAL APPLICATION IN THE AREAS OF INTEGRATED SAFETY ANALYSIS

SUMMARY

AND MANAGEMENT MEASURES, HONEYWELL METROPOLIS WORKS (COST ACTIVITY CODE 000224/04003392/L-2017-RNW-0002)

DATE: February 12, 2018

DISTRIBUTION: TNaquin, NMSS RStone, NSIR SAni, NMSS JRubenstone, NMSS KKLine, NMSS MSemmes, NMSS MNorris, NSIR RJohnson, NMSS MSykes, R-II JAnderson, NSIR ARamirez, NMSS JHammelman, NMSS JArce, NSIR CRomán, NMSS CMcKenney, NMSS BSmith, NMSS ASmith, NMSS PKoch, NMSS JRivera-Ortiz, R-II OSiurano, NMSS NPeterka, R-II CPineda, NMSS OLopez, R-II CRoman, NMSS ADAMS Accession Package Number ML18031A726 *via e-mail OFFICE FCSE/ECB FCSE/ERB FCSE/PORSB FCSE/ECB FCSE/ECB NAME *TLiu *AWalker-Smith MKotzalas JZimmerman *O.Siurano for TLiu DATE 02/01/18 01/31/18 02/06/18 02/09/18 02/12/18 OFFICIAL RECORD COPY